2018-1094 Vaisvila SFR (GAHAN) - 181204.pdf DATE: December 4, 2018 TO: Richard Vaisvila FROM: Eric Evensen, Plans Examiner RE: Plan Check: BLD2018-1094 Project Address: 17123 69th Pl W Scope: NEW SFR, VB construction, Plumbing and Mechanical included. Please be advised that the building plans for the above referenced project have been disapproved for the purposes of obtaining a building permit. During a review of the plans by the Building Division for compliance with the applicable building codes, it was found that the following information, clarifications, or changes are needed. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments that require attention beyond the scope of this letter. Items that recur on this list appear in italics A complete review cannot be performed until the revised plans/documents, including a written response in itemized letter format indicating where the ‘clouded’ or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. Resubmittals must be made at the Development Services Department on the 2nd Floor of City Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm and from 8:30am-12pm on Wednesdays. This building plan review cannot be completed until we receive the following items: Structural Sheets: 6. This review has found significant structural information missing from the plans and we are unable to perform a complete review at this time. For example, the following concerns must be addressed. c. Cross Section 1/A7, Detail 2/S2 and Lower Floor Lateral Design in the Structural Calculations show detailed construction for a braced concrete foundation wall running North-South through the middle of the Crawl Space that is not shown on the Foundation Plan on Sheet S3. The response to the earlier plan review comment states: “The retaining wall in question has been added to the plans.” The wall in question appears as a tall curb on 1/A7 that runs north/south and divides the Crawl Space in the into two heights (6’-8” and 5’-3”) from top of grade to the bottom of the floor above. d. Sheet A7 shows the calculation requiring 6 foundation vents. Sheet S3 shows a single foundation vent and the total number of required crawl space vents left blank. The response to the earlier plan review comment states: “By others.” On Sheet S3 City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 Page 2 of 2 at the foundation vent note, indicate to see A7 for the total number of required vents, placed to provide cross ventilation, per IRC R408.1. j. Show all beam sizes (example Beam 3 at entry), walls and isolated column footings. The response to the earlier plan review comments states: “Added note to each framing plan.” Most beam sizes were added to the framing plans. Please indicate beam sizes for the following beams: - On Sheet S4 - beam 18. - On Sheet S5 - beams 6, 12, 17. - On Sheet S6 - beam 3. Additional plan review comments regarding resubmitted construction documents: 1. Please coordinate and resolve the differences between structural calculations, the floor plans, and the exterior elevations. Overall width of exterior elevations do not match that of the floor plan. Narrow shear walls, with minimum widths called out on the reduced drawings in the structural calculations are shown even narrower on the floor plans. Projecting stair on Left Elevation in structural calculations is shown flush on the floor plans. 2. Due to the 45 to 65 percent magnitude of slope, please provide a detailed design for the site retaining walls, stamped and sealed by the design professional. Please be aware that once the above corrections are made, subsequent city review may identify further corrections. Please let me know if I can be of any additional assistance. Eric Evensen