2018-1583 Dynasty Homes SFR (NASH).pdf
DATE: January 28, 2019
TO: Jeff Gray
Dynasty Homes
FROM: Eric Carter, Plans Examiner
RE: Plan Check: BLD2018- 1593
Project Address: 18109 Homeview Drive
Scope: NEW SFR, VB construction, Plumbing and Mechanical included.
Please be advised that the building plans for the above referenced project have been disapproved
for the purposes of obtaining a building permit. During a review of the plans by the Building
Division for compliance with the applicable building codes, it was found that the following
information, clarifications, or changes are needed. Reviews by other divisions, such as Planning,
Engineering, or Fire, may result in additional comments that require attention beyond the scope of
this letter.
A complete review cannot be performed until the revised plans/documents, including a
written response in itemized letter format indicating where the ‘clouded’ or otherwise
highlighted changes can be found on the revised plans, have been submitted to a Permit
Coordinator.
Resubmittals must be made at the Development Services Department on the 2nd Floor of City Hall.
Permit Center hours are M, T, Th, & F from 8am-4:30pm and from 8:30am-12pm on Wednesdays.
This building plan review cannot be completed until we receive the following item:
General:
1. Please provide the geotechnical report prepared by South Fork Geosciences, project
1307, dated January 29th 2014 as indicated in note 6 of the foundation notes on page A3.
A4:
2. It appears that the window adjacent to the entry door is within a “hazardous location”
and will need to be “safety glazed”. Please indicate on the plans.
3. The note for the cooktop indicates that it is to be vented to outside but does not appear to
indicate the minimum CFM. Please indicate the CFM on the plans.
City of Edmonds
PLAN REVIEW COMMENTS
BUILDING DIVISION
(425) 771-0220
Page 2 of 2
D1:
4. The lower floor foundation indicates that “retaining walls” will be part of the
construction. Details 5 and 6 on page describe the construction of the walls, but it does
not appear that calculations to confirm the design were provided as part of the submittal.
Please provide documentation on the retaining wall design in accordance with the
geotechnical report mentioned in item one of the correction letter.
Please let me know if I can be of any additional assistance.
Eric Carter