Loading...
2018-1622 GRE 192 Unit Podium Building #3.pdfPage 1 of 6 DATE: December 20, 2019 TO: Lucas Branham Studio Meng Strazzara LBranham@studioms.com FROM: Leif Bjorback, Building Official RE: Plan Check: BLD2018-1622 review #3, including review of proposed Alternate Design of Fire Wall Project Address: 23400 Highway 99 Scope: GRE 192 Unit Podium Building Please be advised that the building plans for the above referenced project have been disapproved for the purposes of obtaining a building permit. During a review of the plans by the Building Division for compliance with the applicable building codes, it was found that the following information, clarifications, or changes are needed. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments that require attention beyond the scope of this letter. A complete review cannot be performed until the revised plans/documents, including a written response in itemized letter format indicating where the ‘clouded’ or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. Resubmittals must be made at the Development Services Department on the 2nd Floor of City Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm and from 8:30am-12pm on Wednesdays. 12/20/2019: Mr. Branham, even though your “2 Hr. Fire Wall” letter of November 21, 2105 did not expressly state that your Fire Wall design was being proposed according to the Alternate Design allowances of IBC 104.11, it is my understanding, based on previous conversations, that this is your intention, and as such, is the basis for the City’s review of the proposal. In response to the proposal, please see the following plan review comments from City of Edmonds consultant WC3. In addition, please find WC3 comments regarding the Shoring review included at the end of this document. City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 Page 2 of 6 December 19, 2019 THIRD REVIEW WC3 Project #: 219-EDM-001 Edmonds Project#: BLD2018-1622 City of Edmonds Development Services Dept. 121 5th Ave. N Edmonds, WA 98020 Phone: (425)771-0220 Attention: Leif Bjorback Subject: Hwy 99 Edmonds Podium – 3rd Plan Review Comments Mr. Bjorback: West Coast Code Consultants, Inc. (WC3) has completed the third review of the proposed Hwy 99 Edmonds Podium project located in Edmonds, WA. This review was based upon the following: 1. Revised building drawings dated 11/14/19 by studio Meng Strazzara, sealed and signed by Charles Strazzara. 2. Opinion from SEAOSC on Firewall dated 3/21/18 3. CKC Letter-Wood Frame Firewall Detailing letter dated 11/21/19. 4. Hwy 99 - Alternate Design 2 Hr Fire Wall_SMS letter dated 11/21/19. 5. Hwy 99 - Alternate Design 2 Hr Fire Wall dated letter 11/18/19. The 2015 International Codes, as adopted by the State of Washington, were used as the basis of our review. Specific comments regarding this project are enclosed with this cover letter. If you have any questions regarding this review, please contact me. Sincerely, Marty Gillis , CBO Plans Examiner Attachment: Comments Page 3 of 6 Plan Review Comments Project Name: Hwy 99 Edmonds Podium Location(s): 23400 Highway 99, Edmonds, WA Code Review by: Marty Gillis, CBO Structural by: Mike Molyneux, PE OCCUPANCY & BUILDING SUMMARY: Type of Construc tion Use Occupan cy Classifica tion Square Footage Occupa nt Load Risk Categor y Building Height Sprinklers I-A Bike Parking Gym Lobby Mech/Utility Parking Office Trash Mech/Utility Parking Ass. R2 Ass. R2 Ass. R2 U S2 B U U S2 1715ft2 3185ft2 2550ft2 1848ft2 38461ft2 2166ft2 557ft2 2215ft2 41986ft2 18 II UL story, UL feet 903.3.1.1 * - Items noted with an asterisk may change as a result of the plan review comments. OCCUPANCY & BUILDING SUMMARY: Type of Construc tion Use Group(s) Occupan cy Classifica tion Square Footage Occupa nt Load Risk Categor y Building Height Sprinklers V-A Level 1 multi Lvl 1 Assembly Level 2 multi Level 3 multi Level 4 multi Level 5 multi R2 A3 R2 R2 R2 R2 XXft2 XXft2 30805ft2 30805ft2 30805ft2 30805ft2 II 5-story, 70?-feet 903.3.1.1 * - Items noted with an asterisk may change as a result of the plan review comments. GENERAL INFORMATION: The submitted documents for the above-mentioned project, as outlined in the cover letter, have been reviewed. The following comments address areas of concern, non-compliance with the governing code, potential errors, or omissions in the proposed design. The appropriate design professional must address each comment below and submit a written response in addition to revised plans and calculations if necessary. Please cloud any revisions made to the construction drawings and provide the date of the latest revision on each revised sheet. GENERAL COMMENTS: Please provide additional code rationale to justify building design. The plans appear to be preliminary and will require additional design and review. General: G1. - G50. Resolved. Page 4 of 6 NON-STRUCTURAL COMMENTS: NS1. – NS11. Resolved. ACCESSIBILITY COMMENTS: A1. - A7. Resolved. PLUMBING COMMENTS: P1. Resolved Building official agreement to limit occupant load. MECHANICAL COMMENTS: M1. No comment at this time. WSEC COMMENTS: E1. Resolved. E2. Resolved. STRUCTURAL COMMENTS: S1. Resolved. S2. Geotech report: a. Resolved. Note: Shoring design has been submitted. Review has occurred under separate cover. Please see separate review letter asking for easements or permission to work within the right of way. S3. – S18. Resolved. 3rd Review – New Comment A revision was received into correct area calculations by proposing to construct a 2-hour Fire Wall from the podium level through the 5th floor of the Type V-A structure. The Fire Wall design is being processed as an Alternate Methods and Materials approval in order to provide continuation of floor diaphragms though the fire-rated wall assembly. The review has been routed to WC-3 for review. Our findings and results of research have been communicated to the Building Official in order to form the basis for a decision and any forthcoming approvals for AM&M. The fire-rated listing information has been confirmed and found to comply with fire-rating requirements with the exception of the joints formed at the diaphragm to wall locations at each floor. Consideration by the Building Official for this requested alternate will include consideration of the joint at these locations. Alt. 1: A letter addressing the reason for the alternate was provided for review by the Engineer of Record. The reason stated that detrimental movement would occur along the Fire Wall line if the plywood sheathing was not run continuously at each floor line, however, calculations documenting the amount of movement and resulting separation was not submitted. Therefore, it would be helpful and would save time to provide calculations in order to provide compelling documentation for consideration and acceptance of your request for alternate methods and materials. Thank you. If you have any questions regarding the above comments, please contact Marty Gillis at martyg@wc- 3.com or by phone at (425) 582-1719. Page 5 of 6 December 19, 2019 SECOND REVIEW WC3 Project #: 219-EDM-001D1 City of Edmonds Project #: BLD2018-1622 City of Edmonds Development Services Dept. 121 5th Ave. N Edmonds, WA 98020 Phone: (425)771-0220 Attention: Leif Bjorback Subject: Hwy 99 Edmonds Podium – Shoring Deferral – 2nd Plan Review Comments Mr. Bjorback: West Coast Code Consultants, Inc. (WC3) has completed the second review of the proposed Hwy 99 Edmonds Podium Shoring Deferral project located in Edmonds, WA. This review was based upon the following: 6. Revised Temporary Shoring Wall Plans dated 11/11/2019 by Ground Support, PLLC, sealed and signed by R. John Byrne, Registered Professional Engineer. 7. Design Memorandum dated 06/05/2019 by Ground Support, PLLC, sealed and signed by R. John Byrne, Registered Professional Engineer. The 2015 International Codes, as adopted by the State of Washington, were used as the basis of our review. Specific comments regarding this project are enclosed with this cover letter. If you have any questions regarding this review, please contact me. Sincerely, Marty Gillis , CBO Plans Examiner Attachment: Comments Plan Review Comments Project Name: Hwy 99 Edmonds Podium - Shoring Location(s): 23400 Highway 99, Edmonds, WA Code Review by: Marty Gillis, CBO Structural by: Mike Molyneux, PE GENERAL INFORMATION: The submitted documents for the above-mentioned project, as outlined in the cover letter, have been reviewed. The following comments address areas of concern, non-compliance with the governing code, potential errors, or omissions in the proposed design. The appropriate design professional must address each comment below and submit a written response in addition to revised plans and calculations if necessary. Please cloud any revisions made to the construction drawings and provide the date of the latest revision on each revised sheet. GENERAL COMMENTS: G1. Please confirm the location of piles. Sheet SH4.0 detail SU3 appears to show the soldier pile extending beyond the property line. This is either not permitted or will require an easement related to the adjoining property owner. 2nd Review: Please provide documentation demonstrating that easements or other approvals have been granted. Please see additional comments from the PW division. G2. Resolved. G3. Please provide detailing if soldier piles will remain after the completion of the foundation, showing how damp proofing or water proofing will be applied. 2nd Review: Please obtain easements and drainage review approval for drainage located within the right of way. provide documentation demonstrating that easements or other approvals have been granted. Please see additional comments from the PW division. STRUCTURAL COMMENTS: S1. - S6. All structural review comments have been resolved. If you have any questions regarding the above comments, please contact Marty Gillis at martyg@wc-3.com or by phone at (425) 582-1719.