2018-1634 Bell Street Townhomes #3 - AD Shapiro Archs.docx (2).pdf Page 1 of 3 DATE: August 5, 2019 TO: Charles Von Goedert Email: charles_von@comcast.net FROM: Leif Bjorback, Building Official RE: Plan Check: BLD2018-1634 3rd Review Project Address: 7330 172nd St SW Scope: Construct 4-unit multi-family dwelling structure. Underdetermined construction type, Undetermined sprinkler system, mechanical,plumbing,firesprinkler,fire alarm, under separate permits. During review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please provide written responses as to where the changes can be found on the plans, and submit revised plans/documents to a permit coordinator in the Development Services Department. Subject: Bell Street Townhouses Permit: BLD18-1684 Per your request, Beck & Associates has completed a 3rd structural and non-structural review of the drawings and calculations for conformance with the 2015 International Building Code (IBC), as adopted and amended by the State of Washington (WSA) and the City of Edmonds (ECC). Our review of the plans and calculations indicates that corrections are necessary prior to permit issuance. The applicant should address the following comments in itemized letter format in addition to making corrections & revisions to the drawings. Corrections and revisions to the drawings should be clouded so that they are clearly identifiable. ________________________________________________________________________________ Legend: Faded text = initial comment adequately addressed – no further action required Plain text = initial comment (these remain where an additional comment is made) Blue text = 2nd review comment Red text = new comment City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 Page 2 of 3 New Comments (Based on Resubmitted Documents) a. The pdf format prevents us from making any redlines or review/approval stamps to the drawings. When resubmitting, the electronic copies will need to be in such a format as to allow redlines/markups to be made to the plans. b. Sheet S8 was not included in the resubmitted drawings. When resubmitting, all drawing sheets (a complete drawing set) are required to be submitted. General 9) This remains to be adequately addressed. Revise the assembly and plans accordingly. - The listing provided on sheet A301 is incomplete. It does not specify the required fasteners for connection of GWB to the ceiling - The listing does not meet the required STC rating without gypcrete topping where vinyl is provided (the kitchens, located directly above the garage, will apparently include the installation of vinyl). An alternate assembly will be required. - The complete listed, tested assembly requirements are required to be included in the drawings in their entirety. - Reference the attached WIJ-1.4 listing as included in AWC DCA3. The listing of the Typical Garage Floor ceiling assembly as found on sheet A301 is inconsistent with the referenced listings and with what is being specified on the Building Section. Additionally, referenced listings are outdated. Provide complete detailing and specifications for construction and inspection of a current listed, tested assembly (including fasteners). Please note that the listed, tested assembly must include the 3” of foam insulation as proposed. Alternatively, provide a different assembly and specifications that will match the proposed construction. Where fire-resistant-rated assemblies are required, provide complete specifications and detailing for construction. We recommend that an exact copy of the listed, tested assembly be included within the drawing set to insure proper construction and inspection. Drawing Sheets A103 – Roof Plans, Details 14) Details 23 & 24/A103 now provide detailing that demonstrates continuity of the party walls at the roof level for trussed framing. a) Provide detailing for the condition where the SIP panels run parallel to the party wall, demonstrating that the party wall extends to the underside of the upper roof sheathing. b) The architect indicates that Detail #49 was removed from the drawing set. However, we are unable to verify this as sheet S8 (which included detail #49) was not included in the resubmitted drawing set provided to us. Additionally, if the SIP panels do not run over the top of the rated walls, the structural engineer will need to provide a mechanism to support the SIP panels off of the side of the Page 3 of 3 rated walls while maintaining the continuity of the rated walls. The structural engineer will need to provide complete design and detailing for this condition to demonstrate that adequate support is provided. Coordinate with the structural engineer regarding this condition. Detail #49 of the structural drawings currently shows SIP panels running over the top of the party wall. However, the party wall is required to extend all the way through to the underside of the upper roof sheathing. Provide coordination and update Detail #49 accordingly. 708.4 Structural S2 – Framing Plans 21) This item remains to be addressed. The resubmitted plans do not include the PSL beam as indicated by the engineer. Update the plans accordingly. A PSL beam remains to be specified along grid 2.5, between grids C.1 & D. Reference the 3rd Floor Framing Plan. It appears that PSL beams are required at the elevator openings to support the joists. Specify required beams at the elevators between grids B & B.1 (2 locations) and between grids C.1 & D. 22) Reference the 4th Floor Framing Plan. e) The 5-1/4x11-7/8 PSL beams along grid D.8 support a shear wall from above. i) This item remains to be addressed. Holdowns are not specified at each end of each of the PSL beams as indicated by the engineer. This item remains to be addressed. It appears that holdowns should be provided at each end of the supported shear wall to the beams below. Provide an analysis and design (holdowns) that is consistent with that analysis. Please contact me should you have any questions. Respectfully, Douglas Beck, PE, SE Beck & Associates, PLLC