Loading...
2018-1653 Waterfront Center Site - Beck S-NS #2.pdfBeck & Associates, PLLC Structural Engineering & Code Consulting 16425 SE 66th Street, Bellevue, WA 98006 ● beckpllc@msn.com ● PH: 206-313-3739 July 11, 2019 Leif Bjorback Building Official City of Edmonds 121 5th Avenue North Edmonds, WA 98020-3145 Subject: Edmonds Waterfront Center (Structural & Non-structural Reviews) Permit: BLD18-1653 Per your request, Beck & Associates has completed second structural & non-structural reviews of the drawings and calculations for conformance with the 2015 International Building Code (IBC), as adopted and amended by the State of Washington (WSA) and the City of Edmonds (ECC). Our review of the plans and calculations indicates that corrections are necessary prior to permit issuance. The applicant should address the following comments in itemized letter format in addition to making corrections & revisions to the drawings. Corrections and revisions to the drawing should be clouded so that they are clearly identifiable. _______________________________________________________________________ Legend: Faded text = initial comment adequately addressed – no further action required Plain text = initial comment (these remain where an additional comment is made) Blue text = additional comment in response to the resubmittal NON-STRUCTURAL Accessibility (IBC Ch. 11; ICC A117.1-09) 1) At least one accessible route within the site is required to be provided from the public streets/sidewalk and from accessible parking. a) Reference the route of travel from the public sidewalk to the building entrance (L1.0 – Overall Layout Plan). Based on the proposed layout, the accessible route will consist of walking surfaces with a slope not steeper than 1:20, ramps, and/or curb ramps. 1104; ICC A117.1-09, Ch. 4 b) Identify the slopes of walking surfaces (slope <= 1:20) or ramps that will be included in the accessible route. Where ramps are provided, they are required to comply with ICC A117.1-09, 405. The plans need to be updated to demonstrate compliance. c) Since the accessible route crosses traffic lanes (in the parking lot), the route is required to be designated and marked as a crosswalk. 1106.6 d) Identify the location and provide complete detailing of curb ramps, as required to transition between elevations. Curb ramps are required to comply with ICC A117.1-09, 406. BLD18-1653 (S, NS) July 11, 2019 Page 2 of 4 16425 SE 66th Street, Bellevue, WA 98006 ● beckpllc@msn.com ● PH: 206-313-3739 e) This item remains to be addressed. Specify the required location of and provide specifications/detailing for the detectable warning (truncated domes) required where the accessible route from the public sidewalk to the building entrance crosses the vehicular path. Detailing requirements are found in ICC A117.1-09, 705. ICC A117.1-09, 406.12, 705 Marked crossings that are raised to the same level as the adjoining sidewalk/walkway are required to be preceded by a detectable warning 24 inches in depth complying with ICC A117.1-09, 705. Provide complete specifications & detailing for the detectable warning to demonstrate compliance with the requirements. ICC A117.1-09, 406.12 f) Update the plans to demonstrate that an accessible route will be provided from accessible parking spaces to the building entrance. 1104 2) The Cover Sheet (G1.0) indicates that (2) standard accessible parking spaces and (1) van accessible parking space will be provided. However, plans do not clearly identify the location of the van accessible parking space along with requirements. ICC A117.1-09, 502 a) This item remains to be addressed. The plans need to clearly identify the van accessible parking space as “Van Accessible” (only stall 33 meets requirements, as shown). Update the plans to identify which accessible parking space will meet the van accessible parking space requirements and provide dimensions & detailing to demonstrate compliance. b) Stall 33 (L3.3) now meets the parking space and access aisle dimensional requirements for van accessible parking spaces. Van accessible spaces are also required to be provided with signage meeting the requirements of ICC A117.1-09, 502.7. Update the plans to provide specifications and detailing to demonstrate compliance (the sign must include the international symbol of accessibility, designate the space as “van accessible”, and be located so that the bottom of the sign is located a minimum of 60 inches above the floor of the parking space). ICC A117.1-09, 502.7 Reference stall 43 on sheet L1.2 (Now sheet L3.2). It appears that this space meets dimensional requirements to be a van accessible parking space. However, van accessible parking spaces that are angled are required to have the access aisle located on the passenger side of the parking space (assuming head-in parking). The plans will need to be updated to demonstrate compliance. STRUCTURAL General Geotechnical 8) This item remains to be addressed. A letter summarizing the geotechnical review was not included in the submitted documents as indicated. Supplemental Geotechnical Recommendations were provided (dated March 12, 2019). However, a letter of review was not. Landau Associates is required to provide a review of the submitted plans in order to assess that the recommendations and design considerations presented in the geotechnical report have been properly interpreted and implemented into the project design. Landau Associates should provide a letter summarizing their review and providing any additional recommendations. All BLD18-1653 (S, NS) July 11, 2019 Page 3 of 4 16425 SE 66th Street, Bellevue, WA 98006 ● beckpllc@msn.com ● PH: 206-313-3739 recommendations need to be addressed in the resubmitted drawing set. Reference page 6-1 of the geotechnical report. Landau Associates, Geotechnical Engineering Study, p. 6-1 Drawing Sheets S1.1 – General Structural Notes 9) Reference the Geotechnical section of the General Structural Notes. Information on piles is provided. However, piles (other than sheet piling) are not a part of this project. 10) Reference the Concrete Mixes table. a) The maximum w/c ratio and compressive strength for Exposure Class F3 are 0.40 and 5,000 psi, respectively. Specified w/c ratio and compressive strength should be updated accordingly. ACI 318-14, Table 9.3.2.1 b) This item remains to be addressed. Required air entrainment was not specified as indicated. Specify the required air entrainment for Exposure Class F3, in accordance with ACI 318- 14, Table 19.3.3.1. ACI 318-14, Table 19.3.3.1 S5.1 – Structural Details 18) Reference 6/S5.1 (now 7/S5.1) a) Calculations were revised for design of the ‘cantilever’ retaining wall. i) Revised design now considers that the wall is restrained at the top. However, the details (7/S5.1, A&B/S4.2, A/S4.3) do not provide a mechanism for restraint. Please be aware that the slab simply sitting on top of the wall does not provide restraint. Restraint must be provided by a positive means (such as via a shear key or dowels between the slab and the wall). Update detailing to provide the required restraint. ii) Retaining wall design is based on 94 pcf equivalent fluid pressure. How was this determined? Recommendations indicate that the wall is required to be designed for the following equivalent fluid pressures. Revise the design and detailing accordingly. (1) 57 pcf (restrained, drained) (2) 0.43 x 250 pcf = 107.5 pcf (lateral earth pressure due to the recommended 250 psf surcharge; rigid walls) (3) 11H (seismic surcharge) It is apparent that the design of the retaining walls will need to be based on the Landau July 18, 2018 geotechnical report (this report is for the EWC and provides geotechnical design parameters for retaining wall design). The recommendations require non- restrained (yielding) walls to be designed for 37 pcf active (drained conditions) or 82 pcf active (undrained conditions). Additionally, the walls are required to be designed for surcharges (such as traffic surcharges) and seismic surcharges (11H), both of which appear to be applicable in this particular application. The current retaining wall design is based on 35 pcf active pressure, 250 pcf passive pressure, 0.45 coefficient of friction, 100 psf surcharge and 2,000 psf bearing. iii) The geotechnical engineer should confirm the design parameters used for design of the cantilever retaining walls. BLD18-1653 (S, NS) July 11, 2019 Page 4 of 4 16425 SE 66th Street, Bellevue, WA 98006 ● beckpllc@msn.com ● PH: 206-313-3739 iv) Revise the design in accordance with the recommendations of the geotechnical engineer. b) R2 is specified at the wall reinforcement. It appears that this should be R1. c) Both R2 and #5@12” EW, T&B are specified. However, these specifications are slightly different. Provide coordinate. Please contact me should you have any questions. Respectfully, Douglas Beck, PE, SE Beck & Associates, PLLC