2018-1653 Waterfront Center Site - Beck S-NS 1.pdfBeck & Associates, PLLC Structural Engineering & Code Consulting 16425 SE 66th Street, Bellevue, WA 98006 ● beckpllc@msn.com ● PH: 206-313-3739 February 22, 2019 Leif Bjorback Building Official City of Edmonds 121 5th Avenue North Edmonds, WA 98020-3145 Subject: Edmonds Waterfront Center (Structural & Non-structural Reviews) Permit: BLD18-1653 Per your request, Beck & Associates has completed structural & non-structural reviews of the drawings and calculations for conformance with the 2015 International Building Code (IBC), as adopted and amended by the State of Washington (WSA) and the City of Edmonds (ECC). Our review of the plans and calculations indicates that corrections are necessary prior to permit issuance. The applicant should address the following comments in itemized letter format in addition to making corrections & revisions to the drawings. Corrections and revisions to the drawing should be clouded so that they are clearly identifiable. NON-STRUCTURAL Accessibility (IBC Ch. 11; ICC A117.1-09) 1) At least one accessible route within the site is required to be provided from the public streets/sidewalk and from accessible parking. a) Reference the route of travel from the public sidewalk to the building entrance (L1.0 – Overall Layout Plan). Based on the proposed layout, the accessible route will consist of walking surfaces with a slope not steeper than 1:20, ramps, and/or curb ramps. 1104; ICC A117.1-09, Ch. 4 b) Identify the slopes of walking surfaces (slope <= 1:20) or ramps that will be included in the accessible route. Where ramps are provided, they are required to comply with ICC A117.1-09, 405. The plans need to be updated to demonstrate compliance. c) Since the accessible route crosses traffic lanes (in the parking lot), the route is required to be designated and marked as a crosswalk. 1106.6 d) Identify the location and provide complete detailing of curb ramps, as required to transition between elevations. Curb ramps are required to comply with ICC A117.1-09, 406. e) Marked crossings that are raised to the same level as the adjoining sidewalk/walkway are required to be preceded by a detectable warning 24 inches in depth complying with ICC A117.1-09, 705. Provide complete specifications & detailing for the detectable warning to demonstrate compliance with the requirements. ICC A117.1-09, 406.12 f) Update the plans to demonstrate that an accessible route will be provided from accessible parking spaces to the building entrance. 1104 BLD18-1653 (S, NS) February 22, 2019 Page 2 of 4 16425 SE 66th Street, Bellevue, WA 98006 ● beckpllc@msn.com ● PH: 206-313-3739 2) The Cover Sheet (G1.0) indicates that (2) standard accessible parking spaces and (1) van accessible parking space will be provided. However, plans do not clearly identify the location of the van accessible parking space along with requirements. ICC A117.1-09, 502 a) Update the plans to identify which accessible parking space will meet the van accessible parking space requirements and provide dimensions & detailing to demonstrate compliance. b) Reference stall 43 on sheet L1.2. It appears that this space meets dimensional requirements to be a van accessible parking space. However, van accessible parking spaces that are angled are required to have the access aisle located on the passenger side of the parking space (assuming head-in parking). The plans will need to be updated to demonstrate compliance. 3) Provide detailing for accessible parking space widths (96” minimum) and aisle widths adjacent to accessible parking spaces. Aisle widths for standard accessible parking spaces are required to be 60” minimum. Aisle widths for van accessible parking spaces are required to be 96” minimum. ICC A117.1-09, 502.2, 502.4; RCW 19.27.550 Handrails (1014) 4) Reference detail C/L3.3 – Standard Railing. The handrail is required to continue to slope for the depth of one tread beyond the bottom riser. While the detail shows a 12” extension, the extension does not continue to slope. Update the illustration and detailing to specify this. 1014.6 5) Reference A/L3.2 – Railing and Boulders at Stairs. The handrail is required to continue to slope for the depth of one tread beyond the bottom riser. Update the illustration and detailing to specify this. 1014.6 Electric Vehicle Charging Infrastructure (427) 6) The electrical room that serves the parking area is required to be designed to accommodate the electrical equipment and distribution required to serve a minimum of 20 percent of the total parking spaces with 208/240 V 40-amp electrical vehicle charging infrastructure. Please note that this requirement is to insure that the electrical room will be able to accommodate future electrical equipment and distribution. The equipment and distribution are not currently required to be installed. Please coordinate with the building architect to verify that the electrical room is large enough. 7) Five percent of the parking is required to be provided with electric vehicle charging infrastructure (5% x 74 = 3.7 ~ 4 EV parking spaces). Currently, only (3) parking spaces are provided with EV charging infrastructure. Additionally, the code requires one accessible parking space to be served by EV charging infrastructure. Update the plans to provide an accessible parking space with EV charging infrastructure. 427.2, 427.5 (Washington State Amendments) STRUCTURAL BLD18-1653 (S, NS) February 22, 2019 Page 3 of 4 16425 SE 66th Street, Bellevue, WA 98006 ● beckpllc@msn.com ● PH: 206-313-3739 General Geotechnical 8) Landau Associates is required to provide a review of the submitted plans in order to assess that the recommendations and design considerations presented in the geotechnical report have been properly interpreted and implemented into the project design. Landau Associates should provide a letter summarizing their review and providing any additional recommendations. All recommendations need to be addressed in the resubmitted drawing set. Reference page 6-1 of the geotechnical report. Landau Associates, Geotechnical Engineering Study, p. 6-1 Drawing Sheets S1.1 – General Structural Notes 9) Reference the Geotechnical section of the General Structural Notes. Information on piles is provided. However, piles (other than sheet piling) are not a part of this project. 10) Reference the Concrete Mixes table. a) The maximum w/c ratio and compressive strength for Exposure Class F3 are 0.40 and 5,000 psi, respectively. Specified w/c ratio and compressive strength should be updated accordingly. ACI 318-14, Table 9.3.2.1 b) Specify the required air entrainment for Exposure Class F3, in accordance with ACI 318- 14, Table 19.3.3.1. ACI 318-14, Table 19.3.3.1 S2.4 – Partial Site Plan 11) Keynote #5 indicates that an existing soldier pile will be spliced and extended to match the top of the new sheet pile. The connection of the extension to the existing soldier pile should be specified/detailed within the drawings. S3.2 - Sections 12) Reference B/S3.2 a) Numerous reinforcing bars illustrated in the detail remain unspecified. Identify all required reinforcement. b) Identify the required spacing of slots/holes for installation of the precast concrete architectural cap. 13) Reference C/S3.2 – Section – Pile Cap. Identify the dimension of the top of the sheet pile to the top of the pile cap. S4.2 – Sheet Pile Wall Sections 14) Detail 5/S5.1 is incorrectly referenced for the retaining wall and footing. It appears that detail 6/S5.1 should be referenced. S4.3 – Sheet Pile Wall Sections BLD18-1653 (S, NS) February 22, 2019 Page 4 of 4 16425 SE 66th Street, Bellevue, WA 98006 ● beckpllc@msn.com ● PH: 206-313-3739 15) Detail 5/S5.1 is incorrectly referenced for the retaining wall and footing. It appears that detail 6/S5.1 should be referenced. 16) Reference D/S4.3 is incorrectly referenced for stair construction. It appears that detail A/S4.4 should be referenced. S4.4 – Stair Sections 17) Reference A/S4.4. a) Specify the length and embedment of the #5 @ 6” o.c. at the top of the stairs. b) Specify the minimum thickness/depth of the stairs. c) Specify required footing dimensions. S5.1 – Structural Details 18) Reference 6/S5.1 a) It is apparent that the design of the retaining walls will need to be based on the Landau July 18, 2018 geotechnical report (this report is for the EWC and provides geotechnical design parameters for retaining wall design). The recommendations require non- restrained (yielding) walls to be desgiend for 37 pcf active (drained conditions) or 82 pcf active (undrained conditions). Additionally, the walls are required to be designed for surcharges (such as traffic surcharges) and seismic surcharges (11H), both of which appear to be applicable in this particular application. The current retaining wall design is based on 35 pcf active pressure, 250 pcf passive pressure, 0.45 coefficient of friction, 100 psf surcharge and 2,000 psf bearing. i) The geotechnical engineer should confirm the design parameters used for design of the cantilever retaining walls. ii) Revise the design in accordance with the recommendations of the geotechnical engineer. b) R2 is specified at the wall reinforcement. It appears that this should be R1. c) Both R2 and #5@12” EW, T&B are specified. However, these specifications are slightly different. Provide coordinate. Please contact me should you have any questions. Respectfully, Douglas Beck, PE, SE Beck & Associates, PLLC