2019-0023 Lester Back Deck.pdf DATE: January 28, 2019 TO: Joel Lester FROM: Eric Evensen, Plans Examiner RE: Plan Check: BLD2019-0023 Project Address: 633 2nd Ave N Scope: New Back Deck - VB construction Please be advised that the building plans for the above referenced project have been disapproved for the purposes of obtaining a building permit. During a review of the plans by the Building Division for compliance with the applicable building codes, it was found that the following information, clarifications, or changes are needed. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments that require attention beyond the scope of this letter. A complete review cannot be performed until the revised plans/documents, including a written response in itemized letter format indicating where the ‘clouded’ or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. Resubmittals must be made at the Development Services Department on the 2nd Floor of City Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm and from 8:30am-12pm on Wednesdays. This building plan review cannot be completed until we receive the following items: General: 1. At intake, it was understood that you were submitting drawings that would cover work throughout the house for this and several future permit applications. Please highlight or otherwise indicate scope of work covered by this permit submittal on: - A1.1 Foundation Plan - A2.1 Lower Floor Plan - A2.2 Main Floor Plan - A3.2 Elevations - A4.1 Building Sections 2. Professional stamp. - Architect to sign plans. - Engineer to sign plans. On sheet A2.1 of the plans: City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 Page 2 of 2 3. Identify stairs shown in black lines on plan-west from Storage that are not on any other sheet. On sheet A2.2 of the plans: 4. Clarify on the drawings the material used for decking. 5. Indicate the artificial light source located at the top landing of the deck stair per IRC 303.8. Note that primary power shall come from the building wiring. On sheet A6.1 of the plans: 6. Indicate pressure-treated lumber at all deck framing. On sheet S2.4 of the plans: 7. On detail 5, please identify framing members in exterior wall framing at deck connection. - Is this detail meant to describe the typical deck to band joist connection as well as the deck attachment for lateral loads? If so, please call out to stagger the placement of lag screws and bolts in ledgers in accordance with IRC 507.2 and Figure R507.2.1(1). - Show on the detail that the DT1Z’s shall be evenly spaced with one within 24 inches of each end of the band joist. - As per Simpson, DTT1Z applied to a hem-fire #2 deck joist requires (6) SD #9 x 1-1/2” screws or (8) 10d x 1-1/2” nails into the deck joist and (1) fully thread 3/8” diameter lag screw predrilled with minimum 3” penetration to center of top plate, studs, or header to achieve the required 750# allowable tension load. Show and call out the fasteners on the detail. Structural calculations: 8. Please provide stamped and signed structural calculation for deck beam with spans greater than 8 feet. Please be aware that once the above corrections are made, subsequent city review may identify further corrections. Please let me know if I can be of any additional assistance. Eric Evensen