2019-0078 Pope Addition.pdf DATE: March 6, 2019 TO: Mitchell Gaynor Pinnaclebuilders@gmail.com FROM: Eric Carter, Plans Examiner RE: Plan Check: BLD2019-0078 Project Address: 18209 76th AVE W. Scope: Addition, SFR, VB construction, Plumbing and Mechanical included. Please be advised that the building plans for the above referenced project have been disapproved for the purposes of obtaining a building permit. During a review of the plans by the Building Division for compliance with the applicable building codes, it was found that the following information, clarifications, or changes are needed. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments that require attention beyond the scope of this letter. A complete review cannot be performed until the revised plans/documents, including a written response in itemized letter format indicating where the ‘clouded’ or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. Resubmittals must be made at the Development Services Department on the 2nd Floor of City Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm and from 8:30am-12pm on Wednesdays. This building plan review cannot be completed until we receive the following item: General: 1. The construction project involves demolition of a significant portion of the existing structure. Please be aware that structures that are demolished to the level that meets or exceeds 75% of the replacement cost of the structure will not be allowed by city code to be rebuilt except to full-on standards for new construction. Reference Edmonds Community Development Code section 17.40.020(F). In order to verify that your project does not meet this threshold, the following must be provided to the city: a. A cost breakdown showing the demolition is less than 75% of the replacement cost of the building. b. Distinguish clearly on the plans which portions of the building are to be retained as existing and which are new, in order to establish a design that clearly demonstrates the level of demolition as laid out in the cost breakdown. Please contact me if you need further clarification on this issue. City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 Page 2 of 3 c. Please the attached worksheet, if this is the method you choose, please complete, and return with your submittal. 2. Due to the amount of retrofit hold downs, a 3rd party inspector will be required to verify the installation. Please fill out the form that has been included and return prior to permit issuance. 3. This plan is required to comply with the 2015 Washington State Energy Code as indicted on page A-001. The plans do not appear to include all of the required information as mentioned in section R103.2 of the Washington State Energy Code. Please provide the required information. 4. This addition will require the installation of “whole house” ventilation in accordance with IRC M1507.3. Please provide a “whole house” ventilation system to the plans. 5. The Kitchen and Bathrooms will require local exhaust in accordance with IRC M1507.4. Please indicate the location and CFM of the local exhaust on the plans. 6. It appears that new stairs will be built as part of this project. Stair and handrail details in accordance with IRCR311.7 will need to be included on the plans. Please add the details to the plans. 7. The provided structural calculations do not appear to be valid. In accordance with the notes accompanying the stamp, the “Wet Stamp” must be signed and dated. Please provide two sets of signed and dated calculations. A-101B 8. Window callouts have been identified on the plans and reference to page A600. Neither the floor plan nor details provided on A600 mention the U value, Safety glazing in accordance with IRC R308 of the proposed windows. Please add the U value and Safety glazing to the plans. 9. Smoke and Carbon Monoxide detectors are required to be installed in accordance with IRC R314 and R315. Please indicate to required alarms on the plans. 10. The note pertaining to the type of gypsum board to be installed in the garage is not completely accurate. 5/8” Type X gyp will be required to be installed on the garage ceiling. Please update the note. Page 3 of 3 A-102B 11. Window callouts have been identified on the plans and reference to page A600. Neither the floor plan nor details provided on A600 mention the U value, Safety glazing in accordance with IRC R308 of the proposed windows. Please add the U value and Safety glazing to the plans. 12. Smoke and Carbon Monoxide detectors are required to be installed in accordance with IRC R314 and R315. Please indicate to required alarms on the plans. S-103 13. The plans indicate a new girder truss to support the existing trusses as directed by key note 1. It is unclear how the plan right side of the new girder will attach or be supported as it butts into the adjacent girder. Is the end of the girder to be attached and or supported by a hanger? If so please indicate the specific hanger or minimum design requirements on the plans. S-500 14. Detail K indicates a minimum of 3 DTT2Z connectors per deck, I assume that these connectors are being utilized to meet the requirements of R507.2.4. The Washington State amended version of section R507.2.4 requires a minimum of (4) devices with a capacity of 750# or (2) 1500# capacity devices. Please update the note to reflect to Washington State amended version of R507.2.4. 15. Detail K indicates (3) Simpson SDS ¼”x3 ½” @ 16” OC for the ledger attachment. These anchors must be staggered in accordance with IRC R507.2.1 (1). Please update the note. Please let me know if I can be of any additional assistance. Eric Carter