Loading...
2019-0360 ZHAO Comments 2.pdf DATE: August 5, 2019 TO: ROCK-SOLID GENERAL CONSTR LLC C/O PATRICK AUBLE FROM: Donovan Akau, Plans Examiner RE: Plan Check: BLD2019-0360 Project Address: 228 Sunset Ave N. Scope: SFR/ADU, R-3, VB Construction. Plumbing and Mechanical included. Please be advised that the building plans for the above referenced project have been disapproved for the purposes of obtaining a building permit. During a review of the plans by the Building Division for compliance with the applicable building codes, it was found that the following information, clarifications, or changes are needed. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments that require attention beyond the scope of this letter. Items that recur on this list appear in italics. A complete review cannot be performed until the revised plans/documents, including a written response in itemized letter format indicating where the ‘clouded’ or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. Resubmittals must be made at the Development Services Department on the 2nd Floor of City Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm and from 8:30am-12pm on Wednesdays. Due to the information that was found and comments from other departments, the designs of this project may change, a complete building plan review cannot be completed at this time. Further comments may be generated upon resubmitted materials. During this cursory review the following items were found. Sheet 1: 1. This project appears to have been designed with wind category “B”. Due to the proximity to the coastline this project will be required to be designed at a minimum of exposure “C”. Please provide designs that comply with wind exposure category “C”. It appears that these corrections were made on the structural plans, not on sheet one of the design as indicated on your response letter. City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 Page 2 of 3 2. This project appears to have been designed as seismic category D. Residential projects in the City of Edmonds must be designed to the minimum standards of seismic category D1. Please provide designs that comply with design category D1. It appears that these corrections were made on the structural plans, not on sheet one of the design as indicated on your response letter. 3. The notes indicate that this project is to build as construction type V. Type V is not a complete construction type. Is this project to build as VA or VB construction? Please clarify and change on the plans. Type VA has been indicated on the response letter provided but not corrected on sheet 1 of the design plans and in details. The 2015 IRC does not require this project to be of VA 1 hour construction. Please clarify/correct that type VA construction is to be used for this project. 4. The proposed plans appear to indicate a 90 CFM whole fan will be utilized as the means to achieve whole house ventilation. Will you be providing a 90 CFM for each dwelling or is the fan located in the primary dwelling? Please clarify. It appears that this correction has not been made as the response letter states “please see clouded area on sheet 2/6”. Please make corrections and indicate that a 90 CFM whole house ventilation to be for each dwelling. Sheet 3: 5. Detail G appears to indicate an R21 is to be used. R21 does not comply with the minimum requirements of the Washington State Energy code and the elected energy credit of 1A. Please update the detail from R21 to a minimum of R38. It appears that this correction has not been made. Detail G appears on sheet 3, the response letter states to “please see clouded area on sheet 4/6”. Please make corrections that a minimum of R38 to be used to comply with the minimum requirements of the Washington State Energy code. Sheet 4: 6. The underfloor insulation value indicated in cross section A does not meet the minimum requirements of elected credit 1A. Please update the plans to reflect the elected credit of 1A. This correction has not been made as indicated by your response letter. Please make the correction as requested. General: 7. Structural plans are not stamped by the Engineer of record provided in the design plans indicated by pages S2/1 thru S2/4. Are these plans are to be used as part of the design? Please have Engineer of record stamp these structural plans and provide call outs on these plans if they are to be used or remove them from the set of plans. This review is incomplete, upon review of resubmitted documents, additional comments may be generated. . Page 3 of 3 Sincerely, Donovan Akau