Loading...
2019-0360 ZHAO.pdf DATE: June 3, 2019 TO: ROCK-SOLID GENERAL CONSTR LLC C/O PATRICK AUBLE FROM: Eric Carter, Building Inspector RE: Plan Check: BLD2019-0360 Project Address: 228 Sunset Ave N. Scope: SFR/ADU, R-3, VB Construction. Plumbing and Mechanical included. Please be advised that the building plans for the above referenced project have been disapproved for the purposes of obtaining a building permit. During a review of the plans by the Building Division for compliance with the applicable building codes, it was found that the following information, clarifications, or changes are needed. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments that require attention beyond the scope of this letter. Items that recur on this list appear in italics. A complete review cannot be performed until the revised plans/documents, including a written response in itemized letter format indicating where the ‘clouded’ or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. Resubmittals must be made at the Development Services Department on the 2nd Floor of City Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm and from 8:30am-12pm on Wednesdays. Due to the information that was found and comments from other departments, the designs of this project may change, a complete building plan review cannot be completed at this time. Further comments may be generated upon resubmitted materials. During this cursory review the following items were found. Sheet 1: 1. This project appears to have been designed with wind category “B”. Due to the proximity to the coastline this project will be required to be designed at a minimum of exposure “C”. Please provide designs that comply with wind exposure category “C”. 2. This project appears to have been designed as seismic category D. Residential projects in the City of Edmonds must be designed to the minimum standards of seismic category D1. Please provide designs that comply with design category D1. City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 Page 2 of 3 3. The notes indicate that this project is to build as construction type V. Type V is not a complete construction type. Is this project to build as VA or VB construction? Please clarify and change on the plans. 4. The proposed plans appear to indicate a 90 CFM whole fan will be utilized as the means to achieve whole house ventilation. Will you be providing a 90 CFM for each dwelling or is the fan located in the primary dwelling? Please clarify. Sheet 3: 5. Detail G appears to indicate an R21 is to be used. R21 does not comply with the minimum requirements of the Washington State Energy code and the elected energy credit of 1A. Please update the detail from R21 to a minimum of R38. Sheet 4: 6. The underfloor insulation value indicated in cross section A does not meet the minimum requirements of elected credit 1A. Please update the plans to reflect to elected credit. This review is incomplete, upon review of resubmitted documents, additional comments may be generated. . Sincerely, Eric Carter Page 3 of 3