Loading...
2019-0423 Huntamer Addition (Dehennis).pdf DATE: May 10, 2019 TO: Phillip “Skip” DeHennis FROM: Eric Carter, Plans Examiner RE: Plan Check: BLD2019-0423 Project Address: 24114 107th PL. W. Scope: ALTERATION, ADDITION SFR, VB Construction, Plumbing and Mechanical included. Please be advised that the building plans for the above referenced project have been disapproved for the purposes of obtaining a building permit. During a review of the plans by the Building Division for compliance with the applicable building codes, it was found that the following information, clarifications, or changes are needed. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments that require attention beyond the scope of this letter. Items that recur on this list appear in italics. A complete review cannot be performed until the revised plans/documents, including a written response in itemized letter format indicating where the ‘clouded’ or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. Resubmittals must be made at the Development Services Department on the 2nd Floor of City Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm and from 8:30am-12pm on Wednesdays. GENERAL PLAN REVIEW NOTE: The engineered designs/structural calculations prepared by CG Engineering – Project No. 19053.10 – referenced at various locations must be incorporated into the building plans and be accompanied by the stamp of the designer, indicating the appropriate use of the design, as required per Revised Code of Washington (RCW) 18.43.070 and Washington Administrative Code (WAC) 196-23-020. S2.1: 1. The proposed plans appear to indicate 2x10 PT joists will be used to raise the floor level in the garage area. The plans do not appear to indicate how the underfloor space will be protected from vapor transmission, ventilation, and R value of insulation to be used. Please clarify and indicate on the plans. Please let me know if I can be of any further assistance. Sincerely, Eric Carter City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 Page 2 of 2