2019-0448 Abedalla.pdf
DATE: May 17, 2019
TO: Niran Abedella
FROM: Eric Carter, Plans Examiner
RE: Plan Check: BLD2019-0448
Project Address: 7815 202nd pl sw.
Scope: ALTERATION, SFR, VB Construction. Plumbing and
Mechanical included
Please be advised that the building plans for the above referenced project have been
disapproved for the purposes of obtaining a building permit. During a review of the plans
by the Building Division for compliance with the applicable building codes, it was found
that the following information, clarifications, or changes are needed. Reviews by other
divisions, such as Planning, Engineering, or Fire, may result in additional comments that
require attention beyond the scope of this letter. Items that recur on this list appear in
italics.
A complete review cannot be performed until the revised plans/documents, including a
written response in itemized letter format indicating where the ‘clouded’ or otherwise
highlighted changes can be found on the revised plans, have been submitted to a Permit
Coordinator.
Resubmittals must be made at the Development Services Department on the 2nd Floor of
City Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm and from 8:30am-12pm
on Wednesdays.
General:
The scope of work indicated on the permit application includes, foundation
reinforcement, but the plans do not provide any details of how this work is to be
completed. Please provide two sets of plans prepared by a Washington State liscenced
Engineer. The Engineer of Record must verify the proposed changes and provide a report
indicating the proposed changes have been reviewed and approved. Please provide a
report and plans from a licensed Washington State Engineer verifying the proposed
structural changes.
Upon review of the resubmitted documents, additional comments may be generated.
Sincerely,
Eric Carter
City of Edmonds
PLAN REVIEW COMMENTS
BUILDING DIVISION
(425) 771-0220
Page 2 of 2