Loading...
2019-0462 Dawson Deck.pdf DATE: May 2nd 2019 TO: Jon Dawson FROM: Eric Carter, Plans Examiner RE: Plan Check: BLD2019-0462 Project Address: 1034 A Ave. S. Scope: New deck, SFR, VB Construction. Please be advised that the building plans for the above referenced project have been disapproveddisapproveddisapproveddisapproved for the purposes of obtaining a building permit. During a review of the plans by the Building Division for compliance with the applicable building codes, it was found that the following information, clarifications, or changes are needed.... Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments that require attention beyond the scope of this letter. Items that recur on this list appear in italicsItems that recur on this list appear in italicsItems that recur on this list appear in italicsItems that recur on this list appear in italics. A complete review cannot be performed until A complete review cannot be performed until A complete review cannot be performed until A complete review cannot be performed until the revised plans/documents, the revised plans/documents, the revised plans/documents, the revised plans/documents, including a written response including a written response including a written response including a written response in itemized letter format in itemized letter format in itemized letter format in itemized letter format indicating where the indicating where the indicating where the indicating where the ‘clouded’ ‘clouded’ ‘clouded’ ‘clouded’ or otherwior otherwior otherwior otherwise highlighted se highlighted se highlighted se highlighted changes can be found on the changes can be found on the changes can be found on the changes can be found on the revised revised revised revised plansplansplansplans, , , , have been submitted to a Permit Coordinator. have been submitted to a Permit Coordinator. have been submitted to a Permit Coordinator. have been submitted to a Permit Coordinator. Resubmittals must be made at the Development Services Department on the 2nd Floor of City Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm and from 8:30am-12pm on Wednesdays. Page 2: 1. The proposed 2x8 HF #2 joist exceed the limits of stress and bending. Please take into consideration the “wet service”, “incising”, plus the required minimum loading of 10PSF of “dead load” and 60 PSF of “live load when sizing your framing members. 2. The proposed outer 4x10 HF #2 beams spanning approximately 13’, exceed the limits of stress and bending. Please take into consideration the “wet service”, “incising”, plus the required minimum loading of 10PSF of “dead load” and 60 PSF of “live load when sizing your framing members. City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 Page 2 of 3 3. The proposed center 4x10 HF #2 beam spanning approximately 13’, exceed the limits of stress and bending. Please take into consideration the “wet service”, “incising”, plus the required minimum loading of 10PSF of “dead load” and 60 PSF of “live load when sizing your framing members. 4. The proposed center beam and one of the outer beams appear to be attached to the existing home. The connection and how the beam will be supported do not appear to have been indicated. Please provide details on how the point load of the beam will be supported on the plans. 5. The plans do not appear to have the required lateral tension ties indicated on the plans. Section R507.2.4 of the 2015 International Residential Code requires a minimum of 2- 1500# capacity ties or 4 evenly space ties with a minimum of 750#’s each. Please provide the type and location the tie on the plans. Page 3: 6. The proposed pier post design indicates an 18”x18”x12” footing. These footings must be a minimum of 18” below grade to comply with frost requirements and have a minimum of 2- #4 rebar in each direction. Please revise the footing details to include these details. If you need any additional information or guidance in designing your deck. My Building Permit.Com has created tip sheets that are very helpful. Please let me know if I can be of any further assistance. Sincerely, Eric Carter Page 3 of 3