Loading...
2019-0651 Echalbarger.pdf DATE: July 18, 2019 TO: Todd Echelbarger Todd@Echelbarger.com FROM: Eric Carter, Plans Examiner RE: Plan Check: BLD2019-0651 Project Address: 714 13th WAY SW. Scope: NEW SFR, VB Construction Plumbing and Mechanical included. Please be advised that the building plans for the above referenced project have been disapproveddisapproveddisapproveddisapproved for the purposes of obtaining a building permit. During a review of the plans by the Building Division for compliance with the applicable building codes, it was found that the following information, clarifications, or changes are needed.... Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments that require attention beyond the scope of this letter. Items that recur on this list appear in italicsItems that recur on this list appear in italicsItems that recur on this list appear in italicsItems that recur on this list appear in italics. A complete review cannot be performed until A complete review cannot be performed until A complete review cannot be performed until A complete review cannot be performed until the revised plans/documents, the revised plans/documents, the revised plans/documents, the revised plans/documents, including a written response including a written response including a written response including a written response in itemized letterin itemized letterin itemized letterin itemized letter format format format format indicating where the indicating where the indicating where the indicating where the ‘clouded’ ‘clouded’ ‘clouded’ ‘clouded’ or otherwise highlighted or otherwise highlighted or otherwise highlighted or otherwise highlighted changes can be found on the changes can be found on the changes can be found on the changes can be found on the revised revised revised revised plansplansplansplans, , , , have been submitted to a Permit Coordinator. have been submitted to a Permit Coordinator. have been submitted to a Permit Coordinator. have been submitted to a Permit Coordinator. Resubmittals must be made at the Development Services Department on the 2nd Floor of City Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm and from 8:30am-12pm on Wednesdays. Page A4-A5: 1. Number details have been indicated on page A3 and A4 but do not appear to have a directive of to which page to reference. Please add the appropriate pages to the detail bugs on the plans. Please let me know if I can be of any further assistance. Sincerely, Eric Carter City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 Page 2 of 2