Loading...
2019-0825 Wanchoo ADU.pdf DATE: July 22, 2019 TO: Bjorn Wanchoo FROM: Eric Carter, Plans Examiner RE: Plan Check: BLD2019-0825 Project Address: 19004 88th AVE. West Scope: ADU, SFR, VB Construction. Please be advised that the building plans for the above referenced project have been disapproveddisapproveddisapproveddisapproved for the purposes of obtaining a building permit. During a review of the plans by the Building Division for compliance with the applicable building codes, it was found that the following information, clarifications, or changes are needed.... Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments that require attention beyond the scope of this letter. Items that recur on this list appear in italicsItems that recur on this list appear in italicsItems that recur on this list appear in italicsItems that recur on this list appear in italics. A complete review cannot be performed until A complete review cannot be performed until A complete review cannot be performed until A complete review cannot be performed until the revised plans/documents, including a written the revised plans/documents, including a written the revised plans/documents, including a written the revised plans/documents, including a written response response response response in itemized letter format in itemized letter format in itemized letter format in itemized letter format indicating where the ‘clouded’ indicating where the ‘clouded’ indicating where the ‘clouded’ indicating where the ‘clouded’ or otherwise highlighted or otherwise highlighted or otherwise highlighted or otherwise highlighted changes changes changes changes can be found on the can be found on the can be found on the can be found on the revised revised revised revised plansplansplansplans, have been submitted to a Permit Coordinator. , have been submitted to a Permit Coordinator. , have been submitted to a Permit Coordinator. , have been submitted to a Permit Coordinator. Resubmittals must be made at the Development Services Department on the 2nd Floor of City Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm and from 8:30am-12pm on Wednesdays. General: 1. The primary residence and the proposed ADU must act as independent dwellings. Please indicate on the plans where the electrical panel, water shut off will be located for each dwelling. These locations must be readily accessible to the dwelling they service in which they reside without special knowledge or access. Please indicate on the plans where the water shut off(s) and electrical panel(s) will be located for the primary residence and ADU. 2. The plans indicate Smoke and Carbon Monoxide detectors but do not clarify if they are to be interconnected between the primary and accessory dwelling. Please clarify and indicate on the plans. Upon review of the resubmitted documents, additional comments may be generated. Sincerely, Eric Carter City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 Page 2 of 2