2019-1013 Lot 1 Echelbarger.pdf DATE: September 27, 2019 TO: Echelbarger Homes and Land, LLC Todd@Echelbarger.com FROM: Donovan Akau, Plans Examiner RE: Plan Check: BLD2019-1013 Project Address: 720 13th Way SW Scope: New SFR, R-3, VB Construction. Please be advised that the building plans for the above referenced project have been disapproved for the purposes of obtaining a building permit. During a review of the plans by the Building Division for compliance with the applicable building codes, it was found that the following information, clarifications, or changes are needed. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments that require attention beyond the scope of this letter. Items that recur on this list appear in italics. A complete review cannot be performed until the revised plans/documents, including a written response in itemized letter format indicating where the ‘clouded’ or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. Resubmittals must be made at the Development Services Department on the 2nd Floor of City Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm and from 8:30am-12pm on Wednesdays. Sheet P1: 1. It appears that the Energy Calculations do not reflect the Energy credits that you have chosen for this project. Please make corrections and ensure that the credits chosen is clearly stated/applied to the plans as notated in Table 406.2 of the 2015 WSEC . Sheet A2: 2. Located on the South wall of the new SFR there are three exterior doors. Provide the landings and their dimensions to meet section R311.3 in the 2015 IRC. 3. The location of the gas furnace is located in an area subject to vehicle damage. Protection is required by section M1307.3.1. Please provide this protection and indicate on the plans. 4. The gas furnace is indicated to have an energy credit of 3a from table 406.2 of the 2015WSEC. Please provide the minimum AFUE on the plans as required for the energy credit chosen for this project. Sheet A5: 5. There is symbol that I am not able to determi ne what it is indicating. I have noted this on the plans in red. Please clarify and provide detail for this symbol. It appears that this is a typical hanger as noted in the Face Mount Hangers note located on the left hand side of the sheet. 6. In the notes “Face Mount Hangers” it indicates specific hangers for the structural members being used for this project. I am unable to locate these hangers on the Simpson Strong Tie web site. I do understand that there are other companies out there that provide products so please provide/clarify the manufacture/details for the hangers being used. City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 Page 2 of 2 7. When scaled out it appears that the beam supports/connections are indicated as being just short of its connections. Please clarify/correct this on the plans. I do recognize that some of these members are too connected by hangers. Upon review of the resubmitted documents, additional comments may be generated . Sincerely, Donovan Akau