Loading...
20191014 Preliminary Drainage Report Resub.pdfPreliminary Dra inage Report Sundstone SP for Sundstone HOA Attn: LindellGraham I4L4gth Ave N, Apt.301 Edmonds, WA 98020 206.7t7.2995 SITE LOCATION: !4t4gth Ave N, Apt. 301 Edmonds, WA 98020 Tax Pa rcels: 00427 80OL00100, ... 100200, ... 100300, ... 100400, ... 100500, ...200200,... 200300, ...200400,... 20O5OO, 3OO1OO, ...300200, ...300300, ...300500 î Prepared by: Joseph M. Smeby, P.E. Job No: L9-0LL7 June, 2019 Revised: Oct.2019 RECElVED ocI 1 4 20tg o.*rotgü[IEåERvrcEs 200L00, 300400, TABLE OF CONTENTS TABLE OF CONTENTS 7 ..2LIST OF FIGURES L, INTRODUCTION & SITE CLASSIFICATION ...............3 2. STORMWATER SITE PLAN 4 A. SrTE GRADTNG/EROS|ON CONTROL RrSK ASSESSMENT......... ............... 5 B. SWPPP MINIMUM ELEMENTS.. 4. WATER POLLUTION SOURCE CONTROL 5. PRESERVATION OF NATURAL DRAINAGE SYSTEM...... 6. ON-SITE STORMWATER MANAGEMENT.......... 7. RUN-OFF TREATMENT ........ 8. FLOW CONTROL... 9. WETLANDS PROTECTION 5 7 7 7 9 9 9 ].0. OPERATIONS AND MAINTENANCE MANUAL 10 APPENDIX A - To be provided with final engineering report at time of construction plan submittal. Sundstone SP October,2019 19-0117 Page 1 ITEM FIGURE 1 FIGURE 2 FIGURE 3 FIGURE 4 FIGURE 5 LIST OF FIGURES vtctNlTY MAP......... EXISTING DRAINAGE BASIN MAP DEVELOPED DRAINAGE BASIN MAP ......... SNOHOMISH COUNTY SOILS MAP......... U PSTREAM/DOWNSTREAM TRI BUTARY AREA MAP PAGE 10 11 ...12 ,..13 ...14 Sundstone SP October,2019 19-0'117 Page2 1. INTRODUCTION & SITE CLASSIFICATION This document is intended to provide preliminary engineering information necessary to support the preliminary short plat permit application submittal to the City of Edmonds for the new 2 lot short plat proposed on this parcel. The current property is approximately 5L,922 sf. Access to the existing condos on this site is from an access easement to the northwest. The proposed access for the new SFR wíll be directly off of 9th Ave N along the western property line. The total area of disturbance including clearing and grading does not exceed s/c ãcrês and the new total impervious surfaces does exceed 3,550 sf. Therefore, this project is classified as a Category 1 Small Site Project. This classification was completed using figure 2-1 of the 2017 Storm water Code Supplement to Edmonds Community Development Code Chapter 18.30. Due to the existing soil conditions, on-site infiltration is not feasible for this project and dispersion will be the selected LID BMP for this project where feasible. Refer to Section 6 of this report for a detailed feasibility analysis. As a result, only minimum requirements 1-5 will be required to be reviewed and addressed for this project. This proposed project will create approximately 3,550 sf of new impervious surfaces including the proposed SFR and driveway. No impervious surfaces will be considered removed or replaced for this project. All of the new impervious surfaces will be mitigated using on-site stormwater management BMPs including dispersion and amended soils; both LID techniques. ln addition, another 3,550 sf of retrofit area will be mitigated on-site along the east side of proposed Lot 2 via a level spreader trench. This will meet the requirements per ECDC 18.30.060.0.5.b.i. The site is located at L4t4 9th Ave N, Edmonds, WA 98020, and in Section 13, Township 27N, Range 3E, Willamette Meridian. See Figure 1 - Vicinity Map. Sundstone SP October,2019 19-0117 Page 3 2. STORMWATER SITE PLAN As noted in Section 1 of this report this project is classified as a Category 1 Small Site Project. Therefore, this draínage design has been prepared to address the requirements contained in the City of Edmonds Stormwater Supplement and applicable handouts. This document is intended to provide the supporting information to justify the BMPs used and to detail how the design of the selected BMPs meet the rêquired standards. For this project some LID techniques were used to aid in minimizing the project's impacts to the neighboring properties and downstream system. The new NPGIS & PGIS runoff will be dispersed where feasible on-site and the soils within the proposed area of disturbance will be amended to landscaping conditions as per BMP T5.13 out of the 2014 DOE SWMMWW. This is done to reduce the stormwater runoff generated by the proposed imperuious surfaces. 3. SWPPP NARRATIVE Clearing, grading, and temporary erosion and sediment control plans will be prepared as part of the final engineering drawings. However, since a construction site is dynamic it will be necessary to reassess the erosion control BMP's during construction and install additional measures when necessary. Proposed temporary measures possible for this project will include the following BMP's: ¡ lnstallation of stabilized constructíon entrance. ¡ Retention of Existing Vegetation o Straw mulch, hydroseed or other mulching and planting method to stabilized unworked areas. o Silt fencing if necessary Permanent measures io reduce or eliminate erosion or water quality degradation will include the following BMP's: ¡ Paving all traffic areas (concrete/asphalt) o Permanent landscaping in pervíous areas. o Limiting cut aqd fill slopes to 2:1 maximum and 3:1 maximum where expqsed to standing water. ¡ Routine maintenance and inspection of the grounds and response to developing problems. The listed erosion control BMP's will be engineered for anticipated conditions in compliance with City and DOE guidelines. With proper installation, maintenance and inspection the proposed BMP's should result in minimal impact to the surrounding envíronment. The City retains the authority by code to require additional measures should the existing BMPs prove insufficient. Sundstone SP October,2019 19-0117 Page 4 A. SrrE GRADING/EROSION CONTROL RISK ASSESSMENT Area proposed to be cleared/worked: 9,000 sf = 0.21 acres Average slope for the site (w/in the area of disturbancel: t0% Erosion Hazard of Soil Moderate CriticalAreas downslope No Site is upstream of an ESA Stream No Based on the above information and the fact that the site will retain some existing vegetation and construction site runoff will filter through the soil, and that if site conditions warrant, additional BMP's can be implemented as corrective measures the Risk Category for this site is Low Risk. B. SWPPP MINIMUM ELEMENTS 1: Mark Clearing Limits The first step in the "Construction Sequence" included on the clearing and grading plan sheets is for the limits of clearing to be flagged and to have construction fencing placed along the limits prior to any other construction activity. 2: Establish Construction Access The SWPPP calls for the proposed construction entrance to be installed as the second step after the staking of clearing limits. A detail ís provided on the plans. 3: Control Flow Rates This project is below the thresholds requiring flow control for the project. 4: lnstall Sediment Controls This site and SWPPP proposes to construcUmaintain a construction entrance, retained vegetation and silt fencing. These features are intended to minimize the opportunity for sediment to leave the síte via stormwater or on vehicles. The construction of these features is one of the first items required in the "Construction Sequence". Mulch will also be used on the exposed soil as necessary to limit erosion. 5: Stabilize Soils The "Construction Sequence" calls for the stabilization of soils that remain unworked for ceftain lengths of time based on the time of year. Stabilization techniques may include but not limited to mulching, plastic sheeting or hydroseeding, notes have been added to the plan regarding protection for the stockpile area if necessary. A stockpile area has been identified on the SWPPP and is setback a minimum of 2S-feet from any down slope property line. 6: Protect Slopes All disturbed slopes on site during construction are requíred to be protected with mulch or other means as specified in the construction sequence. No concentrated runoff or significant amounts of sheet flow will be directed to new cut or fill slopes during construction. Sundstone SP October,2019 19-Afi7 Page 5 7: Protect Drain lnlets No new or existing culverts are proposed or affected by this project. 8: Stabilize Channels and Outlets No new channels or outlets are proposed for this site. 9: Control Pollutants No outside chemicals are expected to be necessary for the construction of this project. All vehicles working on and around the site would need to meet the State requirements for emissions. 10: Control DeWatering ÐeWatering will not be necessary for this project. However, the existing vegetation retained on site would be available to spread any water from construction for disposal. 1 1: Maintain BMPs The construction supervisor will be responsible for maintaining all BMPs during construction and working with the City to relocate or add BMPs as necessary as site conditions change. 12: Manage the Project It will be the responsibility of the Contractor and Developer to manage this project and coordinate with the City lnspector and Engineer. lnspection and Monitoring: Site inspections shall be done by a person who is knowledgeable in the principles and practices of erosion and sediment control. The person must have skills to first assess the site conditions and construction activities that could impact the quality of stormwater, and second assess the effectiveness of erosion and sediment control measures used to controlthe quality of stormwater discharges. Whenever inspection and/or monitoring reveals that thq BMPs identified in the Cônstruction SWPPP are inadequate, due to the actual discharge of or potential to discharge a significant amount of any pollutant, appropriate BMPs or design changes shall be implemented as soon as possible. Maintaining an Updated Construction SWPPP: The construction SWPPP shall be retained on-site or within reasonable access to the site. The SWPPP shall be modífied whenever there is a change in the design, construction, operation, or maintenance at the construction site that has, or could have, a significant effect on the discharge of pollutants to waters of the state. The SWPPP shall be modified if, during inspections or investigations conducted by the owner/operator, or the applicable local or state regulatory authority, it is determined that the SWPPP is ineffective in eliminating or significantly minimizing pollutants in stormwater discharges from the site. The SWPPP shall be modified as necessary to include additional or modified BMPs designed to correct problems identified. Revísions to the SWPPP shall be completed within seven days following inspection. Sundstone SP October,2019 19-0117 Page 6 4, WATER POLLUTION SOURCE CONTROL The City of Edmonds Stormwater Supplement and DOE Drainage manual was reviewed to determine if the proposed land-use for this project required any site-specific source control BMPs to be constructed. SFR projects are not listed as a proposed use that requires source control. Therefore, no síte/development specific source control BMPs are required for this project. 5. PRESERVATION OF NATURAL DRAINAGE SYSTEM The runoff from the on-site basin drains to the west towards the western property line and the adjacent R/W as sheet flow. lt was determined that the runoff from the site improvements will be dispersed on-site, the maximum extent feasible, or directly connected to the existing drainage system in the R/W. Both the proposed roof & driveway will disperse flows over amended soils when the required flow paths are available, otherwise roof downspouts will be collected and directed to a perforated stubout connection before discharging to the existing draínage system within 9th Ave N. This will allow the maximum amount of runoff to be treated and naturally absorb into the on-site soils while not concentrating any of the flows. By not grading or compacting most of the pervious surfaces to remain after construction in the area of disturbance a maximum amount of site runoff from the developed project will be absorbed into the existing on- site soils and remain as sheet flow as ít leaves the site which will match the existing conditions. 6. ON-SITE STORMWATER MANAGEMENT The on-site soils for this project have been mapped by the web soil survey as Alderwood Urban Land Complex. This soil type is typically a till soil in urban/developed areas where the existing ground has been disturbed/graded. Typically, the depth to the top of the till (hard pan) layer is between 2-3 feet below the existing grade. The soil unit is gravelly ashy sandy loam. Refer to Figure 4 to view Soils map. This project proposes to construct approximately 2,250 sf of new plus replaced roof surfaces and/or walks. Usíng the City of Edmonds Appendix A - On-Site Stormwater Management BMP lnfeasibility Criteria the following describes the BMP selection process for this project. Lawn and Landscaped Areas: Post-Construction SoiÍ Quality and Depth: This option was selected, and the speiifications will be provided on the future construction engineering plans. Roofs: Full Dispersion: Not selected since the 65:10 required ratio could not be met for this project since the LO0-foot retained/native vegetative flow path cannot be provided. Downspout Full lnfiltration: Based on the disturbed nature of the site and the mapped soil type there is not more than 3-feet of permeable soils available for this project. ln addition, the project Geotech has prepared a Sundstone SP October,2019 19-0117 PageT report based on their site investigations and found the long-term infiltration rate for the existing soils to be less than 0.05"/hr which is well below the infeasibility rate for infiltration. Bioretention or Rain Gardens: Based on the disturbed nature of the site and the mapped soil type there is not more than 3-feet of permeable soils available for this project and based on Geotechnical findings noted above. Downspout Dispersion Systems: SELECTED - Refer to Preliminary Development Plan No further Roof BMP evaluation for feasibility is necessary. Other Hard Surfaces: Permeable Pavement: Due to site grades it is necessary for much of the proposed driveway to be installed in a cut condition which causes the bottom of the lowest permeable layer to be within l-foot of the identified hard-pan layer and based on Geotechnical findings noted above. Bio-Retention or Rain Gardens: See discussion above. Sheet Flow Dispersion: SELECTED - Refer to Preliminary Development Plan. The roof will require a minimum of four splash blocks or level spreaders with additional locations allowed as needed based on the final roof/gutter layout. Each splash block will provide a minimum flow path of SO-feet over amended or natural vegetation/topsoil and level spreaders will provide 25'flow paths. A total of approximately 1,305 sf of PGIS is proposed for this project. The driveway will be graded to allow sheet flow dispersion along the north side of the new surface. The runoff will then flow over amended soils and vegetation to the maximum extent practical before being collected along the east side of the existing 9th Ave N road. surface where that is not possible. Any other walks or patios would be designed the same to allow runoff to sheet flow off the surface and spread over amended soils. All permeable surfaces that are graded or compacted during construction will be amended using topsoil or compost as provided in the specifications provided on sheet 6 of the plan set. Sundstone SP October,2019 19-0117 Page I 7. RUN.OFF TREATMENT This project proposes to construct less than 5,000 sf of new PGIS and is therefore exempt from any run-off treatment. 8. FLOW CONTROL This project proposes to construct less than 5,000 sf of new impervious surfaces and is therefore exempt from any flow control requirements. 9. WETLANDS PROTECNON This project will not impact any wetland on-site or downstream of the project site. Sundstone SP October,2019 19-0117 Page 9 10. OPERATIONS AND MAINTENANCE MANUAL The Property Owner will be responsible for maintaining the stormwater and landscapíng facilities within this development. lncluded in this manual are checklists for each feature specific to this project. Copies should be made of the checklists as necessary during routine inspections and required maintenance. Specific problems can be recorded along with the appropriate action taken. These checklists are a guide for inspections and maintenance. The frequency of the inspections/maintenance is identified in the left-hand column with the following abbreviations: A = Annual (March or April preferred) M = Monthly S = After Major Storms (Use l-inch in 24 hours as a guideline) Routine inspections and maintenance will improve the long-term performance of the stormwater facilities. lf at any time you are unsure if a problem exists or how to address a specific problem, contact a Professional Engineer. Refer to Appendix A for a list of each facility to be maintained and the appropriate maintenance checklist (To be provided with finalengineering report). Sundstone SP October,2019 19-0117 Page 10 APPENDIX A Sundstone SP October,2019 19-0117 Page 1 1