20191017163914.pdfsite Improvement Bond Quantity Worksheet S15 Web date: 04/03/2015
L9 King County CITY COPY
Department of Permitting & Environmental Review
35030 SE Douglas Street, Suite 210
Snoqualmie, Washington 98065-9266 For alternate formats, call 206-296-6600.
206-296-6600 M Relay 711
Project Name: Community Health Center Expansion Date: 9/17/2019
Location: 23320 Highway 99 Project No.:
Activity No.:
Clearing greater than or equal to 5,000 board feet of timber?
yes X no
If yes,
Forest Practice Permit Number:
(RCW 76.09)
RW -t TEK 1-716 cl'3, -1 15 X 1/6
hu, I M (J 501-19 S - 54) x .2--1 0/0
Page 1 of 9 ENGINEERING DIVIS10N
AtI7? DM NOTED
Completed li-wks-sbq-xis (CHC).xls
5 LD2_0 19 - 0 ?-iSq
Note: All prices include labor, equipment, materials, overhead and
profit. Prices are from RS Means data adjusted for the Seattle area
gr from local sources if not included in the RS Means database.
al, tJ,9,,50
16-1&. j;5 tri6jx f-ee6
RESUB
SEP 2 0 2019
Unit prices updated: 3/2/2015
Version: 3/2/2015
Report Date: 9/20/2019
Site Improvement Bond Quantity Worksheet S15 Webdate: 04/03/2015
Reference #
Unit
Price
Unit
Quantity
# of
Applications
Cost
EROSIONISEDIMENT CONTROL
lNumber
Backfill & com paction-em ban kment
Check dams, 4" minus rock
ESC-1
ESC-2
SWDM 5.4.6.3
$ 6.00
$ 80.00
CY
Each
Crushed surfacing 1 1/4" minus
ESC-3
WSDOT 9-03.9(3)
$ 95.00
CY
Ditching
ESC-4
$ 9.00
CY
Excavation -bulk
Fence, silt
Fence, Temporary (NGPE)
ESC-5
ES -6
ESC-7
SWDM 5.4.3.1
$ 2.00
$ 1.50
$ 1.50
CY
LF
LF
135
480
203
720
Hydroseeding
Jute Mesh
ESC-8
ESC-9
SWDM 5.4.2.4
SWDM 5.4.2.2
$ 0.80
$ 3.50
SY
SY
Mulch, by hand, straw, 3" deep
ESC-1 0
SWDM 5.4.2.1
$ 2.50
SY
Mulch, by machine, straw, 2" deep
ESC-1 1
SWDM 5.4.2.1
$ 2.00
SY
Piping, temporary, CPP, 6"
ESC-12
$ 12.00
LF
Piping, temporary, CPP, 8"
Piping, temporary, CPP, 12"
ESC-1 3
ESC-14
$ 14.00
$ 18.00
LF
LF
Plastic covering, 6mm thick, sandbagged IES
Rip Rap, machine placed; slopes JESC-16
Rock Construction Entrance, 50'xl5'xl' JESC-17
-15
SWDM 5.4.2.3
WSDOT 9-13.1(2)
SWIDM 5.4.4.1
$ 4.00
$ 45.00
$ 1,800.00
SY
CY
Each
1
1800
Rock Construction Entrance, 1 00'xl 5'xl'
ESC-1 8
SWDM 5.4.4.1
$ 3,200.00
Each
Sediment pond riser assembly
ESC-1 9
SWDM 5.4.5.2
$ 2,200.00
Each
Sediment trap, 5' high berm
ESC-20
SWDM 5.4.5.1
$ 19.00
LF
Sed. trap, 5' high, riprapped spillway berm section
ESC-21
SWDM 5.4.5.1
$ 70.00
LF
Seeding, by hand
Sodding, 1" deep, level ground
Sodding, 1" deep, sloped ground
ESC-22
SWDM 5.4.2.4
$ 1.00
SY
ESC-23
ESC-24
SWDM 5.4.2.5
SWDM 5.4.2.5
$ 8.00
$ 10.00
SY
SY
TESC Supervisor -
Water truck, dust control
ESC-25
ESC-26
SWDM 5.4.7
$ 110.00
$ 140.00
HR
HR
10
1100
WRITE -IN -ITEMS **** (see page 9)
Z�C-) )21
r
Each
Inso
ESC SUBTOTAL:
30% CONTINGENCY & MOBILIZATION:
ESC TOTAL:
COLUMN:
Page 2 of 9
Completed li-wks-sbq-xls (CHC).xls
$ �3_a22M L4 S-1 ?_ - 6 0
$ 1,146075 L4 (ok, -75
$ 4,969.25
A
Unit prices updated: 3/2/2015
Version: 3/2/2015
Report Date: 9/20/2019
Site Improvement Bond Quantity Worksheet Web date: 04/0312015
Existing
Right -of -Way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit I
Quant.
F--Clst
Quant.
Cost
Quant.
Cost
GENERAL ITEMS
No.
Backfill & Compaction- embankment
GI - 1
$ 6.00
CY
Backfill & Compaction- trench
G1 - 2
$ 9.00
CY
Clear/Remove Brush, by hand
GI - 3
$ 1.00
SY
Clearing/GrubbingrFree Removal
GI - 4
$10,000.00
Acre
Excavation - bulk
GI - 5
$ 2.00
CY
Excavation - Trench
GI - 6
$ 5.00
CY
Fencing, cedar, 6'high
GI - 7
$ 20.00
LF
Fencing. chain link. vinyl coated, 6'high
GI - 8
$ 20.00
LF
Fencing, chain link, gate, vinyl coated, 20
G1 - 9
$ 1,400.00
Each
Fencing. Mlit rail. 3' high
G1 - 10
$ 15.00
LF
Fill & compact - common barrow
GI - 11
$ 25.00
CY
Fill & compact - gravel base
G1 - 12
$ 27.00
CY
133.333
3,600.00
Fill & compact - screened topsoil
GI - 13
$ 39.00
CY
Gabion. 12" deep, stone filled mesh
G1 - 14
$ 65.00
SY
Gabion, 18" deep, stone filled mesh
GI - 15
$ 90.00
SY
Gabion, 36" deep, stone filled mesh
G1 - 16
$ 150.00
SY
Grading, fine, by hand
GI - 17
$ 2.50
SY
Grading, fine, with grader
GI - 18
$ 2.00
SY
133.333
266.67
Monuments, 3' long
GI - 19
$ 250.00
Each
Sensitive Areas Sign
GI - 20
$ 7.00
Each
Sodding, 1 " deep, sloped ground
GI - 21
$ 8.00
SY
Surveving. line & grade
G1 - 22
$ 850.00
Dav
Surveying. lot location/lines
G1 - 23
$ 1,800.00
Acre
Traffic control crew ( 2 flaggers
G1 - 24
$ 120.00
HR
Trail, 4" chipped wood
GI - 25
S 8.00
SY
Trail. 4" crushed cinder
GI - 261
$ 9.00
SY
Trail. 4" too course
G1 - 27
$ 12.00
SY
Wall, retaining, concrete
G1 - 28
$ 55.00
SF
Wall, rockery
G1 - 29
$ 15.00
SF
Page 3 of 9 SUBTOTAL 3,866.67
*KCC 27A authorizes only one bond reduction.
Completed li-wks-sbq-xis (CHC).xIs
Unit prices updated: 03/02/2015
Version: 03/02/2015
Report Date: 9/20/2019
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Future Public
Private
Right-of-way
Right of Way
Improvements
& Drainage Facilities
I
—
Cost
Quant. Cost
—Qu—an—t. Cost
ROADIMPROVEMENT No.
AC Grinding, 4'wide machine < 1000sy Rl- 1 $ 30.00 SY
AC Grinding, 4'wide machine 1000-20Mz
RI - 2
$ 16.00
SY
AC Grinding, 4'wide machine > 2000sy
RI - 3
$ 10.00
SY
AC Removal/Disposal
RI - 4
$ 35.00
SY
Barricade, type III ( Permanent
RI - 6
$ 56.00
LF
Curb & Gutter, rolled
RI - 7
$ 17.00
LF
Curb & Gutter, vertical
RI - 8
$ 12.50
LF
Curb and Gutter, demolition and disposal
RI - 9
$ 18.00
LF
Curb, extruded asphalt
RI - 10
$ 5.50
LF
Curb, extruded concrete
RI - 11
$ 7.00
LF
Sawcut, asphalt, 3" depth
Rl - 12
$ 1.85
LF
Sawcut, concrete, per 1 " depth
RI - 13
$ 3.00
LF
Sealant, asphalt
RI - 141
$ 2.00
LF
Shoulder, AC, ( see AC road unit price
RI - 15
$ -
SY
Shoulder, gravel, 4" thick
RI - 16
$ 15.00
SY
Sidewalk, 4" thick
RI - 17
$ 38,00
SY
133.333
5,066.67
Sidewalk, 4" thick, demolition and diSDOW
RI - 18
$ 32.00
SY
Sidewalk, 5" thick
RI - 19
$ 41.00
SY
Sidewalk, 5" thick, demolition and disposa
RI - 20
$ 40.00
SY
Sign, handicap
RI - 21
$ 85.00
Each
Striping, per stall
RI - 22
$ 7.00
Each
Striping, thermoplastic, ( for crosswalk
RI - 23
$ 3.00
SF
Striping, 4" reflectorized line
RI - 24
$ 0.50
LF
Page 4 of 9
SUBTOTAL
12VO5
5,066.67
Unit prices updated, 03/02/2015
*KCC 27A authorizes only one bond reduction. Version: 03/02/2015
Completed li-wks-sbq-xls (CHC).xls Report Date: 9/20/2019
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant. Cost
Quant. Cost
Quant. ��Cost
ROAD SURFACING
No.
(4" Rock 2.5 base & 1.5" top
course) 9 1/2" Rock= 8" base & 1.5" p course)
Additional 2.5" Crushed Surfacing
RS - 1
$ 3.60
SY
HMA 1/2" Overlay, 1.5"
RS-2
$ 14.00
SY
HMA 1/2" Overlay 2"
RS - 3
$ 18.00
SY
HMA Road, 2", 4" rock, First 2500 SY
RS - 4
$ 28.00
SY
HMA Road. 2". 4" rock, Qty. over 2500 S)-
RS - 5
$ 21.00
SY
HMA Road, 3", 9 1/2" Rock, First 2500 S),
RS-6
$ 42.00
SY
HMA Road. 3". 9 1/2" Rock, Qty Over 250
RS - 7
$ 35.00
SY
Not Used
RS - 8
Not Used
RS-9
HMA Road, 6" Depth, First 2500 SY
RS - 10
$ 33.10
SY
HMA Road, 6" Depth, Qty. Over 2500 SY
RS - 11
$ 30.00
SY
HMA 3/4" or 1". 4" Depth
RS - 12'
$ 20.00
SY
Gravel Road, 4" rock, First 2500 SY
RS - 13
$ 15.00
SY
Gravel Road. 4" rock. Qty. over 2500 SY
RS - 14.
$ 10.00
SY
PCC Road (Add Under Write -Ins w�Desig
RS - 151
Thickened Edge IRS
- 171
$ 8.60
LF
Page 5 of 9
SUBTOTAL
Unit prices updated: 03/02/2015
*KCC 27A authorizes only one bond reduction. Version: 03/02/2015
Completed li-wks-sbq-x1s (CHC).xls Report Date: 9/20/2019
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price Unit
Q u—a—n t—T Cost
—Quant7 Cost
Quant. Cost
DRAINAGE (CPP =Corrugated Plastic Pipe, N12 or Equivalent) For Culvert prices, Average f 4'cover was assumed. Assume perforated PVC is same price as solid oipe.
Access Road, R/D
D-1-1 $ 21.00
1 SY
Bollards - fixed
D-2 $ 240.74
Each
Bollards - removable D-3 S 452.34 Each
* (CBs include frame and lid)
CB Type I
D-4
$ 1,500.00
Each
CB Tvpe IL
D-5
$ 1,750.00
Each
CB Type 11, 48" diameter
D-6
$ 2,300.00
Each
for additional depth over 4'
D-7
$ 480.00
FT
CB TVpe 11, 54" diameter
D - 8
$ 2,500.00
Each
for additional depth over 4'
D-9
$ 495.00
FT
CB Type 11, 60" diameter
for additional depth over 4'
D-10
D - 11
$ 2,800.00
$ 600.00
Each
FT
CB Type 11, 72" diameter
D - 12
$ 3.600.00
Each
for additional depth over 4'
D - 13
$ 850.00
FT
Through -curb Inlet Framework (Add)
D - 14
$ 400.00
Each
Cleanout, PVC, 4"
D - 15
$ 150.00
Each
Cleanout, PVC, 6"
D - 16
$ 170.00
Each
Cleanout, PVC, 8"
D - 17
$ 200.00
Each
Culvert, PVC, 4"
D - 18
$ 10.00
LF
100
1,000.00
Culvert, PVC, 6"
Culvert, PVC, 8"
D - 19
D - 20
$ 13.00
$ 15.00
LF
LF
Culvert, PVC, 12"
D - 21
$ 23.00
LF
Culvert, CMP, 8"
D - 22
$ 19.00
LF
Culvert, CMP, 12"
D - 23
$ 29.00
LF
Culvert, CMP, 15"
D - 24
$ 35.00
LF
Culvert, CMP, 18"
D - 25
$ 41.00
LF
Culvert, CMP, 24"
D - 26
$ 5600
LF
Culvert, CMP, 30"
D - 27
$ 78.00
LF
Culvert, CMP, 36"
D - 28
$ 130.00
LF
Culvert, CMP, 48"
D - 29
$ 190.00
LF
Culvert, CMP, 60"
D - 30
$ 27000
LF
lCulvert, CMP, 72"
D - 31
$ 350.00
LF
Page 6 of 9
SUBTOTAL
Unit prices updated: 03/02/2015
*KCC 27A authorizes only one bond reduction. Version: 03/02/2015
Completed li-wks-sbq-xls (CHC).xls Report Date: 9/20/2019
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
DRAINAGE CONTINUED
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
No.
Unit Price
Unit
Quant.
7-cost
Quant. I
Cost
Quant.
I Cost
Culvert, Concrete, 8"
D - 32
$ 25.00
LF
Culvert, Concrete. 12"
D - 33
$ 36.00
LF
Culvert, Concrete, 15"
D - 34
$ 42.00
LF
Culvert, Concrete, 18"
D - 35
$ 48.00
LF
Culvert, Concrete, 24"
D - 36
$ 78.00
LF
Culvert, Concrete, 30"
D - 37
$ 125.00
LF
Culvert. Concrete. 36"
D - 38
$ 150.00
LF
Culvert, Concrete, 42"
D - 39
$ 175.00
LF
Culvert, Concrete, 48"
D - 40
$ 205.00
LF
Culvert, CPP, 6"
D - 41
$ 14.00_
LF
Culvert, CPP, 8"
D - 42
$ 16.00 ,
LF
Culvert, CPP, 12"
D - 43
$ 24.00
LF
Culvert. CPP. 15'
D - 44
$ 35.00
LF
Culvert, CPP, 18"
D-45
$ 41.00
LF
Culvert. CPP. 24"
D - 46
$ 56.00
LF
Culvert, CPP, 30"
D-47
S 78.00
LF
Culvert. CPP. 36"
D-48
$ 130.00
LF
Ditching
D-49
$ 9.50
CY
Flow DiSDersal Trench (1.436 base+)
D-50
$ 28.00
LF
French Drain (3'depth)
D - 51
$ 26.00
LF
Geotextile, laid in trench, polypropylene
D - 52
$ 3.00
SY
Mid -tank Access Riser. 48" dia. 6'deep
D - 54
$ 2,000.00
Each
Pond Overflow Spillway
D - 55
$ 16.00
SY
Restrictor/Oil Separator, 12"
D - 56
$ 1,150.00
Each
Restrictor/Oil Separator, 15"
D - 57
$ 1,350.00
Each
Restrictor/Oil Separator. 18"
D - 58
$ 1,700.00
Each
Riprap, placed
D-59
$ 42.00
CY
Tank End Reducer (36" diameter)
D - 60
$ 1.200.00
Each
Trash Rack. 12"
D - 61
$ 350.00
Each
Trash Rack, 15"
D - 62
$ 410.00
Each
Trash Rack, 18"
D-63
$ 480.00
Each
ITrash Rack, 21"
D - 64,
$ 550.00
1 Each
Page 7 of 9
SUBTOTAL
Unit prices updated: 03/02/2015
*KCC 27A authorizes only one bond reduction. Version: 03/02/2015
Completed li-wks-sbq-xls (CHC).xls Report Date: 9/20/2019
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
I --
Existing
Right-of-way
Future Public I Private
Right of Way Improvements
& Drainage Facilities
Unit Price
I Gnit
Quant. Price
Quant7 Cost Quant. Cost
PARKING LOT SURFACING Not To Be Used For Roads Or Shoulders
No.
2" AC. 2" top course rock & 4" borrow
PL - 1
$ 21.00
SY
NA
NA
2" AC, 1.5" top course & 2.5" base cours
PL - 2
$ 28.00
SY
NA
NA
4" select borrow
PL - 3
$ 5.00
SY
NA
NA
1.5" top course rock & 2.5" base course
PL-4
$ 14.00
SY
NA
NA
UTILITY POLES & STREET LIGHTING Utility pole relocation costs must be accompanied by Franchise Utility's Cost Estimate
Utility Pole(s) Relocation
UP-1
Lump Sum
Street Light Poles w/Luminaires
UP-2
$ 7,500.00 1 Each
WRITE4N-ITEMS
(SUch as detention/water quality vaults.)
No.
Stormwater Vault I
W1 - 1
Each
Block Wall j
WI-2
$ 16.00
SY
Yard Drain
Wl - 3
$ 225.00
—EA
8
1,800.00
Tree Grates
W1 - 4
$ 6.00
EA
1000
6000
Landscaping / Planter Boxes
Wl - 5
$ 1,000.00
SF
10
10.000.00
WI - 6
Wl - 7
wl - 8
W1 - 9
wi-10
SUBTOTAL
6,000.00
SUBTOTAL (SUM ALL PAGES):
5,0�
30% CONTINGENCY & MOBILIZATION:
1,8we'D
GRANDTOTAL:
7-,�
COLUMN:
B
Page 8 of 9
C
it S00-00
-7 (o (o 5o -1Aci5M-.
(qqJ60 32,47833
D
Unit prices updated: 03/02/2015
*KCC 27A authorizes only one bond reduction. Version: 03/02/2015
Completed li-wks-sbq-xls (CHC).xls Report Date: 9/20/2019
Site Improvement Bond Quantity Worksheet Web date: 04/03/2015
Original bond computations prepared by:
Name: Date
PE Registration Number: Tel. #
Firm Name:
Address: Project No
Stabilization/Erosion Sediment Control (ESC)
Existing Right -of -Way Improvements
Future Public Right of Way & Drainage Facilities
Private Improvements
Calculated Quantity Completed
Total Right -of Way and/or Site Restoration Bond*/**
(First $7,500 of bond* shall be cash.)
Performance Bond* Amount (A+B+C+D) = TOTAL
Maintenance/Defect Bond* Total
NAME OF PERSON PREPARING BOND* REDUCTION:
FINANCIAL GUARANTEE REQUIREMENTS
PERFORMANCE BOND*
AMOUNT
(A) $ 2-5 4-_�96�
(B) $ QCct�.
(C) $
(D) $
(A+B) _s 1-7, Sff 9 .1.5
M $
Minimum is $2000.
MINIMUM BOND* AMOUNT
REQUIRED FOR RECORDING OR
TEMPORARY OCCUPANCY AT
SUBSTANTIAL COMPLETION —
T x 0.30 $ 1-3�,747-3
Minimum is $2000.
PUBLIC ROAD & DRAINAGE
MAINTENANCE/DEFECT BOND*
(B+C) x
0.25 = $
Minimum is $2000.
Date:
NOTE: The word "bond" as used in this document means a financial guarantee acceptable to King County.
NOTE: KCC 27A authorizes right of way and site restoration bonds to be combined when both are required.
The restoration requirement shall include the total cost for all TESC as a minimum, not a maximum In addition, corrective work, both on- and off -site needs to be included+
Quantities shall reflect worse case scenarios not just minimum requirements. For example, if a salmonid stream may be damaged, some estimated costs for restoration
needs to be reflected in this amount. The 30% contingency and mobilization costs are computed in this quantity.
NOTE: Per KCC 27A, total bond amounts remaining after reduction shall not be less than 30% of the original amount (T) or as revised by major design changes.
REQUIRED BOND* AMOUNTS ARE SUBJECT TO REVIEW AND MODIFICATION BY KING COUNTY
Page 9 of 9 Check out the DDES Web site at www. kin Unit prices updated: 03/02/2015
_gcounty.goylpermit Version: 03/02/2015
Completed li-wks-sbq-xIs (CHC).xls Report Date: 9/20/2019