DATE: November 14, 2019
TO: Henry Byam
hb@wescogroupinc.com
FROM: Donovan Akau, Plans Examiner
RE: Plan Check: BLD2019-1326
Project Address: 7820 193rd Place SW
Scope: Removal of existing carport/New attached garage
Please be advised that the building plans for the above referenced project have been disapproved for the purposes of
obtaining a building permit. During a review of the plans by the Building Division for compliance with the applicable
building codes, it was found that the following information, clarifications, or changes are needed. Reviews by other
divisions, such as Planning, Engineering, or Fire, may result in additional comments that require attention beyond the
scope of this letter. Items that recur on this list appear in italics.
A complete review cannot be performed until the revised plans/documents, including a written response in
itemized letter format indicating where the ‘clouded’ or otherwise highlighted changes can be found on the
revised plans, have been submitted to a Permit Coordinator.
Resubmittals must be made at the Development Services Department on the 2nd Floor of City Hall. Permit Center hours
are M, T, Th, & F from 8am-4:30pm and from 8:30am-12pm on Wednesdays.
Sheet A4:
1. Detail 1/S1 appears to have a footing that is 2’ in width. On sheet S1 typical detail indicates a 16’ wide
footing. Please clarify/correct this on the plans.
2. The West side of the footing indicates a 1’ wide footing, is this correct? I am not able to find a detail for
that West wall foundation. Please clarify/correct this on the plans.
Sheet A5:
3. The 6 x12 ridge beam does not match the calculation packet. In the packet it is indicated that the ridge
beam is a 6 ¾ x 15 glulam beam. The glue lam beam appears to be over spanned as well. Clarify/correct
this on the plans so that the calculation packet and plans coincide with each other.
4. Please indicate how the ridge beam connection is to be achieved at the Northern side of the project.
5. Indicate on he plans how the 2 x 10 joists are to be positively connected.
6. It appears that the 4 x 12 header is a continuous header to wall ends is this accurate. If not please
provide details as to the connections of both end of this beam.
7. There is no indication as to what type of sheeting is being used for the roof/floor of deck. Indicate this
on the plans and please check that the sheeting is sufficient for the torch down roof that is be installed
per manufactures instructions as indicated on sheet A/6.
8. Clarify the (2) 2 x10 Hf #2 at the south section of the new garage. Is this a wall? Please clarify and
provide details as to what is being constructed.
City of Edmonds
PLAN REVIEW COMMENTS
BUILDING DIVISION
(425) 771-0220
Page 2 of 3
Sheet A6:
9. Please make it the dimensions provided for the footing clearer. I am unable to clearly use the dimension
provided...
10. Indicate the depth of the footing for detail 3 of S-1.
General Notes:
11. Please revisit the plans for this project and ensure that the calculations, members, details are accurate
and easily distinguishable for this project.
12. Clarify the type of material being used for the Side Sewer that will be covered by the new concrete slab
for this project. Please indicate this on the Site plan.
Upon review of the resubmitted documents, additional comments may be genera ted. Please contact me if you have any
questions.
Sincerely,
Donovan Akau
Page 3 of 3