Loading...
2019-1429 McDowell.pdf - LEGACY DATE: December 5, 2019 TO: Mark McDowell MHMCD@WELL1@gmail.com FROM: Donovan Akau, Plans Examiner RE : Plan Check: BLD2019-1429 Project Address: 23521 75th Avenue West Scope: Demolition of existing garage/ New attached 3 car garage with 2nd floor art studio Please be advised that the building plans for the above referenced project have been disapproved for the purposes of obtaining a building permit. During a review of the plans by the Building Division for compliance with the applicable building codes, it was found that the following information, clarifications, or changes are needed. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments that require attention beyond the scope of this letter. Items that recur on this list appear in italics. A complete review cannot be performed until the revised plans/documents, including a written response in itemized letter format indicating where the ‘clouded’ or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. Resubmittals must be made at the Development Services Department on the 2nd Floor of City Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm and from 8:30am-12pm on Wednesdays. General: 1. Please clarify the use of the new Art studio for this project. It is stated on the floor plan that the new 2 nd story above the garage is an office? Make corrections on the plans. 2. The engineer of record is to provide more detail for the Drag Strut connection and detail. Please consult with your Truss manufacturer/Design professional and provide the details on the set of plans where it is applicable. Please have Structural Engineer review/stamp and sign the truss drawings for this project. 3. Please have EOR (Engineer of Record) review sheet(s) A2 thru A4 and stamp/sign these sheets or remove the dimensions to the structural members and fasteners being used. There appears to be conflicting member sizes and fasteners to the stamped structural sheets provided for this project. 4. Provide a detail as to how the ledger(s) are to be attached for this project. Provide this on the plans to be stamped and signed EOR. 5. Th ere is no indication as to the structural sizes for the construction of the walls. Please have EOR review the design of these walls and provide a detail to what will be used for this project. 6. Sheet A3 indicates a 2x6 HF#2 CJ @ 24” oc. Please clarify if this is to be used with this span with storage above. Please verify that calculations will allow the use the 2x8 DF@ 24” OC. 7. Please have EOR verify and approve the knee bracing and that they meet the code standard for connection and length of the knee bracing. Correct this on the plans. City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 Page 2 of 2 8. Provide how the fire separation is going to be achieved from the habitable space to garage. For both walls and ceilings. Upon review of the resubmitted documents, additional comments may be generated. Please feel free to call me with any questions that you may have on my comments letter. Sincerely, Donovan Akau