Loading...
2078.01 Sajec PLANS_REV 3_5-23-19.pdfA A' STREET SETBACK 25' SIDE SETBACK 10'2.11' 2.45' SD SD S D SD SD SD SD SD SD DESIGNED: SCALE: CHECKED: DRAWN: DATE:SHEET JOB NO. OF BY DESCRIPTIONDATENO. PLOT DATE: DRAWING 19019 36th Avenue West, Suite E |Lynnwood, WA 98036 PH: (425) 582-9928 | Fax: (425) 582-9930 | www.zippergeo.com SUBMITTAL RECORD 5/23/19 LAST EDIT:Rob Z:\Projects\2051 - 2100\2078.01 Sajec Wall\Working File\Drafting\2078.01 Plan Set (REV 2).dwg RAR1/22/19-INITIAL RELEASE FOR PERMIT 10 SAJEC RESIDENCE RETAINING WALLS 19213 OLYMPIC VIEW DRIVE EDMONDS, WASHINGTON1/22/19 2078.01 RAR RMS/RAR RMS/RAR 5/23/19 RAR3/26/191 REVISED GRADES & STORM CONNECTION PER CITY OF EDMONDS REVIEW COMMENTS RAR3/27/192 REVISED SHT. C1.0 PER. ENGINEERING REVIEW COMMENTS 2 RAR5/23/193 REVISED TO SINGLE WALL PER OWNER REQUEST 12 CONTACT INFORMATION: CLIENT: LEIA & ANTHONY SAJEC 19213 OLYMPIC VIEW DRIVE EDMONDS, WA 98020 SURVEY: PACIFIC COAST SURVEYS, INC. P.O. BOX 13619 MILL CREEK, WA 98082 (206) 930-7493 GEOTECHNICAL ENGINEER: ZIPPER GEO ASSOCIATES, LLC 19019 36TH AVE. WEST, SUITE E LYNNWOOD, WA 98036 (425) 582-9928 CONTACT: ROBERT ROSS, P.E. rross@zippergeo.com SHEET INDEX C1.0 - COVER SHEET AND SITE PLAN SUR1.0 - TOPOGRAPHIC SURVEY TESC1.0 - TESC PLAN TESC1.1 - TESC STANDARD DETAILS TESC1.2 - TESC STANDARD DETAILS RW1.0 - RETAINING WALL GENERAL NOTES RW2.0 - RETAINING WALL PLAN AND PROFILE VIEWS RW3.0 - TYPICAL SECTIONS AND DETAILS RW3.1 - TYPICAL SECTIONS AND DETAILS RW3.2 - SECTIONS AND DETAILS APPROXIAMTE SCALE IN FEET 0 10 2020 BASEMAP FROM TOPOGRAPHIC SURVEY BY PACIFIC COAST SURVEYORS DATED 9/28/18. NEW WALL SEE SHT. RTW2.0 SITE SECTION SHEET RW3.2 EDGE OF ASPHALT EDGE OF ASPHALT PROPOSED GRADE CONTOURS (TYP.) CONNECT WALL DRAIN TO NEW TYPE 1 CB PER CITY OF EDMONDS STANDARD DETAIL SD-303. PROVIDE 2' MIN. COVER CB RIM = 142.00 IE 12" RCP(N) = 137.91 (EXST.) IE 12" RCP(S)= 137.92 (EXST.) IE 4" PVC(E)= 139.67 (NEW) IEs OF EXST. ESTIMATED. CONTRACTOR TO VERIFY AND ADJUST AS NEEDED NOTES: 1.CONTRACTOR SHALL PROTECT EXISTING UTILITIES. 2.HYDRO SEED BARE SOIL AREAS UPON CONSTRUCTION COMPLETION. WALL DRAIN TIGHTLINE INVT. ELEV.= 144.83 TIGHTLINE 4" PVC LENGTH= 19.58' DESIGNED: SCALE: CHECKED: DRAWN: DATE:SHEET JOB NO. OF BY DESCRIPTIONDATENO. PLOT DATE: DRAWING 19019 36th Avenue West, Suite E |Lynnwood, WA 98036 PH: (425) 582-9928 | Fax: (425) 582-9930 | www.zippergeo.com SUBMITTAL RECORD 5/23/19 LAST EDIT:Rob Z:\Projects\2051 - 2100\2078.01 Sajec Wall\Working File\Drafting\2078.01 Plan Set (REV 2).dwg RAR1/22/19-INITIAL RELEASE FOR PERMIT 10 SAJEC RESIDENCE RETAINING WALLS 19213 OLYMPIC VIEW DRIVE EDMONDS, WASHINGTON1/22/19 2078.01 RAR RMS/RAR RMS/RAR 5/23/19 RAR3/26/191 REVISED GRADES & STORM CONNECTION PER CITY OF EDMONDS REVIEW COMMENTS RAR3/27/192 REVISED SHT. C1.0 PER. ENGINEERING REVIEW COMMENTS 2 RAR5/23/193 REVISED TO SINGLE WALL PER OWNER REQUEST AS SHOWN TEMPORARY EROSION AND SEDIMENT CONTROL GENERAL NOTES PART 1 - GENERAL 1.THE SUCCESS OF THIS PROJECT IS HIGHLY DEPENDANT ON CONTROL OF SURFACE WATER RUNOFF INTO THE WORK AREA TO PREVENT EROSION AND DESTABILIZATION OF THE SLOPE. 2.COMPLETION OF THIS PROJECT WILL REQUIRE TEMPORARILY REMOVING VEGETATION FROM A STEEP SLOPE. THE EXPOSED SURFACE MUST BE PROTECTED FROM EXPOSURE TO DIRECT RAINFALL AND SURFACE WATER RUNOFF TO THE EXTENT POSSIBLE DURING CONSTRUCTION. IF WET WEATHER IS EXPECTED (DEFINED AS FORECAST RAINFALL GREATER THAN 0.25 INCHES IN A 12 HOUR PERIOD), AT THE END OF EACH WORK DAY, THE SLOPE SHALL BE COVERED WITH ANCHORED PLASTIC SHEETING. AREAS OF THE SITE THAT WILL BE UN-WORKED FOR MORE THAN TWO DAYS SHOULD BE COVERED WITH ANCHORED PLASTIC SHEETING. DEPENDING ON THE CONSTRUCTION PROGRESS, THERE MAY BE A NEED TO TEMPORARILY DELAY WORK AT THE SITE IF HEAVY RAINFALL IS FORECAST. TEMPORARY WORK DELAYS DURING CONSTRUCTION WILL BE EVALUATED ON A CASE-BY-CASE BASIS THROUGH OBSERVATION OF SITE CONDITIONS BY ZIPPER GEO ASSOCIATES IN COORDINATION WITH THE CONTRACTOR. 3.CONSTRUCTION EROSION CONTROL MEASURES MUST BE IN PLACE AND APPROVED BY THE ENGINEER AND CITY PRIOR TO ANY EARTH DISTURBANCE. 4.THE IMPLEMENTATION OF THE TEMPORARY EROSION AND SEDIMENT CONTROL (TESC) PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT AND UPGRADING OF THE TESC FACILITIES IS THE RESPONSIBILITY OF THE CONTRACTOR UNTIL ALL CONSTRUCTION IS APPROVED AND SITE IS PERMANENTLY STABILIZED. 5.THE CONTRACTOR SHALL PROVIDE AND MAINTAIN TEMPORARY SEDIMENTATION COLLECTION FACILITIES TO ENSURE THAT SEDIMENT-LADEN WATER DOES NOT ENTER THE PUBLIC DRAINAGE SYSTEM. AS CONSTRUCTION PROGRESSES AND UNEXPECTED (SEASONAL) CONDITIONS DICTATE, MORE TEMPORARY SEDIMENTATION COLLECTION FACILITIES MAY BE REQUIRED TO PREVENT VIOLATING APPLICABLE WATER STANDARDS. THEREFORE, DURING THE COURSE OF CONSTRUCTION IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE CONTRACTOR TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THEIR ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES THAT MAY BE NEEDED TO PROTECT ADJACENT PROPERTIES. 6.THE TESC FACILITIES SHOWN ON THESE PLANS MUST BE CONSTRUCTED IN CONJUNCTION WITH ALL CLEARING AND GRADING ACTIVITIES, AND IN SUCH A MANNER AS TO ENSURE THAT SEDIMENT-LADEN WATER DOES NOT LEAVE THE SITE, ENTER THE DRAINAGE SYSTEM, OR VIOLATE APPLICABLE WATER STANDARDS. 7.NO SEDIMENT SHALL BE TRACKED INTO THE STREET OR PAVED SURFACES. SEDIMENT SHALL BE REMOVED FROM TRUCKS AND EQUIPMENT PRIOR TO LEAVING THE SITE. IN THE EVENT OF FAILURE OF THE EROSION CONTROL SYSTEM RESULTING IN SEDIMENT BEING TRACKED ONTO PAVED SURFACES, THE CONTRACTOR SHALL IMMEDIATELY IMPLEMENT MEASURES TO CORRECT THE SITUATION, AND VACUUM STREET SWEEPING SHALL BE EMPLOYED ON AN EMERGENCY BASIS. IF VACUUM STREET SWEEPING VEHICLES ARE UTILIZED, THEY SHALL BE OF THE TYPE THAT REMOVES THE SEDIMENT FROM THE PAVEMENT. WASHING OF THE STREETS WILL NOT BE ALLOWED WITHOUT PRIOR CITY OF EDMONDS APPROVAL. 8. AREAS NOT WORKED FOR MORE THAN 2 DAYS SHALL BE COVERED WITH ANCHORED PLASTIC SHEETING. PART 1 - GENERAL CONT. 9.NO SEDIMENT SHALL BE ALLOWED TO ENTER ANY CATCH BASIN WITHIN THE SITE, OR ADJACENT PROPERTIES. IN THE EVENT OF A FAILURE OF THE TESC PLAN THAT RESULTS IN SEDIMENT ENTERING A CATCH BASIN, THE CONTRACTOR SHALL REMOVE ALL SUCH SEDIMENT IMMEDIATELY. 10.DISTURBED SOILS THAT ARE EXPOSED TO SURFACE RUNOFF SHALL BE IMMEDIATELY STABILIZED WITH TESC MEASURES AND APPROVED BY THE ENGINEER AND CITY. 11.THE TESC FACILITIES SHALL BE INSPECTED DAILY BY THE CONTRACTOR AND MAINTAINED AS NECESSARY TO ENSURE THEIR CONTINUED FUNCTIONING. 12.CATCH BASINS IN THE STREET SHALL BE INSPECTED BY THE CONTRACTOR DAILY. WATER LEAVING THE SITE DURING CONSTRUCTION, INCLUDING WATER CARRIED BY TRUCKS, SHALL BE CLEAN. THE CONTRACTOR SHALL CLEAN CITY CATCH BASINS AND IMPLEMENT EXTRA SEDIMENTATION CONTROL MEASURES IF NECESSARY AND AS DIRECTED BY THE CITY OF EDMONDS INSPECTOR/DOE INSPECTOR AT NO ADDITIONAL EXPENSE TO OWNER. 13.THE TESC FACILITIES SHALL BE MAINTAINED UNTIL PERMANENT EROSION CONTROL (REVEGETATION WITH TREES, SHRUBS, GROUND COVER, ETC.) PER THE APPROVED PLANS IS IN PLACE. 14.WHERE SEEDING FOR TEMPORARY EROSION CONTROL IS USED, FAST GERMINATING GRASSES SHALL BE APPLIED AT AN APPROPRIATE RATE. 15.WHERE STRAW MULCH FOR TEMPORARY EROSION CONTROL IS USED, IT SHALL BE APPLIED AT A MINIMUM THICKNESS OF TWO INCHES. 16.THE CONTRACTOR IS SOLELY RESPONSIBLE FOR ALL MEANS AND METHODS AND SEQUENCING OF TESC MEASURES AND ENSURING WATER QUALITY REQUIREMENTS ARE MET. PART 2 - TEMPORARY EXCAVATION STABILITY 1.A TEMPORARY EXCAVATION WILL BE REQUIRED TO CONSTRUCT THE RETAINING WALLS. TEMPORARY EXCAVATION SLOPE STABILITY IS A FUNCTION OF MANY FACTORS, INCLUDING: GROUNDWATER SEEPAGE, THE TYPE AND DENSITY OF THE VARIOUS SOIL STRATA, THE DEPTH OF CUT; SURCHARGE LOADINGS ADJACENT TO THE EXCAVATION, AND THE LENGTH OF TIME THE EXCAVATION REMAINS OPEN. 2.AS THE CONTRACTOR IS CONTINUOUSLY PRESENT AT THE SITE AND ABLE TO CONTINUOUSLY OBSERVE SITE CONDITIONS, THE CONTRACTOR SHOULD BE RESPONSIBLE FOR MAINTENANCE OF SAFE SLOPES AND WORKER SAFETY. WE RECOMMEND THE CONTRACTOR CONTINUOUSLY OBSERVE TEMPORARY EXCAVATIONS FOR INDICATIONS OF INSTABILITY SUCH AS SOIL SLUMPS, GROUNDWATER SEEPAGE AT THE SURFACE OF THE SLOPE, AND CRACKS OR DOWN SETTING OF THE GROUND SURFACE AT THE TOP OF THE SLOPE OR ALONG ANY PORTION OF THE SLOPE. IF SIGNS OF INSTABILITY ARE OBSERVED, THE CONTRACTOR SHALL STOP WORK AND CONTACT ZIPPER GEO ASSOCIATES IMMEDIATELY FOR FURTHER OBSERVATION AND RECOMMENDATIONS. 3.ZIPPER GEO ASSOCIATES (ZGA) SHALL PROVIDE PERIODIC OBSERVATION OF THE CLEARING AND RETAINING WALL CONSTRUCTION AS IT PROCEEDS. ZGA SHALL OBSERVE THE SITE AND TEMPORARY EXCAVATIONS IMMEDIATELY AFTER A RAINFALL EVENT TOTALING 0.5 INCHES OR MORE IN A 24 HOUR PERIOD . 16.44' 36.84' DESIGNED: SCALE: CHECKED: DRAWN: DATE:SHEET JOB NO. OF BY DESCRIPTIONDATENO. PLOT DATE: DRAWING 19019 36th Avenue West, Suite E |Lynnwood, WA 98036 PH: (425) 582-9928 | Fax: (425) 582-9930 | www.zippergeo.com SUBMITTAL RECORD 5/23/19 LAST EDIT:Rob Z:\Projects\2051 - 2100\2078.01 Sajec Wall\Working File\Drafting\2078.01 Plan Set (REV 2).dwg RAR1/22/19-INITIAL RELEASE FOR PERMIT 10 SAJEC RESIDENCE RETAINING WALLS 19213 OLYMPIC VIEW DRIVE EDMONDS, WASHINGTON1/22/19 2078.01 RAR RMS/RAR RMS/RAR 5/23/19 RAR3/26/191 REVISED GRADES & STORM CONNECTION PER CITY OF EDMONDS REVIEW COMMENTS RAR3/27/192 REVISED SHT. C1.0 PER. ENGINEERING REVIEW COMMENTS 2 RAR5/23/193 REVISED TO SINGLE WALL PER OWNER REQUEST NOT TO SCALE INSTALL CATCH BASIN FILTER INSTALL CATCH BASIN FILTER APPROXIAMTE SCALE IN FEET 0 10 2020 SILT FENCE (TYP.) CONSTRUCTION ENTRANCE NOTES: 1.CONTRACTOR/DEVELOPER SHALL MAINTAIN AND ENSURE PROPER EROSION CONTROL THROUGHOUT PROJECT. 2.SILT FENCE TO BE PLACED DOWNSLOPE OF CONSTRUCTION ACTIVITY. CITY INSPECTION REQUIRED ON ALL EROSION CONTROL METHODS BEFORE OTHER WORK CAN BEGIN NOTES: 1.SURFACE WATER - ALL SURFACE WATER FLOWING OR DIVERTED TOWARD CONSTRUCTION ENTRANCES SHALL BE PIPED ACROSS THE ENTRANCE. IF PIPING IS IMPRACTICAL, A MOUNTABLE BERM WITH 5:1 SLOPES WILL BE PERMITTED. 2.MAINTENANCE - THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT OFF SITE AND/OR ONTO PUBLIC RIGHT-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL QUARRY SPALLS AS CONDITIONS DEMAND AND REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED OFF SITE AND/OR ONTO PUBLIC RIGHT-OF-WAY MUST BE REMOVED IMMEDIATELY. 3.WHEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR TO LEAVING THE SITE. WHEN WASHING IS USED, IT SHALL BE DONE ON AN AREA STABILIZED WITH QUARRY SPALLS AND WHICH DRAINS INTO AN APPROVED SEDIMENT TRAPPING DEVICE. 4.INSPECTION AND NEEDED MAINTENANCE SHALL BE PROVIDED AFTER EACH RAIN. DETAIL NOTES: THE MINIMUM LENGTH SHALL BE EXTENDED AS NECESSARY TO ENSURE MATERIAL IS NOT TRACKED OFF SITE AND/OR INTO THE PUBLIC RIGHT-OF-WAY. ATB DRIVEWAY RAMP AND/OR SITE ACCESS ROAD 15' WIDE MIN. SEE TABLE BELOW FOR REQUIRED LENGTH.2 ROA D W A Y (L F - S E E T A B L E ) 1 PROJECT SIZE < 1 ACRE < 1/4 ACRE < 3 ACRE 50 > 3 ACRE 30 100 100 15' MIN PROVIDE FULL WIDTH OF INGRESS/EGRESS *PROVIDE ATB OR ASPHALT TRANSITION WHERE FRONTAGE ROAD IS AN ARTERIAL. LENGTH TO BE DETERMINED BY CITY INSPECTOR. MIN LENGTH OF (FEET) QUARRY SPALLS* FILTER FABRIC FENCE FILTRATION SYSTEM STABILIZED CONSTRUCTION ENTRANCE DESIGNED: SCALE: CHECKED: DRAWN: DATE:SHEET JOB NO. OF BY DESCRIPTIONDATENO. PLOT DATE: DRAWING 19019 36th Avenue West, Suite E |Lynnwood, WA 98036 PH: (425) 582-9928 | Fax: (425) 582-9930 | www.zippergeo.com SUBMITTAL RECORD 5/23/19 LAST EDIT:Rob Z:\Projects\2051 - 2100\2078.01 Sajec Wall\Working File\Drafting\2078.01 Plan Set (REV 2).dwg RAR1/22/19-INITIAL RELEASE FOR PERMIT 10 SAJEC RESIDENCE RETAINING WALLS 19213 OLYMPIC VIEW DRIVE EDMONDS, WASHINGTON1/22/19 2078.01 RAR RMS/RAR RMS/RAR 5/23/19 RAR3/26/191 REVISED GRADES & STORM CONNECTION PER CITY OF EDMONDS REVIEW COMMENTS RAR3/27/192 REVISED SHT. C1.0 PER. ENGINEERING REVIEW COMMENTS 2 RAR5/23/193 REVISED TO SINGLE WALL PER OWNER REQUEST NOT TO SCALE NOTES: 1.CONTRACTOR/DEVELOPER SHALL MAINTAIN THIS APPLICATION AT ALL TIMES DURING CONSTRUCTION PERIOD. 2.ANY SEDIMENT IN CATCH BASIN INSERT SHALL BE REMOVED WHEN INSERT IS ONE-THIRD FULL. 3.CITY INSPECTION REQUIRED ON ALL EROSION CONTROL METHODS BEFORE OTHER WORK CAN BEGIN. NOTES: 1.COMPOST WATTLES RECOMMENDED ON SLOPES. USE STRAW WATTLES IN PAVEMENT APPLICATION. 2.ON SLOPES, INSTALL WATTLES PERPENDICULAR TO THE FLOW DIRECTION AND PARALLEL TO THE SLOPE CONTOURS. INSTALLATION SHALL BE IN ACCORDANCE WITH WSDOT STANDARD SPECIFICATION 8-01.3(10). 3.RUNOFF SHALL NOT RUN UNDER OR AROUND ROLL. ADDITIONAL STAKING MAY BE NECESSARY TO PREVENT UNDERCUTTING. 4.WATTLES SHALL BE INSPECTED REGULARLY, AND IMMEDIATELY AFTER A RAINFALL PRODUCES RUNOFF. REMOVE SEDIMENT AND ACCUMULATIONS WHEN EXCEEDING 1/2 HEIGHT BETWEEN THE TOP OF THE WATTLE AND THE GROUND SURFACE. SLOPE 2H:1V 3H:1V 1H:1V 10'-0" 30'-0" 20'-0" MAXIMUM SPACING 4H:1V 40'-0" 8" DIAMETER WATTLE SPACING TABLE WATTLE DETAIL PLAN VIEW 3" MIN 4" MAX 8" DIAMETER MIN 2" MIN 5" MAX 12 " M I N SPACING VARIES SEE WATTLE SPACING TABLE (TYP) SECTION A-A WATTLE INSTALLATION ON SLOPES LEN G T H V A R I E S SPA C I N G 36" O . C . 12" M I N OVE R L A P (TY P ) F L O W F L O W >4H:1V ONE RUN ONLY TEMPORARY SEDIMENT TRAP FOR CATCH BASINS WATTLE INSTALLATION (TYP. USE AS NEEDED) DESIGNED: SCALE: CHECKED: DRAWN: DATE:SHEET JOB NO. OF BY DESCRIPTIONDATENO. PLOT DATE: DRAWING 19019 36th Avenue West, Suite E |Lynnwood, WA 98036 PH: (425) 582-9928 | Fax: (425) 582-9930 | www.zippergeo.com SUBMITTAL RECORD 5/23/19 LAST EDIT:Rob Z:\Projects\2051 - 2100\2078.01 Sajec Wall\Working File\Drafting\2078.01 Plan Set (REV 2).dwg RAR1/22/19-INITIAL RELEASE FOR PERMIT 10 SAJEC RESIDENCE RETAINING WALLS 19213 OLYMPIC VIEW DRIVE EDMONDS, WASHINGTON1/22/19 2078.01 RAR RMS/RAR RMS/RAR 5/23/19 RAR3/26/191 REVISED GRADES & STORM CONNECTION PER CITY OF EDMONDS REVIEW COMMENTS RAR3/27/192 REVISED SHT. C1.0 PER. ENGINEERING REVIEW COMMENTS 2 RAR5/23/193 REVISED TO SINGLE WALL PER OWNER REQUEST NOT TO SCALE PART 1: GENERAL SUMMARY 1.WORK SHALL CONSIST OF FURNISHING ALL MATERIALS, LABOR, EQUIPMENT, AND SUPERVISION FOR CONSTRUCTION OF STRUCTURAL EARTH RETAINING WALL (SEW) SYSTEMS IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS AND WITHIN THE SPECIFIED TOLERANCES FOR THE LINES, GRADES, DESIGN AND DIMENSIONS SHOWN ON THE DRAWINGS. WORK SHALL ALSO BE IN ACCORDANCE WITH THE CONTRACT CIVIL ENGINEERING DRAWINGS AND SPECIFICATIONS. 2.WHERE REFERENCED, "STANDARD SPECS" REFERS TO THE 2016 EDITION OF THE WSDOT STANDARD SPECIFICATIONS FOR ROAD, BRIDGE, AND MUNICIPAL CONSTRUCTION. PART 2: MATERIALS CONCRETE SEGMENTAL RETAINING WALL UNITS 1.CONCRETE SEGMENTAL RETAINING WALL UNITS SHALL BE AS SHOWN ON THESE PLANS. NO SUBSTITUTIONS ARE ALLOWED. GEOGRID REINFORCEMENT 1.GEOGRID REINFORCEMENT SHALL BE AS SHOWN ON THESE PLANS. NO SUBSTITUTIONS ARE ALLOWED. GEOTEXTILE FILTER FABRIC 1.IF SPECIFIED ON THE PLANS, GEOTEXTILE FILTER FABRIC SHALL CONSIST OF WSDOT GEOTEXTILE FOR UNDERGROUND DRAINAGE, MODERATE SURVIVABILITY, CLASS A PER THE STANDARD SPECS. BACKFILL 1.REINFORCED BACKFILL SHALL MEET THE REQUIREMENTS FOR COMMON BORROW, OPTION 2 AS SPECIFIED IN SECTION 9-03.14(3) OF THE STANDARD SPECS. 2.RETAINED SOIL SHALL MEET THE REQUIREMENTS FOR COMMON BORROW, OPTION 2 AS SPECIFIED IN SECTION 9-03.14(3) OF THE STANDARD SPECS OR BETTER. 3.LEVELING PAD AND DRAINAGE MATERIAL SHALL MEET THE REQUIREMENTS FOR CRUSHED SURFACING TOP COURSE AS SPECIFIED IN SECTION 9-03.9(3) OF THE STANDARD SPECS. PART 3: DESIGN CRITERIA DESIGN PARAMETERS: 1.DESIGN OF SEWs FOR THIS PROJECT ARE BASED ON THE FOLLOWING UNFACTORED PARAMETERS BASED ON THE CONDITIONS DESCRIBED IN THE GEOTECHNICAL ENGINEERING REPORT BY ZGA, DATED NOVEMBER 20 2018: PART 4: EXECUTION CONT. EXCAVATION 1.THE CONTRACTOR SHALL EXCAVATE TO THE LINES AND GRADES REQUIRED FOR CONSTRUCTION OF THE WALLS AS SHOWN ON THE DESIGN DRAWINGS. 2.TEMPORARY EXCAVATION STABILITY SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 3.SLOPING GROUND SHALL BE TERRACED IN ACCORDANCE WITH WSDOT 2-03.3(14) PRIOR TO PLACEMENT OF FILL. FOUNDATION PREPARATION 1.PRIOR TO CONSTRUCTION OF SEWs, THE CONTRACTOR SHALL CLEAR AND GRUB THE REINFORCED FILL ZONE AND BLOCK SUBGRADE AREAS, REMOVING TOPSOIL, BRUSH, SOD, OR OTHER ORGANIC OR DELETERIOUS MATERIALS. 2.FOLLOWING EXCAVATION FOR THE REINFORCED SOIL ZONE AREA AND BLOCK SUBGRADE, A QUALIFIED GEOTECHNICAL ENGINEER SHALL BE PROVIDED AN OPPORTUNITY TO OBSERVE FOUNDATION SUBGRADE CONDITIONS. FOUNDATION SUBGRADE CONDITIONS SHALL BE COMMENSURATE WITH THE DESIGN PARAMETERS STATED IN PART 3, DESIGN CRITERIA. 3.ANY SOFT OR UNSUITABLE AREAS IDENTIFIED DURING SUBGRADE OBSERVATION SHALL BE EXCAVATED AND REPLACED OR STABILIZED AS RECOMMENDED BY THE QUALIFIED GEOTECHNICAL ENGINEER AND APPROVED BY ZGA. 4.LEVELING PAD SHALL BE LEVEL BOTH PARALLEL AND PERPENDICULAR TO WALL ALIGNMENT TO ENSURE THE FIRST COURSE OF UNITS ARE LEVEL. SEW & GEOGRID REINFORCEMENT PLACEMENT 1.ALL GEOGRID REINFORCEMENT SHALL BE INSTALLED AT THE PROPER ELEVATION AND ORIENTATION AS SHOWN ON THESE PLANS. 2.OVERLAP OF ADJACENT STRIPS OF THE GEOGRID, IN THE DESIGN STRENGTH DIRECTION, SHALL NOT BE PERMITTED EXCEPT IN CORNERS WHERE UNAVOIDABLE. THE DESIGN STRENGTH DIRECTION IS THAT LENGTH OF GEOGRID REINFORCEMENT PERPENDICULAR TO THE WALL FACE AND SHALL CONSIST OF ONE CONTINUOUS PIECE OF MATERIAL. 3.ADJACENT SECTIONS OF GEOGRID SHALL BE PLACED IN A MANNER TO ASSURE THAT THE HORIZONTAL COVERAGE IS 100%. 4.GEOGRID REINFORCEMENT SHALL BE INSTALLED UNDER TENSION. A NOMINAL TENSION SHALL BE APPLIED TO THE REINFORCEMENT AND MAINTAINED BY STAPLES, STAKES, AND/OR HAND TENSIONING UNTIL THE REINFORCEMENT HAS BEEN COVERED BY AT LEAST 6 INCHES OF SOIL FILL. 5.THE CONSTRUCTION TOLERANCES SHALL MEET THE REQUIREMENTS OF SECTION 6-13 OF THE STANDARD SPECS. 6.BROKEN, CHIPPED, STAINED, OR OTHERWISE DAMAGED UNITS SHALL NOT BE PLACED IN THE WALL. SOIL PROPERTIES REINF. BACKFILL RETAINED SOIL FOUNDATION SOIL UNIT WEIGHT (PCF)130 120 130 FRICTION ANGLE (DEG)34 32 36 COHESION (PSF)0 0 0 PART 4: EXECUTION CONT. QUALITY CONTROL (CONTINUED) 2.THE ABOVE FIELD INSPECTION AND TESTING WILL NOT RELIEVE THE CONTRACTOR OF THEIR RESPONSIBILITY TO MEET THE MORE STRINGENT OF THE DESIGN DRAWINGS, MANUFACTURER'S REQUIREMENTS AND THE PROJECT SPECIFICATIONS. PART 5: SPECIAL DESIGN PROVISIONS 1.THE DESIGN PRESENTED HEREIN IS BASED ON SOIL CONDITIONS DESCRIBED IN THE GEOTECHNICAL ENGINEERING REPORT BY ZGA, DATED NOVEMBER 20, 2018 . A QUALIFIED GEOTECHNICAL ENGINEER SHALL EVALUATE BLOCK AND REINFORCED FILL SUBGRADE CONDITIONS PRIOR TO PLACEMENT OF THE CRUSHED ROCK LEVELING PADS TO VERIFY FOUNDATION AND RETAINED SOIL PROPERTIES MEET OR EXCEED THOSE ASSUMED FOR THIS DESIGN. 2.IF SITE CONDITIONS OR DESIGN PARAMETERS ARE DIFFERENT THAN WHAT HAS BEEN PRESENTED HEREIN, ZGA SHALL BE CONTACTED IMMEDIATELY TO ASSESS THE NEED FOR DESIGN REVISIONS. 3.ANY REVISIONS TO DESIGN PARAMETERS STATED HEREIN OR STRUCTURE GEOMETRY SHALL REQUIRE DESIGN MODIFICATIONS BY ZGA PRIOR TO PROCEEDING WITH CONSTRUCTION. PART 3: DESIGN CRITERIA (CONT.) SURCHARGE LOADING 1.PEDESTRIAN HANDRAIL SURCHARGE LOAD OF 50 PLF AT TOP REINFORCEMENT LAYER AND 50 PSF PEDESTRIAN LIVE LOAD ON UPPER WALL. LRFD LOAD AND RESISTANCE FACTORS 1.SEWs FOR THIS PROJECT HAVE BEEN DESIGNED IN ACCORDANCE WITH AASHTO LRFD METHODOLOGIES FOR REINFORCED WALLS USING THE COMPUTER PROGRAM MSEW USING THE FOLLOWING LOAD / RESISTANCE FACTORS (LRFD) AND FACTORS OF SAFETY (ASD): LRFD LOAD FACTORS FOR REINFORCED WALLS: INTERNAL STABILITY FACTOR VERTICAL EARTH PRESSURE (EV)1.35 LOCAL EXTERNAL STABILITY FACTOR INTERNAL VERTICAL EARTH STATIC SLIDE & ECCEN.1.0 STATIC BEARING CAP. 1.35 EXTERNAL EARTH PRESSURES ACTIVE LATERAL EARTH 1.5 LIVE LOAD SURCHARGE 1.75 DEAD LOAD SURCHARGE 1.5 LRFD RESISTANCE FACTORS FOR REINFORCED WALLS: INTERNAL STABILITY STATIC GEOGRID STRENGTH: 0.9 GEOGRID PULLOUT: 0.9 CONNECTION: 0.9 LOCAL EXTERNAL REINF./FND. SOIL SLIDE 0.9 REINF. SOIL/REINF. SLIDE 0.9 BEARING CAPACITY 0.65 HYDROSTATIC DESIGN 1.WALLS ASSUMED TO BE FULLY DRAINED, NO HYDROSTATIC PRESSURES. DRAINAGE 1.SURFACE AND SUBSURFACE WATER SHALL BE COLLECTED AND DIVERTED AWAY FROM WALLS DURING AND AFTER CONSTRUCTION. PART 4: EXECUTION VERIFICATION OF EXISTING SITE CONDITIONS 1.THE CONTRACTOR SHALL VERIFY ON-SITE GRADES AND EXISTING SITE CONDITIONS PRIOR TO CONSTRUCTION. THE OWNER, THE OWNER'S ENGINEER, AND WALL DESIGN ENGINEER SHALL IMMEDIATELY BE NOTIFIED OF PRE-EXISTING SURFACE OR SUBSURFACE CONDITIONS DIFFERING FROM THOSE INDICATED IN THE PLANS, OR CONDITIONS OR SOIL PROPERTIES OF AN UNUSUAL NATURE, DIFFERING MATERIALLY FROM THOSE SHOWN AND GENERALLY RECOGNIZED AS INHERENT IN WORK OF THE CHARACTER PROVIDED FOR IN THESE PLANS. PART 4: EXECUTION CONT. UTILITIES WITHIN REINFORCED FILL ZONE 1.CONSTRUCTION OF UTILITIES OR STRUCTURES THAT LIE WITHIN THE REINFORCED ZONE SUCH AS PEDESTRIAN HAND RAILS SHALL BE COORDINATED WITH WALL CONSTRUCTION. EXCAVATION INTO THE REINFORCED ZONE FOLLOWING WALL CONSTRUCTION SHALL NOT BE PERMITTED. ANY DAMAGE CAUSED FOLLOWING COMPLETION OF THE WALL SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER AND OWNER'S ENGINEER AND SHALL BE IMMEDIATELY CORRECTED. FILL PLACEMENT 1.ALL BACKFILL SHALL BE PLACED IN LIFTS NOT EXCEEDING 12-INCHES IN LOOSE THICKNESS EXCEPT AS NOTED HEREIN. 2.ONLY HAND OPERATED COMPACTION EQUIPMENT SHALL BE ALLOWED WITHIN 3 FEET FROM THE BACK OF THE UNITS. FILL COMPACTED WITH HAND OPERATED EQUIPMENT SHALL BE PLACED IN LIFTS NOT EXCEEDING 8 INCHES IN LOOSE THICKNESS. ACCEPTANCE OF FILL COMPACTION WITHIN 3 FEET FROM BACK OF UNITS SHALL BE BASED ON VISUAL CONFIRMATION OF AT LEAST 3 PASSES OF COMPACTION EQUIPMENT. DENSITY TESTING SHALL NOT PERFORMED WITHIN 3 FEET FROM BACK OF UNITS. 3.FILL SHALL BE PLACED, SPREAD, AND COMPACTED IN SUCH A MANNER THAT ELIMINATES THE DEVELOPMENT OF WRINKLES OR MOVEMENT OF THE GEOGRID REINFORCEMENT AND THE SEW FACING UNITS. 4.EACH LIFT OF FILL SHALL BE COMPACTED TO AT LEAST 95% OF THE MAXIMUM DRY DENSITY AS DETERMINED BY THE ASTM D1557 TEST METHOD. 5.TRACKED CONSTRUCTION EQUIPMENT SHALL NOT BE OPERATED DIRECTLY ON THE GEOGRID REINFORCEMENT. A MINIMUM FILL THICKNESS OF 6 INCHES IS REQUIRED PRIOR TO OPERATION OF TRACKED VEHICLES OVER THE GEOGRID REINFORCEMENT. TURNING OF TRACKED VEHICLES SHOULD BE KEPT TO A MINIMUM TO PREVENT DISPLACING THE FILL AND DAMAGING OR MOVING THE GEOGRID REINFORCEMENT. 6.RUBBER-TIRED EQUIPMENT MAY PASS OVER THE GEOGRID REINFORCEMENT, IF PERMITTED BY THE MANUFACTURER, AT SLOW SPEEDS (LESS THAN 10 MPH). SUDDEN BRAKING AND SHARP TURNING SHALL BE AVOIDED. 7.AT THE END OF EACH DAY'S OPERATION, THE CONTRACTOR SHALL SLOPE THE FILL AWAY FROM THE WALL FACING TO DIRECT RUNOFF AWAY FROM THE WALL FACE. IN ADDITION, THE CONTRACTOR SHALL NOT ALLOW SURFACE RUNOFF FROM ADJACENT AREAS TO ENTER THE WALL CONSTRUCTION SITE. QUALITY CONTROL 1.THE OWNER SHALL APPOINT A GEOTECHNICAL ENGINEERING FIRM TO PERFORM INSPECTION AND TESTING, WHICH WOULD INCLUDE: 1.1.FOUNDATION: EVALUATION OF SUBGRADES FOR FILL AND SEW UNIT PLACEMENT; 1.2.FILL PLACEMENT: COMPACTION TESTING OF BACKFILL; 1.3.SEW UNIT AND GEOGRID REINFORCEMENT PLACEMENT: EVALUATION OF MATERIALS AND PLACEMENT; AND 1.4.BACKFILLS AND PIPES: EVALUATION OF MATERIALS FOR SUITABILITY AND PLACEMENT. DESIGNED: SCALE: CHECKED: DRAWN: DATE:SHEET JOB NO. OF BY DESCRIPTIONDATENO. PLOT DATE: DRAWING 19019 36th Avenue West, Suite E |Lynnwood, WA 98036 PH: (425) 582-9928 | Fax: (425) 582-9930 | www.zippergeo.com SUBMITTAL RECORD 5/23/19 LAST EDIT:Rob Z:\Projects\2051 - 2100\2078.01 Sajec Wall\Working File\Drafting\2078.01 Plan Set (REV 2).dwg RAR1/22/19-INITIAL RELEASE FOR PERMIT 10 SAJEC RESIDENCE RETAINING WALLS 19213 OLYMPIC VIEW DRIVE EDMONDS, WASHINGTON1/22/19 2078.01 RAR RMS/RAR RMS/RAR 5/23/19 RAR3/26/191 REVISED GRADES & STORM CONNECTION PER CITY OF EDMONDS REVIEW COMMENTS RAR3/27/192 REVISED SHT. C1.0 PER. ENGINEERING REVIEW COMMENTS 2 RAR5/23/193 REVISED TO SINGLE WALL PER OWNER REQUEST AS SHOWN END WALL STA 1+29.2 PROTECT AND REPLACE ADDRESS SIGN ANGLE POINT STA 1+10.9 SD WALL DRAIN. CONNECT TO NEW TYPE 1. CB PER SHT. C1.0 STA. 1+02.6. PROVIDE 2' MIN. COVER SD SD SD SD SD SD SD SD BEGIN WALL. STA. 0+00 ANGLE POINT STA. 0+34 ANGLE POINT STA. 0+42.7 0+00 0+ 5 0 1+ 0 0 SD SD SD RETAINING WALL PLAN & ELEVATION VIEW (BACK FACE OF WALL) 145 150 155 0+00 140 0+20 0+40 0+60 145 150 155 140 0+80 1+00 160160 1+20 DIST.= 0.00 ELEV.= 56.67 DIST.= 113.67 ELEV.= 150.67 DIST.= 119.63 ELEV.= 153.33 DIST.= 124.68 ELEV.= 156.67 DIST.= 0.00 ELEV.= 153.33 DIST.= 4.50 ELEV.= 152.67 DIST.= 9.00 ELEV.= 152.00 DIST.= 13.50 ELEV.= 151.33 DIST.= 19.50 ELEV.= 150.00 DIST.= 25.50 ELEV.= 148.00 DIST.= 30.00 ELEV.= 146.00 DIST.= 45.00 ELEV.= 145.33 DIST.= 49.50 ELEV.= 144.67 DIST.= 114.00 ELEV.= 146.00 DIST.= 117.00 ELEV.= 147.33 DIST.= 121.50 ELEV.= 149.33 DIST.= 124.50 ELEV.= 151.33 DIST.= 127.50 ELEV.= 153.33 DIST.= 129.00 ELEV.= 156.67 FINISH GROUND LINE AT BASE OF WALL - EXISTING GRADE EXISTING GROUND SURFACE FINISH GROUND LINE AT TOP OF WALL GEOWALL 8" CAP UNITS (TYP.) GEOWALL PRO 8" BLOCK UNITS (TYP.) STRATAGRID SG350 GEOGRID. EXTEND TO TEMP CUT REQ. TO CONSTRUCT WALL (TYP.) SD SD SD S D SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD WALL DRAIN. CONNECT TO EXST. CB. PER SHT. C1.0. STA. 1+00 INVT. ELEV. = 144.83 DIST.= 11.25 ELEV.= 156.00 DIST.= 16.66 ELEV.= 155.33 DIST.= 22.61 ELEV.= 154.67 DIST.= 32.67 ELEV.= 151.33 DIST.= 62.66 ELEV.= 150.67 DIST.= 71.31 ELEV.= 150.00 DESIGNED: SCALE: CHECKED: DRAWN: DATE:SHEET JOB NO. OF BY DESCRIPTIONDATENO. PLOT DATE: DRAWING 19019 36th Avenue West, Suite E |Lynnwood, WA 98036 PH: (425) 582-9928 | Fax: (425) 582-9930 | www.zippergeo.com SUBMITTAL RECORD 5/23/19 LAST EDIT:Rob Z:\Projects\2051 - 2100\2078.01 Sajec Wall\Working File\Drafting\2078.01 Plan Set (REV 2).dwg RAR1/22/19-INITIAL RELEASE FOR PERMIT 10 SAJEC RESIDENCE RETAINING WALLS 19213 OLYMPIC VIEW DRIVE EDMONDS, WASHINGTON1/22/19 2078.01 RAR RMS/RAR RMS/RAR 5/23/19 RAR3/26/191 REVISED GRADES & STORM CONNECTION PER CITY OF EDMONDS REVIEW COMMENTS RAR3/27/192 REVISED SHT. C1.0 PER. ENGINEERING REVIEW COMMENTS 2 RAR5/23/193 REVISED TO SINGLE WALL PER OWNER REQUEST AS SHOWN APPROXIAMTE SCALE IN FEET 0 5 1010 (HORIZONTAL) SCALE IN FEET 0 1515 (PLAN VIEW) ELEVATION VIEW GENERAL NOTES: 1.SEE COVER SHEET FOR OVERALL PLAN VIEW. 2.LEVELING PAD GRAVEL NOT SHOWN IN ELEVATION VIEWS. 3.SEE SHEETS RW3.0 - RW3.2 FOR DETAILS AND SECTIONS. 4.INTERPOLATE BETWEEN SHOWN WALL ELEVATIONS. ELEVATION VIEW SCALE IN FEET 0 510 (VERTICAL) 2 UNIT DETAILS (TYP.) NOT TO SCALE GEOGRID IS TO BE PLACED ON LEVEL BACKFILL AND EXTENDED OVER THE FIBERGLASS PINS. GRID SHALL BE HELD IN PLACE UNDER NOMINAL TENSION TO ELIMINATE SLACK. St r e n g t h D i r e c t i o n GEOGRID-BLOCK CONNECTION (TYP.) NOT TO SCALE CORE FILL DETAIL NOT TO SCALE Cap Unit Elevation Cap Unit Plan GEOWALL CAP UNITS 8" 4" 10" 18" 12" 18" PLAN VIEW CRUSHED ROCK LEVELING PAD MATERIAL (TYP.) DRAINAGE AGGREGATE 12" MIN. *(2:$//352%/2&.81,76:,7+ƒ BATTER (TYP.) FILL HOLLOW CORE OF UNITS WITH LEVELING PAD MATERIAL. SEE DETAIL 3, THIS SHEET. GEOWALL 8" CAP UNIT. ADHERE TO TOP BLOCK PER MANUFACTURER'S RECOMMENDATIONS (TYP.) FINISHED GRADE AT BOTTOM OF WALL. SEE ELEVATION VIEW, SHEET RW2.0 (TYP.). BOTTOM OF WALL. SEE ELEVATION VIEW, SHEET RW2.0 (TYP.) TOP OF WALL. SEE ELEVATION VIEW, SHEET RW2.0. (TYP.) COMPACTED CRUSHED ROCK LEVELING PAD. SEE DETAILS 1, SHT. RTW3.1. 4" DIA. PERFORATED DRAINAGE PIPE WRAPPED IN FILTER SOCK AND SLOPED TO DRAIN. SEE ELEVATION VIEW. CONNECT TO NEW CB PER SHEET C1.0 STRATAGRID SG350 GEOGRID REINFORCEMENT. EXTEND TO TEMPORARY CUT FACE (TYP.) 6' MIN. TEMPORARY CUT REQUIRED FOR CONSTRUCTION / LIMITS OF REINFORCED FILL FINISHED GRADE AT TOP OF WALL. SEE ELEVATION VIEWS (TYP.) PEDESTRIAN BARRIER (TYPE BY OWNER) SEE DETAIL 4, SHT. RTW3.1 FOR POST INSTALLATION 42" MIN. 12" MIN. DRAINAGE AGGREGATE (TYP.)WALL BACKFILL WALL BACKFILL UPON COMPLETION OF GRADING, INSTALL ECBVERDYOL C32 B LONG TERM EROSION CONTROL BLANKET (ECB) ON SLOPE AND PLANT WITH DROUGHT-TOLLERANT, HIGH DENSITY GROUND COVER. SEE DETAILS 4 & 5, SHT. RW3.1 FOR ECB INSTALLATION. NOTE: FOUNDATION SOILS SHALL BE EVALUATED BY ZIPPER GEO PRIOR TO CONSTRUCTION OF LEVELING PADS. BLOCK WALL TYPICAL SECTION NOT TO SCALE EXISTING GROUND SURFACE (TYP.) DESIGNED: SCALE: CHECKED: DRAWN: DATE:SHEET JOB NO. OF BY DESCRIPTIONDATENO. PLOT DATE: DRAWING 19019 36th Avenue West, Suite E |Lynnwood, WA 98036 PH: (425) 582-9928 | Fax: (425) 582-9930 | www.zippergeo.com SUBMITTAL RECORD 5/23/19 LAST EDIT:Rob Z:\Projects\2051 - 2100\2078.01 Sajec Wall\Working File\Drafting\2078.01 Plan Set (REV 2).dwg RAR1/22/19-INITIAL RELEASE FOR PERMIT 10 SAJEC RESIDENCE RETAINING WALLS 19213 OLYMPIC VIEW DRIVE EDMONDS, WASHINGTON1/22/19 2078.01 RAR RMS/RAR RMS/RAR 5/23/19 RAR3/26/191 REVISED GRADES & STORM CONNECTION PER CITY OF EDMONDS REVIEW COMMENTS RAR3/27/192 REVISED SHT. C1.0 PER. ENGINEERING REVIEW COMMENTS 2 RAR5/23/193 REVISED TO SINGLE WALL PER OWNER REQUEST AS SHOWN COMPACTED CRUSHED ROCK LEVELING PAD (CRUSHED SURFACING TOP COURSE) 6" 8" 6" MIN. LEVELING PAD DETAILS NOT TO SCALE BLOCK UNIT ELEVATION VIEW TRIM BLOCK FOR PIPE PENETRATION DRY PACK GROUT AROUND PIPE PENETRATION UNDERDRAIN PIPE PENETRATION (TYP.) NOT TO SCALE ƒ COMPACTED CRUSHED ROCK LEVELING PAD (CRUSHED SURFACING TOP COURSE) 6" MIN. 24" MIN. 6" (TYP.) L PR I N C I P A L RE I N F O R C E M E N T DI R E C T I O N PRINCIPAL REINFORCEMENT DIRECTION L PLACE 3" MIN. REINFORCED FILL BETWEEN OVERLAPPING GEOGRIDS GREATER THAN 3' FROM WALL FACE (TYP.) 3' 3' NOT TO SCALE WALL FACE WALL FACE *(*25,'3/$&(0(17$72876,'(ƒ$1*/(32,17 7<3 1.Prepare soil before installing rolled erosion control products (RECPs), including any necessary application of lime, fertilizer, and seed. 2.Begin at the top of the slope by anchoring the RECPs in a 6" deep X 6" wide trench with approximately 12" of RECPs extended beyond the up-slope portion of the trench. Anchor the RECPs with a row of staples/stakes approximately 12" apart in the bottom of the trench. Backfill and compact the trench after stapling. Apply seed to the compacted soil and fold the remaining 12" portion of RECPs back over the seed and compacted soil. Secure RECPs over compacted soil with a row of staples/stakes spaced approximately 12" apart across the width of the RECPs. 3.Roll the RECPs (A) down or (B) horizontally across the slope. RECPs will unroll with appropriate side against the soil surface. All RECPs must be securely fastened to soil surface by placing staples/stakes in appropriate locations as shown in the staple pattern guide. 4.The edges of parallel RECPs must be stapled with approximately 2" - 5" overlap depending on the RECPs type. 5.Consecutive RECPs spliced down the slope must be end over end (Shingle style) with an approximate 3" overlap. Staple through overlapped area, approximately 12" apart across entire RECPs width. 2"-5" 3B 4 2 5 1 3A 12" 6" 6" 3" ANCHORAGE DEVICES SHALL CONSIST OF 12" WOOD ECO STAKES OR TL-TA1 12" TWIST PINS. INSTALL IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. NOTE: INSTALL EROSION CONTROL BLANKET, PLANTING, AND SEEDING IN ACCORDANCE WITH ECB MANUFACTURER'S RECOMMENDATIONS. NOT TO SCALE EROSION CONTROL BLANKET INSTALLATION NOT TO SCALE EROSION CONTROL BLANKET ANCHORAGE BLOCK UNIT DESIGNED: SCALE: CHECKED: DRAWN: DATE:SHEET JOB NO. OF BY DESCRIPTIONDATENO. PLOT DATE: DRAWING 19019 36th Avenue West, Suite E |Lynnwood, WA 98036 PH: (425) 582-9928 | Fax: (425) 582-9930 | www.zippergeo.com SUBMITTAL RECORD 5/23/19 LAST EDIT:Rob Z:\Projects\2051 - 2100\2078.01 Sajec Wall\Working File\Drafting\2078.01 Plan Set (REV 2).dwg RAR1/22/19-INITIAL RELEASE FOR PERMIT 10 SAJEC RESIDENCE RETAINING WALLS 19213 OLYMPIC VIEW DRIVE EDMONDS, WASHINGTON1/22/19 2078.01 RAR RMS/RAR RMS/RAR 5/23/19 RAR3/26/191 REVISED GRADES & STORM CONNECTION PER CITY OF EDMONDS REVIEW COMMENTS RAR3/27/192 REVISED SHT. C1.0 PER. ENGINEERING REVIEW COMMENTS 2 RAR5/23/193 REVISED TO SINGLE WALL PER OWNER REQUEST AS SHOWN CITY OF EDMONDS TYPE 1 CB TYPICAL DETAIL SITE SECTION A-A' 140 150 160 170 0+00 0+20 0+40 0+60 140 150 160 170 EL E V A T I O N ( F E E T ) EL E V A T I O N ( F E E T ) 130 130 EXISTING GRADE EXISTING FENCE TEMP. EXCAVATION REQUIRED FOR CONSTRUCTION EXISTING DECK PROPOSED WALL A A' GEOGRIDS (TYP.) EXTEND TO TEMPORARY EXCAVATION REQUIRED TO CONSTRUCT WALL (TYP.) NEW FENCE DESIGNED: SCALE: CHECKED: DRAWN: DATE:SHEET JOB NO. OF BY DESCRIPTIONDATENO. PLOT DATE: DRAWING 19019 36th Avenue West, Suite E |Lynnwood, WA 98036 PH: (425) 582-9928 | Fax: (425) 582-9930 | www.zippergeo.com SUBMITTAL RECORD 5/23/19 LAST EDIT:Rob Z:\Projects\2051 - 2100\2078.01 Sajec Wall\Working File\Drafting\2078.01 Plan Set (REV 2).dwg RAR1/22/19-INITIAL RELEASE FOR PERMIT 10 SAJEC RESIDENCE RETAINING WALLS 19213 OLYMPIC VIEW DRIVE EDMONDS, WASHINGTON1/22/19 2078.01 RAR RMS/RAR RMS/RAR 5/23/19 RAR3/26/191 REVISED GRADES & STORM CONNECTION PER CITY OF EDMONDS REVIEW COMMENTS RAR3/27/192 REVISED SHT. C1.0 PER. ENGINEERING REVIEW COMMENTS 2 RAR5/23/193 REVISED TO SINGLE WALL PER OWNER REQUEST AS SHOWN APPROXIAMTE SCALE IN FEET 0 5 1010