2084_001.pdf0 ß t-o t"ot\ ô6to TÏIE CATTICROIIP DAILY FIELD REPORT Permit: Address: Date: TGG Job # Client: Contractor: Field Rep: Submitted by: BLD 20190610 7415 Braemar Dr 7l3j/20te 202s-3 MirelSinclair Somerset Gardens Paul Stoltenberg Paul L Stoltenberg, P.E Project Geotechnicat f ngineer Ge¿¡tcchnical Consulting PO Box 30759 Seattle, WA 98113 206.52s.5097 Construction Operations Bearing Verification and Geogrid Placement Description of Activity: Contractor has completed subdrainage installation behind retaining walls. Contractor excavated for placing consecutive layers of geogrid in accordance with plan and geotechnical engineer recommendations. Contractor had correctly laid out the geogrid in the strength direction at the grades indicated on the plans and was reading to cover the first layer of geogrid. TGG engineer reminded contractor to place thin layer of rock between geogrid layers at corners. TGG engineer verified compaction method (3 or 4 passes with the plate compactor) on loose lifts no more ihan 4 inches to achieve the recommended compaction of the reinforced zone. Contractor has cornpaction equipment on site and began compacting lowermost geogrid layer on lower terrace. Contractor had prepared leveling course for the new wall north of the planter area at the south end of the lowerterrace. Exposed soil consisted of native, undisturbed, medium dense, silty SAND with gravel, and leveling course of 5/8"-0" crushed rock was placed to support first row of block per plan. cc: m þgi nqi ¡rç 6l com ca s!. net lgn@¡ omg rsele"AIde.¡t". c om m ilto n.th.pm p-son @ edmo ndJwa. g.ov 1"ofL 0 TIüCALTIGNüJP DA¡LY FIELD REPORT Permit: Address: Date: TGG Job # Client: Contractor: Field Rep: BLD 20190610 7415 Braemar Dr 7/261201s 2025-3 MirelSinclair Somerset Gardens Paul Stoltenberg Paul L Stoltenberg, P.E. Project Geotechnical Engineer Geotechnical Consulting PO Box 30759 Seattle, WA 981L3 206.s25.5097 Construction Operations Back Wall Subdrainage Description of Activity: Contractor has installed wall drains in general accordance with approved plans. Drains consisted of 4-inch PVC perforated pipe surrounded with clean crushed rock (Seattle Type 22,5/8" chip rock), enveloped in filter fabric. Diagram of back wall subdrains to uncompleted outlet and discharge is shown on attached figure. TGG gave OK to backfill and continue drain rock to within 18 inches of surface. TESC measures are still in place and functioning. All activity is upslope from straw wattles. Stockpiled soil excavated to place geogrids has been stockpiled against east side of the property. cc: nr bri ¡çi nç1@co m cast. nq! ken@some tsarden.com m i lton.thompson @ed n o_f dswa. gov Submitted by: b È -tc.ry. & S*o g {1\¡1, k¡ rsf I @*o rÕ.vr ""1s,ã w1 ]f"å: ¡C nnhcfüç¡t Fs#t*l {te .':ilw. !*¡-å Éô'ti: ¡å4 Ttr.lll ?gXð iÕ.w c@63 tñ1 :s À". t? ,ûs*r Tü$J EüÔS 8-{L!t â7Ê.5 Ttlw s¡ô t d 3{ # Tg.'rV- ¿*1.0 Bð,tl¿ i,:sû =¡#äTæ S*u#b *so Ìl3.Yd. w5 ffiM' f.Ú,W ã¡": å*w- *¡5 mspo* Fãtin wrd Hsnter üþlls g{ãÞ: jjJr = l'-ff åsãisç R.dtsr {'tiq{'¡ 7415 Braemar Drive Backwall Subdrainage Figure I