Loading...
2086_001.pdfsfa July 30, 2019 City of Edmonds Building Permits Planning & Public Works ATTN: Special Inspections sFl\ treslgn ErouÞ, LLtr STRUCTURAL I TEOTECHNICAL I SPECIAL INSPECTIONS PORTLAND, OR I LIVERMORE, CA I SEATTLE, WA I PALMER LAKE, CO 503.64'1.83.l I I www'sfadg.com Special Inspection F'INAL SUMMARY REPORT RE:Project Name: Project No.: Permit No.: Address: Sutherland Residence Underpinning MFR19-059 BLD20790721. 21615 84th PLw, Edmonds, WA 98026 Dear Building Inspection Division: This letter serves to certify that in accordance with Chapter 17 of the International Building Code requirements outlined in the General Structural Notes on Sl.i of the approved permit drawings, SFA Design Group, LLC has performed special inspection as detailed below. The inspector observed the installation of (B) FSI PP288 push piers, verifying pier locations, installation depth, installation pressure, bracket type, pier type, pier diameter and thickness. To confirm pier capaeily,load tests were observed following installation and the results were within approved allowances. Please see attached field installation logs and load test data dated, 0712912019 - 0713012019. All anchors were installed per the intent of the design and any installation deviations were reviewed and approved by this office with no outstanding non- compliance items. Our inspection and testing services do not constitute a warranty or guarantee of any type and were provided and intended to help reduce the risk of construction defects, deficiencies or omissions that may arise during and after construction. It is the contractor's responsibility to perform their work in accordance with the approved construction documents. A1l inspections and tests were performed and reported according to the requirements of the City Building Regulations and these Administrative Rules and, to the best of my knowledge, the work was in conformance with the applicable workmanship provisions of the State Building Code and Standards. Sincerely, Christopher Fitch Engineer Technician IV - SFA Design Group Cc: Olga Ticot, Matvey Foundation Repair Reviewed by: Jeff Fitch, PE, P.Eng, SFA Design Group, LLC EXPiRFS: 1l/21Jlt sfb SFA Design Grsu¡r, nr 5TßUSTURAL I Çrvll I cEoT[cHNtcaL I LANDUSËPLANN|NC 9010 SW WasbÍngton Sqtraß f¡rive, Su¡ts 505, Podand, Ongon 97223 l8l3 Ruþr ürlve, Sstt¿ C, Livermore, ealtfomlã 94551 1912 S 'l46th $ùuet, Sèálrle, Wæh¡ngton StEt 707 Comty.L¡ne Rü4 Ur¡¡ B, Pa¡rnsr Lâke, GO û0133 p: 503ó41*311 ww.sfadg,ærn FIELD I NSTALLATTON LOG Projea Name:Ç, t\ e-a,L*¿uti^ ¡t¡Ft¿ t ? - n E tt Contractor:/Un-lo*-"1 Site Address: Ð^ tlo I t î "/ *¿,Þfil, EÐr*r*oA," a Project Foremän:Lt/*n lnstall Date:\ /"-"t - ^l y'zo /, q Permit Number:ß¿n 2-.T t qa7a,t lnspector Afrival:9¿a I Çontractor Anival: lnspector Name:fit*zla+ kãE,u*z.)Jurisdiction:¿\b)t 7¿,ù'bç U4 Q 'ÒÕ LoçatÌon Part Descdption PierOD, in PierWall Thickness, in |"Þr ìjegment Length, fr lnstallaüon Pressure, psi ØrÐ Eç r-ls<-P.,*-/Þ ¿---þ-<- -8rre.zsq Iè¿f4 r),+c;u,-'¡I Æ-i\¡Ç¿-r¿-***+ -{-ri¡z- a'- 4- Q iç*¡ve ,\,s>ç ' ¿). iLt 2 fu* Eç* I '77-/,44 ¿'lt p'eøø ¿r3 O L n --l- ¿ 1, tl7 ¡3. &. C Jo*to /¿Ìt âa, etv/Ël-/-t-4- I %.1./â,'/t !(àtOarò rfe e +teo t="¡., f)t< e- fr* €J:--,,-l¿¿r (øø Þu* I -7n1o+/ t-'f(7ec-Ò rÊñ (*r+¡t--l*¿ fufZ¿ -:,r r( | ee;tJ*IL t (*a a Èx1 I T,r/-'/ ¿'â-aa ø Æ\5-fz4n-ç- n- -*"the *' 9 loou*1¿å e,ci al+*/- ¿rè-¿J I ,T å)-Ð û() /-h"t Þr\ç .J-ê'îrJ*'rI *.rÞ + q Jo*-¡¿,r êðù\--/Þ-** I 1¿,/gcv <t: È-x-l7*Ha/)'/)o c> C: /trÈ S+,+lv/-¿z *¿Ì..p cÉ-- q f*e>uc,1-,Ò c)\;/Þ-*1 'l -7" +ro.l /. '2a*ø 1Ãè -Ç+'tæ--/*'x lu\u q- 9l.o,tu ,/Øol-/'v*.1 t Tp-tul L '¿/åL¿, ãe lnspector Non-Compliance ltems: ,4 LL þ,t*s */** L tr+ sfä sFA EesÍgn Eroup, lrr STRUCTURÁL I CIVIL I GÊOTECHNICAL I LAND USE PLANNING 9020 SW Washlngton Square ltrive, Su¡te s05, PoIüand, tregon gi2ZJ 1813 Rutan Drlve, Sulte C, Uvêrfforè, Cqlifornla 945gi 1912 S 146th Street, Seattle, Washington 98168 707 County Line Road, Un¡t B, palmer Lake, CO B0.l3g p: 503.641,ütl1 w,sfadg.com LOAD TEST LOG Projecl Name:Coûlractor: Site Address: .t Project Foreman: Test Date:Permit Number:Õ lnspector Name:Jurisdiction:u g doo() {Ðî.., c) 'Þ a o o a Test Load, kips: Working Load, kips: .¡1-f^r+f TestPres$ure, psi: Total Creep, in: 1 min: 2 min: 3 min: 4 min: 15 min: 20 min: 30 min: 40 min: 50 minl 60 min: 5 min: ô min: 10 min: PierTested: tr .5 cioo o E) o ö ö V) 10 min: Pier Tested: Working Load, kips: Test Pressure, psi: Total Creep, in: I min: 2min:. 3 mín: 4 min: 15 mÍn: 20 min: 30 mln: 40 min: 50 min: 60 min: Tes-t Load, kips: 5 min: A 6 min:€) Cont¡nuous special inspection is required during instôllation per 2015 IBC section 1810.4.12. Load tesiing shall be performed in accordance with ASTM Method D1143 (Qu¡ck Method). 20 percent of piers shall be tested to 150 percent of design load. Load tes'ting creep acceptance criteria shall be no greatêr than 0-04 inches within a 10 rninute period. lf movement is observed greater than 0.04 inches within the 10 minr.¡te period the loâd tesl shall be held for an ãdd¡tionål S0 m¡nutes, the pier is to be deepened and re-tested, or the pîer is to be abandoned and replaced with a new pier, lf thê load test is to be held the pier movemênts shâll be measured at 15, 20,30, 40, 50, and 60 minutes. The creep versus the logarithm of r¡me shall be plotted- lf the creep rate ís less than 0.080 inches between 6 and 60 minutes, the load test shatl be considered successful. Note: Load test performed util¡zes a hydraulic |oad with an effec-t¡ve bore diameter of 3.5,'which equâtes to an opêrâting hydräut¡c areã of 9_62 in2, Piêr Test Pressure (ps¡)= [Des¡gn Load] X 1.S / 9.62in2 lnspector Items: