2092_001.pdfMAYES TESTING ENGINEERS., INC July 8, 2019 A Irerracan COMPANY Joe Lucia Lucia Engineering 7037 12th Ave NE Seattle, WA 98115-5619 R& QC 18109 & 18111 84th Avenue Anchor Load Testing Mayes Testinq Ennineers Project Number M7181727 Dear Mr. Luci& Seade Office 20225 CedaVdEy Road suibllo Lynrwood, WA 98036 ph 425 742 9360 fax425745.1737 Tacorm Offloe 10029S TaccmaWay SLAe E-2 Taccmc� WA 98499 ph 253 584 3720 faxm58437w PordwdCffice 7911 NE 33rd DNe Sut 190 Pordald. OR 97211 ph 503 2817515 fax 503 2817579 As requested, on June 27, 2019, Mayes Testing Engineers performed load testing of hold-down anchors at the above referenced project at 18111 84th Avenue West in Seattle, Washington. Background The Residence at 18111 84th Avenue West is currently under construction. Part of the construction includes the use Simpson Strong -Tie HD713 and HD12 hold-downs for seismic and wind loads. We understand that these anchors did not receive inspection during their installation. Thus, load testing of the anchors was required for permissible use. Test Procedures There were approximately eight H D713 and eight HD12 anchors installed; two of each (approximately 25%) were selected for testing in -A. conjunction with the contractor based on accessibility. The test load was applied via a calibrated Enerpac RCH-302 thru-hole hydraulic ram and digital gauge assembly (shown right). In accordance with ASTM E3121 load testing procedures, we also used a reaction beam to distribute the load away from the substrate in which a failure cone could develop. We understand the HD713 anchors prescribed a test load of 5,600 pounds -force (lb-f), while the HD12 anchors were prescribed a test load of 20,000 lb-f. All anchors were tested at their prescribed loads for 5 minutes or until failure, whichever came first. big Anchor Load Testing Setup Test Results All anchors tested held their required loads for the minimum 5-minute duration without failure or indication of overstress. The general locations of the tested anchors are shown on the attached plan. We trust this provides you with the information you require at this time. Respectfully Submitted, MAYES TESTING ENGINEERS %Michadel E. Tho pson Field Engineer Encl- Anchor Testing Locations � (1�' tuart J. Ca r, P. E. Special Projects Manager MAYES TESTING ENGWEERS, INC. QC 18109 & 18111 84th Ave Anchor Testing Locations Mayes Testing Engineers Project Number M7181727 F#—] = HD7B Anchor Test F#J = HD12 Anchor Test UL C-11 I A. ENTRY 'wr 4 f:Ll �T-] L-b�T-T Vi LL *-- 4— stl I 5-w 11WA :W RFW.'A �*wrm)w� ix LENT. 5�- Impy Iwv IN �LED E`wA t"', �AVE LWOR UH as �z 4% FF/ w ARE FROVIC7 5TAI"� RExRD4wl5 4�, K3C' & vERI-1 MITI, Ex -AKFAcnp" jw.4ce ?mv.4-P4 7 cr %%BTu!NTAFZ DoE5Y CRMITS TAEL� 4WZ mlN5�51:LBrllm �Adm= ,EAT'R "TNeaw EF M 41 MAYES TESTING ENGINEERS, INC.