21415 80.pdfOV Eb/if 0
Al
City of Edmonds
Traffic Impact Analysis Worksheet
10'.
Name of Proposed Project:
Owner/Applicant
L-Lc-
Narne
Street/Mailing Address
t7AV.,("Os VA q507-0
city State Zip
Telephone:
Applicant Contact Person:
.�,A _ - I I I C-1 L� ; A-1
Name
F0, 3v�r, ltz-�
Street/Mailing Address
1�9 02- C,
City State Zip
Telephone: L[2-C - - 00 ;>
Traffic Engineer who prepared the Traffic Impact Analysis (if applicable):
Firm Name Contact Name
Telephone: E-mail:
THRESHOLD LEVELS OF ANALYSIS
Project Traffic Levels
Sections to Complete
1. Less than 25 peak -hour trips generated
I and 7 only (Worksheet/Checklist)
11. More than 25 peak -hour trips generated
All sections
CROJECT DESCRIPTION
)P
a. Location - Street address -2
9FO 6 Attach a vicinity map andsiteplan.)
b. Specify existing land use:
c. Specify proposed type and size of development: 6� e
A /6/� k" e (# of residential units andlor squarefootage of building)
FILE
Revised on 6124110 E82 - Trq& Impact Analysis Worksheet Page I of 5
d. Date construction will begin and be completed:
e. Define proposed access locations:
f. Define proposed sight distance at site egress locations:
2. TRIP GENERATION
Source shall be the Eighth Edition of the Institute of Transportation Engineers (ITE) Trip Generation
manual. For independent fee calculations, the current edition of the ITE manual may be used.
ADT = Average Daily Traffic
PM Peak -hour trips (AM, noon or school peak may also apply as directed by the City Engineer)
a. Existing Site Trip Generation Table:
Land Use Daily (XA"*"' PM Peak -Hour
W
Trips
OUT
b. Proposed Project Trip��eration Table:
C.
Land Use/ Daily (ADT)
PM Peak -Hour
Trips
FN
OUT
ew Project Trip Generation Table:
I PM Peak -Hour Trips
Land Use Daily (ADT) I IN I OUT
d. State assumptions and methodology for internal, link -diverted or passby trips:
Revised on 6124110 E82 - Trqf
.fic Impacl Ana�lsis Worksheel Page 2 of 5
U�TIGATION RECOMMENDATIONS
S te recommended measures and fees reauired to mitizate Droiect sDecific traffic imDacts. Traffic
impact fee shall be calculated from the Edmonds Road Impact Fee Rate Study Table 4 (attached)
and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations
in ECDC 18.82.130.
CHANGE IN USE
Fee for prior use shall be based on fee established at the time the prior use was permitted. If the
previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04),
the 2004 ECDC 18.82.120 impact fee shall be used.
Units in
ITE Land Use Category Per Unit square feet,
Fee Rate # of dwelling,
vfp, etc.
New Use $ X
Prior Use $ X
INew Use Fee: $ 7 Prior Use Fee: L$
NEW DEVELOPMENT
Units in
ITE Land Use Category Per Unit squarefieet,
Fee Rate # of dwelling,
vfp, etc.
New Use
0 OTHER
Fee
'�UA C*�IZe)lj
City of Eldmonds, Engineering Divisi , on Approval Date
' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.
Revised on 6124110 E82 - Traffic Impact Analysis Worksheet Page 5 of 5