Loading...
21417 80.pdf0,E. EnAl, 0 0 City of Edmonds Traffic Impact Analysis Worksheet oz Name of Proposed Project: 1/) 0 1 L E Owner/Applicant 1, I -Lc - Name ?C, 3�x � Z I Street/Mailing Address VA cfqozo city State Zip Telephone: Applicant Contact Person: Name Po Street/Mailing Address 119000 city State Zip Telephone: L(2,C - - 0 0 �� Traffic Engineer who prepared the Traffic Impact Analysis (if appficable): Firm Name Contact Name Telephone: E-mail: THRESHOLD LEVELS OF ANALYSIS Project Traffic Levels Sections to Complete 1. Less than 25 peak -hour trips generated I and 7 only (Worksheet/Checklist) IT. More than 25 peak -hour trips generated All sections (OPROJECT DESCRIPTION a. Location - Street address: 219 17 go W q191OU (Attach a vicinity map and site plan.) b. Specify existing land use: C, 1-r <- c. Specify proposed type and size of development: e' 0 A/ U 3. /7/, _— e _r (# of residential units andlor sqoarefootage of building) Revised on 6124110 E82 - Traffic Impact Analysis Worksheet Page I of 5 d. Date construction will begin and be completed: a e. Define proposed access 16��tions: * f. Define proposed sight distance at site egress locations: 2. TRIP GENERATION Source shall be the Eighth Edition of the Institute of Transportation Engineers (ITE) Trip Generation manual. For independent fee calculations, the current edition of the ITE manual may be used. ADT = Average Daily Traffic PM Peak -hour trips. (AM, noon or school peak may also apply as directed by the City Engineer) a. Existing Site Trip Generation Table: Land Use Daily (AX)"" ___PM Peak -Hour Trips I IN I OUT b. Proposed Project Trip G96eration Table: PM Peak -Hour Trips Land Use IN UT / I Daily (ADT) c. NetAew Project Trip Generation Table: Land Use Daily (ADT) PM Peak -Hour Trips I IN I OUT d. State assumptions and methodology for internal, link -diverted or passby trips: Revised on 6124110 E82 - TrafJic Impact A nalysis Worksheet Page 2 of 5 7. TIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the Edmonds Road Impact Fee Rate Study Table 4 (attached) and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used. ITE! Land Use Category Per Unit Fee Rate New Use $ Prior Use $ Units in square feet, # of dwelling, vfp, etc. X X New Use Fee: $ Prior Use Fee: NEW DEVELOPMENT Fcc Units in ITE Land Use Category Per Unit squarefieet, Fee Fee Rate # of dwelling, vfp, etc. New Use E OTHER MITIGATION FEE RECONEVEND ION: S INDEPENDENT FEE CALCULATION: $200.00 (+ consultant fee� $ TOTAL TRAFFIC IMWACT FEE i s I I % .331 city Division Approval Date 'No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. Revised on 6124110 E82 - Traffic Impact Analysis Worksheet Paze 5 of 5