Loading...
21419 80.pdfE ID City of Edmonds Traffic Impact Analysis Worksheet Name of Proposed Project: Ar._�,i o I co 4— 1,� Owner/Applicant Ve,-,+,_res . &Lc - Name ?a 3qk � z I Street/Mailing Address VA �_1907_0 city State Zip Applicant Contact Person: Name P0, 30N Street/Mailing Address 9�if �10 UUAI 00 C, city State zip Telephone: Telephone: L(2-C - Lt2_-z_ - C)O?;> Traffic Engineer who prepared the Traffic Impact Analysis (if appficaWe): Firm Name Contact Name Telephone: — E-mail: THRESHOLD LEVELS OF ANALYSIS - Project Traffic Levels Sections to Complete 1. Less than 25 peak -hour trips generated I and 7 only (Worksheet/Checklist) 11. More than 25 peak -hour trips generated All sections >ROJECT DESCRIPTION a. Location - Street address: Z- AVC U_/_ VO 24. (Attach a vicinity map and site plan.) b. Specify existing land use: _� /,Vz� 104��,IAele 4/ 6, c. Specify proposed type and size of development: e f (# of residential units andlor squarefootage of building) Revised on 6124110 E82 - Traffic Impact Analysis Worksheet Page I of 5 d. Date construction will begin and be completed: /Z V- e. Define proposed access lo��tions: . f Define proposed sight distance at site egress locations: 2. TRIP GENERATION Source shall be the Eighth Edition of the Institute of Transportation Engineers (ITE) Trip Generation manual. For independent fee calculations, the current edition of the ITE manual may be used. ADT = Average Daily Traffic PM Peak -hour trips. (AM, noon or school peak may alsoapply as directed by the City Engineer) a. Existing Site Trip Generation Table: Land Use b. Proposed Project Trip Land U Daily ( Table: Daily (ADT) c. NetVew Project Trip Generation Table - Land Use I Daily (ADT) PM Peak -Hour Trips IN I OUT PM Peak -Hour Trips IN I OUT PM Peak -Hour Trips IN T__0UT d. State assumptions and methodology for internal, link -diverted or passby trips: Revised on 6124110 E82 - Traffic Impact Analysis Worksheet Page 2 of 'S 7. TIGATION RECOMMENDATIONS �State re . commended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the Edmonds Road Impact Fee Rate Study Table 4 (attached) and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. El CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. if the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used. Units in ITE'Land Use Category Per Unit square feet, Fee Rate 4 of dwelling, vfp, etc. New Use $ X Prior Use $ X INew Use Fee: $ Prior Use Fee: S NEW DEVELOPMENT ITE Land Use Category Per Unit Fee Rate I New Use I -)— / 0 1 $ / / "/ 6 '1'-'X 11 OTHER City of ENT FEE CALCULA Units in squarefieet, # of dwelling, vfp, etc. + consultant fee Fee TOTAL TRAFFIC IMPACT FEE 1 $ 11 "110 - � ring Division Approval 1-t Date No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. Revised on 6124110 E82 - Traffic Impact Analysis Worksheel Page 5 of 5