21419 80.pdfE ID
City of Edmonds
Traffic Impact Analysis Worksheet
Name of Proposed Project: Ar._�,i o I co 4— 1,�
Owner/Applicant
Ve,-,+,_res . &Lc -
Name
?a 3qk � z I
Street/Mailing Address
VA �_1907_0
city State Zip
Applicant Contact Person:
Name
P0, 30N
Street/Mailing Address
9�if �10 UUAI 00 C,
city State zip
Telephone: Telephone: L(2-C - Lt2_-z_ - C)O?;>
Traffic Engineer who prepared the Traffic Impact Analysis (if appficaWe):
Firm Name Contact Name
Telephone: — E-mail:
THRESHOLD LEVELS OF ANALYSIS -
Project Traffic Levels
Sections to Complete
1. Less than 25 peak -hour trips generated
I and 7 only (Worksheet/Checklist)
11. More than 25 peak -hour trips generated
All sections
>ROJECT DESCRIPTION
a. Location - Street address: Z- AVC U_/_ VO 24.
(Attach a vicinity map and site plan.)
b. Specify existing land use: _� /,Vz� 104��,IAele 4/ 6,
c. Specify proposed type and size of development:
e f (# of residential units andlor squarefootage of building)
Revised on 6124110 E82 - Traffic Impact Analysis Worksheet Page I of 5
d. Date construction will begin and be completed: /Z V-
e. Define proposed access lo��tions: .
f Define proposed sight distance at site egress locations:
2. TRIP GENERATION
Source shall be the Eighth Edition of the Institute of Transportation Engineers (ITE) Trip Generation
manual. For independent fee calculations, the current edition of the ITE manual may be used.
ADT = Average Daily Traffic
PM Peak -hour trips. (AM, noon or school peak may alsoapply as directed by the City Engineer)
a. Existing Site Trip Generation Table:
Land Use
b. Proposed Project Trip
Land U
Daily (
Table:
Daily (ADT)
c. NetVew Project Trip Generation Table -
Land Use I Daily (ADT)
PM Peak -Hour Trips
IN I OUT
PM Peak -Hour Trips
IN I OUT
PM Peak -Hour Trips
IN T__0UT
d. State assumptions and methodology for internal, link -diverted or passby trips:
Revised on 6124110 E82 - Traffic Impact Analysis Worksheet Page 2 of 'S
7. TIGATION RECOMMENDATIONS
�State re . commended measures and fees required to mitigate project specific traffic impacts. Traffic
impact fee shall be calculated from the Edmonds Road Impact Fee Rate Study Table 4 (attached)
and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations
in ECDC 18.82.130.
El CHANGE IN USE
Fee for prior use shall be based on fee established at the time the prior use was permitted. if the
previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04),
the 2004 ECDC 18.82.120 impact fee shall be used.
Units in
ITE'Land Use Category Per Unit square feet,
Fee Rate 4 of dwelling,
vfp, etc.
New Use $ X
Prior Use $ X
INew Use Fee: $ Prior Use Fee: S
NEW DEVELOPMENT
ITE Land Use Category
Per Unit
Fee Rate
I New Use I -)— / 0 1 $ / / "/ 6 '1'-'X
11 OTHER
City of
ENT FEE CALCULA
Units in
squarefieet,
# of dwelling,
vfp, etc.
+ consultant fee
Fee
TOTAL TRAFFIC IMPACT FEE 1 $ 11 "110 - �
ring Division Approval
1-t
Date
No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.
Revised on 6124110 E82 - Traffic Impact Analysis Worksheel Page 5 of 5