Loading...
2161_001.pdfHKK SOtJl.lD STAIJCTIJRÂL SûIIJTTOI'|S gNGTNËERS August 23,2019 To: Kevin Bloomfield, Plans Examiner From: Kuftis Chivens, EIT Re 8311 Talbot Road SFR, Interior Remodel SSS# s1905029 The following comments have been addressed from the comments letter dated August 5, 2019 for 8311 Talbot Rd: 1. Addressed by others 2. A lateral analysis was done for the rear wall line of the home. The second story has been revised to show new shear walls and holdowns. The first story had no changes to the existing load, and all anchorage bypasses this level. 3. All existing floor framing and existing roof framing information has been added to the plan set. A foundation page showing the existing foundation information has also been added to the plan set. The foundation plan is based on non- destructive field observations. For those conditions where the load path has changed, detail REM directs the contractor to verify the existing condition or construct the elements that have been specified. 4. Addressed by others. Deck extension has been removed from the design. The existing footprint will remain. 5. The existing deck remaining unchanged has been analyzed for a20 psf dead load, 60 psf live load, and 25 psf snow load, and changes to the framing are required. These changes are shown on the plan and the member calculations are attached in the calculation packet. Detail DALL shows the lateral deck attachment and detail EDL shows the exterior deck ledger connection, both of which are required to support the loads listed, The minimum footing dimensions are shown on the foundation pâg€, and the existing footings shall be verified in the field. 6. Addressed by others 7. Addressed by others Scannefi RESI,JE AUG 2 ô 201$ *8*I8,WJûBffiE* 24Ll',3 56thAveW - MountlakeTerrace,WA 98043 - Ph=425-778-1023 - wvwv.ssseng.com KHK S0tjiln STRIJCTIJRÂL S0LIJTI0I'|S Ê,NCTNËgRS B. Addressed by others. 9. Addressed by others. 10. Addressed by others. 11. Detail GPA has been added to show the guard post and rail connection. Calculations are also added to the calculation packet provided. See the architectural plans for the balances of guard information. 12.The post calculations are provided for the posts carrying the load from beam 2-1 (Ceiling Beam). The plans also detail how this load is carried down to the ground. There was an existing dropped beam in this location, the load path has not changed. The south end however did not have adequate support so members along this load path have been upgraded. 13. Detail CBC has been created to show the connection from the ceiling beam to the 4x10 dropped beam (beam 2-2). Refer to detail CB for any other information about the ceiling beam. 14.All new headers are called out on the structural plans with the minimum required member needed. Existing headers are labeled on the plan. All members need to be verified in the field. 15. Addressed by others. 16. Addressed by others. 17. Addressed by others. If you have any questions or require additional information, please call 24llg 56thAveW - MountlakeTerracerWA 98043 - Ph=425-778-1023 - wvwv.ssseng.com