Loading...
218_St_SW-8620-Shaw-Sewer_Latecomers.pdf� 8 9 0 - I C) 9 - CITY OF EDMONDS 250 - 5TH AVE. N. - EDMONDS, WA 98020 - (206) 771-0220 - FAX (206) 771-0221 COMMUNITY SERVICES DEPARTMENT Public Works 9 Planning a Parks and Recreation e Engineering February 16, 1993 Mrs. Vera Shaw 8620 - 218th St. S.W. Edmonds, WA 98026 Dear Mrs. Vera Shaw: LAURA M. HALL MAYOR As you were informed last month, sewers are available for connection in your area of the city. Property owners having failed or failing septic systems should connect as soon as possible. All other owners are encouraged to do so as well. At this time, there is no established timeline to connect to the sewer system. However, the City does reserve the right to require hookup within 60 days if a septic system is failing or if other health hazard exists. Please be aware that your property was not originally assessed for the sewers that front your property. At the time the sewers were installed under L.I.D. 189, your property was not in the city and, therefore, could not be included as part of the L.I.D. Thus, in order to be fair to the other property owners that financed L.I.D. 189 as well as those in the adjoining L.I.D. 213, the city requires you pay a latecomers assessment fee prior to connecting. Following our procedures as described below should simplify the installation process and minimize inconveniences. 1. Pay the latecomers assessment fee of $12.15 per zone front foot which equates to $3249.27. 2. Obtain a side sewer connection and inspection permit at the Community Services Building, 250 Fifth Avenue North. 3. Read all requirements located on the back of the permit. Flyers will be available from the Permit Coordinator when your side sewer permit is issued. 4. If you or your contractor have any questions at this time, please contact Everett Akau at 771-0235, extension 354 or myself at extension 349. This way we can clarify anything before the actual installation takes place. 5. Proceed with the installation. Incorporoted August 11, 1890 0 Sewer Connection Page 2 6. Schedule an inspection providing the City 24 hours advance notice. Make sure that you provide the permit number at this time and have the permit at the job site. 7. Once an inspection is complete and accepted by our inspector, you will have two (2) days to break in the top of the existing septic tank and fill it with sand. Required by the Uniform Plumbing Code. At this time, our inspector will finalize your permit. Please feel free to contact this department if you are unsure about any steps in this process. I will be glad to have an inspector meet with you and go through the procedure so we can make the entire process as simple as possible for you. Thank you for your cooperation. Holland Water/Sewer Supervisor RH/l k SEW/CON2/TXTSEWER