224_ST_SW_D1-7307-SEWER.pdfJ
City of Edmonds
,
INTER -OFFICE CORRESPONDENCE
Gary `McComas Fire M.
Bobby Mills P.W.
10/8i86
DanSmlth/Jerry;Hauth;:--,Engineering; Bruce-Finke DATE'
TD
FROM
`" SUBJECT
'30
LOT LINE ADJUSTMENT AT 22315 HIGHWAY 99 (CG)'
S 66.
f
at
RE SPOND.WITH YOUR COMMENTS NO LATER THAN
�t„7
k �tkw
PLEA'SE
OCTOBER722 1986
SGM S�9'C
,
THANKS.
h
QUT
►
t
.1
t
,V 09" 32� 48�W
REVJS/ON ��
P1.10PO ID
39.75' I� �,�• II
P.2oPOfED AREA //0�n� I OLD PROP. II
OF 00AJV6'YA WW:
of
6J n'l II 47-ORM rEwE''9
_..._WATER Ii
FIRE A1Y'PRAA17"
4 o CA7CN SASJ,V
�� hN 1 ii 21 p
NB9'32'43-Wi 16797'
! II 1 ii
/ ! `
® STORM II I DETENTIONr10A1
n FA (� I I O1417-Y
`( 1
J II
I
Al 65 --.z 33 "W! 270. 94'
—C -_-- - .---AJ 89° 32_ 33 LV 6. "
"OTC
SEE RECORD OF P ,�%
VoG . 12 PB. 3 ACe;0. G REC O. /ILN
6004!! 500(0
,PLUM TREE.PLAZA)
OCT 3 �
I
j�
LOT _ /NE AD<lGJSTME/V T FD!'
h'/DDE,', MATA4E"W4, .* 1964ASER
!N THE /VW4' g�Y , SEC. 29, - T271V, 24E, WM.
C/TY e9F-DMOAADS, W.A&N/NGTON j
oes. IDATE J/1/ .FILE NO, j
/Reid. Middleton G Associates_ Inc_DR
-
tJj�J Engineers w So:va oestor,�o ananoeozo cN. ,QL,�..'Ieea�E HE''85'J3o
OWNER'S NAME
TELEPHONE NUMBER
Aurora Center Associates
I 454-7040
STREET ADDRESS
CITY
STATE
ZIP
411 108th Avenue.N.E.
�WA
Suite 210
Bellevue
98004
AGENT'S NAME
TELEPHONE NUMBER
Russ Segner
Mgr. Partner - Owner
454-7040
STREET ADDRESS
CITY
STATE
ZIP
411 108th Avenue N.E.
Suite 210
Bellevue '
WA
98004
ADDRESS OF PROPERTY TO BE SUBDIVIDED:
NUMBER OF LOTS
22315 Highway 99
PROPOSED:
Edmonds, Washington 98020
-0-
APPLICANT REgUESTS THAT THE FOLLOWING MODIFICATION OF REQUIREMENTS BE CONSIDERED:
Adjustment proposes to alter the northern boundary of Aurora
Center,(Plum Tree Plaza),to Andy,'s Motel, transferring
1.605 s.f. to Andy's Motel
Release/Hold`Harmless Agreement
The undersigned applicant, his heirs and assigns, in consideration for the City
processing the application agrees to release, indemnify, defend and hold the City of:
Edmonds _harmless `from any and all damages and/or claims for °damages, including
reasonable attorneys' fees, "arising from any action or inaction of the City whenever'
such action or inaction is based in whole or in part upon>false,;misleading or
incomplete information furnished b the applicant, his agents or employees.
P Y PP 9 P
Permission to Enter Subject Property
The undersigned applicant grants his, her or its permission for public officials and
the staff of the City of Edmonds to enter the subject property for the purpose of
inspection and postingattendant to this application:
*Owner's authorization, by notarized e
rsignature, is required for any --r
application submitted by an agent. ignature of Property g ner or Owner s
Authorized Anent*
THIS SECTION IS FOR THE USE OF THE EDMONDS PLANNING DIVISION
Date/b Y4 File NS-3o—,P(- Fee $__Receipt # s9
Zone Desi nation C(5;— Env.Sensi,tive Area? No APO's t%
Title Report ✓ Legals E'ivMap /
Existing Proposed
Env. Assessment t/ Env. Checklist
HEARING DATE
U --
i
li[9
Existing Aurora Center (Plum Tree Plaza)_
Beginning at the Southwest corner of the Northwest quarter of the
Southwest quarter of Section 29, Township 27 North, Range 4, East, W.M..;
thence North 88*59' East along the one sixteenth line for 671.38 feet;
thence North 2119130" West for 87.5 feet to the true point of beginning;
thence continue on same course for 558.5 feet to an intersection with the
Easterly margin of State Road No. 1;
thence along said Easterly margin South 23°58' West 616.1 feet to a point
which is South 88*59' West 272.58 feet distant from the true point of
beginning;
thence North 88°59' East to the true point of beginning.
Existing Andy's Motel
The North half of the West half of the West half of the Southeast quarter
of the Northwest quarter of the Southwest quarter of Section 29,
Township 27 North, Range 4 East, W.M.
EXCEPT State Highway No. 1.
Proposed Convevance
The north 80.74 feet, as measured along the east line, of that portion of
the Southwest quarter of the Northwest quarter of the Southwest quarter of
Section 29, Township 27 North, Range 4 East, W.M., lying east of the east
right-of-way line of PSH No. 1 as said line is established 50.0 feet from
highway centerline, containing 1,605 square feet,
more or less.
121 5th Avenue North, 5uite 200. Edmonds, Washington 98020 (206) 775-3434
Segner/Lee Legal Desc. Cont.
October 3, 1986
File No. 02 85 138 002
Page 2
Proposed Aurora Center (Plum Tree Plaza
Beginning at the Southwest corner of the Northwest quarter of the
Southwest quarter, of Section 29, Township 27 North, Range 4, East, W.M.;
thence North 88059' East along the one sixteenth line for 671.38 feet;
thence North 2'19'30" West for 87.5 feet to the true point of beginning;
thence continue on same course for 558.5 feet to an intersection with the
Easterly margin of State Road No. 1;
thence along said Easterly margin South 23'58' West 616.1 feet to a point
which is South 88'59' West 272.58 feet distant from the true point of
beginning;
thence North 88'59' East to the true point of beginning.
EXCEPT the north 80.74 feet, as measured along the east line, of that
portion of the Southwest quarter of the Northwest quarter of the Southwest
quarter of Section 29, Township 27 North, Range 4 East, W.M., lying east
of the east, right-of-way line of PSH No. 1 as said line is established
50.0 feet from highway centerline, containing 1,605 square feet,
more or less.
Proposed Andv's Motel
The North half of the West half of the West half of the Southeast quarter
of the Northwest quarter of the Southwest quarter of Section 29,
Township 27 North, Range 4 East, W.M.
EXCEPT State Highway No. 1.
AND TOGETHER WITH the north 80.74 feet, as measured along the east line,
of that portion of the Southwest quarter of the Northwest quarter of the
Southwest quarter of Section 29, Township 27 North, Range 4 East, W.M.,
lying east of the east right-of-way line of PSH No. 1 as said line is
established 50.0 feet from highway centerline, containing 1,605 square
feet, more or less.
All situate in the City of Edmonds, County of Snohomish, State of
Washington.
�.�.� 1.. STE.,�- fro
pn p°: alai eC J4'
c�s10PIAL .`ANo SJ
CITY OF EDMONDS PROJECT Nkr;E Aurora Plaza
. _(Plum,Tree Plaza)
ENVIRONMENTAL ASSESSMENT DATE SUBMITTED September 1986
ForLot Line Adjustment
in
formation nformation on this form will be used to determine the effect of your action upon the
environment of the City of Edmonds. Please answer each question as thoroughly as possible.
1. LAND
Area 1605 s.f. Soils Type Glacial Till Limitations None
Description of topography (% slope) Property contains a mound of soil to 5'/6' height
NOTE: If grading or filling will
Grading: Estimated cubic yards --- exceed 500 cubic yards a grading
and filling plan must be sub -
Filling: Estimated cubic yards --- mitted with the application.
Estimated area to be paved (including buildings) None
Estimated area in open space (pervious surface) None (Remain Unchanged)
2. WATER
Stream, - Estimated flow (cubic feet per second) None
Will stream be altered? No If yes, to what degree? N/A
Other water bodies?
Impact on storm drainage None Method of handling runoff Runoff was
considered in Aurora Plaza Project
Adjacent to shorelines zone? No Within 200 feet of MHHW? No
3. VEGETATIO':
Type and approximate number of trees Property contains native vegetation which
will remain unchanged
Minimum diameter of trees to remain No change % of trees to be removed none
Ground cover Native Brush % to be removed Non
Proposed landscaping, if any No change on land at this time.
4. EXISTI14G LAND USE WITHIN 300 FEET RADIUS OF PROPOSED DEVELOPMENT:
Single Multi -
Vacant Family Family Commercial Other
North
South * 224th Street S.W.
East
West Old Hwy. 99`
5. CIRCULATION f
Estimated increase in auto trips daily None with action
Availability of public transportation Snohomish County
6. AREA OF IMPACT
Neighborhood * City-wide Regional
7. EFFECT ON AIR QUALITY None
S. CHANGES IN NOISE GENERATION None
9. Note: This action involves only a Lot Line Adjustment of an on -going project which
has been given environmental consideration and which has received a determination
of non -significance. (See attached)
CITY
OFEDMONDS
11M IL •
1\ I UUG 1 , . 1. I.IIG I.J y.-• -
-
HEARING
DATE: VICINITY: 22315
Highway 99;"
Req ,d Req d
'a
Prior to W/Bldg. Bond
Recrding Permit Posted Complete
1.
Rights -of -Way for Public Streets:
None required.
x
2.
Easements City utilities, private access,
-
other utilities):
None existing.
x
3.
Street improvements ACP with curb & gutter
Pave shoulder & install curb and gutter
across frontage to match improvement to the
south.
x
4.
Street turnaround:
i
None required.
x
5.
Sidewalks and/or walkways:
Install sidewalk to match improvement to
the south.
x
6.
Street lights:
None required.
x
7.
Planting strip:
Match improvement to the south.
x
8.
Water system improvements pipelines, fire
hydrants, pump stations, telemetering,
D.S.H.S., etc.):
None required.
x
9.
Sanitary sewer system improvements pipe-
lines, pump stations, telemetering,
health district, etc.):;,
None required.
t
10.
Storm sewer system improvements pipelines,
pump station, D.O.E., fisheries, etc.):,-
None required.
x
KIDDER/TXTFORMS
f,
r
Engineering Requirements, Page 2
I Req'd Req'd
to Prior to W/Bldg. Bond
Recrdinq Permit Posted Com lete;
11. On -site drainage (plan per Ord. 1924):
x 1.
None required.
12. Underground wiring per Ord. 1387
x ;..;
p� None required.
13. Excavation and grading per UBC, Chapter 70
Slope hillside back from sidewalk, per code- x -
14. Signage per City Engineer
r x
None required.
t:
15. Survey monumentation per Ord., Sec. x
k 12.10.120):
x.
16. As -built drawings per City Engineer :
17. Inspection fee 2.2% of approved cost x
estimate):
l
18. Other requirements:
a) Plat showing lots, easements, legal x p
survey info.
b) Legal documents for each lot
x
c) Field staking - lot corners (by
X
professional surveyor)
x
d) Maint. agree. (private road & util.}
x
e) Utility development plan
x
f) Traffic study
g) Others
CITY ENGEE
INR, (liv OF EDMONDS Hate
The Engineering requirements have been completed and the subdivision can be
recorded.
Dater
Authorized for recording by:
f,.