Loading...
224_ST_SW_D1-7307-SEWER.pdfJ City of Edmonds , INTER -OFFICE CORRESPONDENCE Gary `McComas Fire M. Bobby Mills P.W. 10/8i86 DanSmlth/Jerry;Hauth;:--,Engineering; Bruce-Finke DATE' TD FROM `" SUBJECT '30 LOT LINE ADJUSTMENT AT 22315 HIGHWAY 99 (CG)' S 66. f at RE SPOND.WITH YOUR COMMENTS NO LATER THAN �t„7 k �tkw PLEA'SE OCTOBER722 1986 SGM S�9'C , THANKS. h QUT ► t .1 t ,V 09" 32� 48�W REVJS/ON �� P1.10PO ID 39.75' I� �,�• II P.2oPOfED AREA //0�n� I OLD PROP. II OF 00AJV6'YA WW: of 6J n'l II 47-ORM rEwE''9 _..._WATER Ii FIRE A1Y'PRAA17" 4 o CA7CN SASJ,V �� hN 1 ii 21 p NB9'32'43-Wi 16797' ! II 1 ii / ! ` ® STORM II I DETENTIONr10A1 n FA (� I I O1417-Y `( 1 J II I Al 65 --.z 33 "W! 270. 94' —C -_-- - .---AJ 89° 32_ 33 LV 6. " "OTC SEE RECORD OF P ,�% VoG . 12 PB. 3 ACe;0. G REC O. /ILN 6004!! 500(0 ,PLUM TREE.PLAZA) OCT 3 � I j� LOT _ /NE AD<lGJSTME/V T FD!' h'/DDE,', MATA4E"W4, .* 1964ASER !N THE /VW4' g�Y , SEC. 29, - T271V, 24E, WM. C/TY e9F-DMOAADS, W.A&N/NGTON j oes. IDATE J/1/ .FILE NO, j /Reid. Middleton G Associates_ Inc_DR - tJj�J Engineers w So:va oestor,�o ananoeozo cN. ,QL,�..'Ieea�E HE''85'J3o OWNER'S NAME TELEPHONE NUMBER Aurora Center Associates I 454-7040 STREET ADDRESS CITY STATE ZIP 411 108th Avenue.N.E. �WA Suite 210 Bellevue 98004 AGENT'S NAME TELEPHONE NUMBER Russ Segner Mgr. Partner - Owner 454-7040 STREET ADDRESS CITY STATE ZIP 411 108th Avenue N.E. Suite 210 Bellevue ' WA 98004 ADDRESS OF PROPERTY TO BE SUBDIVIDED: NUMBER OF LOTS 22315 Highway 99 PROPOSED: Edmonds, Washington 98020 -0- APPLICANT REgUESTS THAT THE FOLLOWING MODIFICATION OF REQUIREMENTS BE CONSIDERED: Adjustment proposes to alter the northern boundary of Aurora Center,(Plum Tree Plaza),to Andy,'s Motel, transferring 1.605 s.f. to Andy's Motel Release/Hold`Harmless Agreement The undersigned applicant, his heirs and assigns, in consideration for the City processing the application agrees to release, indemnify, defend and hold the City of: Edmonds _harmless `from any and all damages and/or claims for °damages, including reasonable attorneys' fees, "arising from any action or inaction of the City whenever' such action or inaction is based in whole or in part upon>false,;misleading or incomplete information furnished b the applicant, his agents or employees. P Y PP 9 P Permission to Enter Subject Property The undersigned applicant grants his, her or its permission for public officials and the staff of the City of Edmonds to enter the subject property for the purpose of inspection and postingattendant to this application: *Owner's authorization, by notarized e rsignature, is required for any --r application submitted by an agent. ignature of Property g ner or Owner s Authorized Anent* THIS SECTION IS FOR THE USE OF THE EDMONDS PLANNING DIVISION Date/b Y4 File NS-3o—,P(- Fee $__Receipt # s9 Zone Desi nation C(5;— Env.Sensi,tive Area? No APO's t% Title Report ✓ Legals E'ivMap / Existing Proposed Env. Assessment t/ Env. Checklist HEARING DATE U -- i li[9 Existing Aurora Center (Plum Tree Plaza)_ Beginning at the Southwest corner of the Northwest quarter of the Southwest quarter of Section 29, Township 27 North, Range 4, East, W.M..; thence North 88*59' East along the one sixteenth line for 671.38 feet; thence North 2119130" West for 87.5 feet to the true point of beginning; thence continue on same course for 558.5 feet to an intersection with the Easterly margin of State Road No. 1; thence along said Easterly margin South 23°58' West 616.1 feet to a point which is South 88*59' West 272.58 feet distant from the true point of beginning; thence North 88°59' East to the true point of beginning. Existing Andy's Motel The North half of the West half of the West half of the Southeast quarter of the Northwest quarter of the Southwest quarter of Section 29, Township 27 North, Range 4 East, W.M. EXCEPT State Highway No. 1. Proposed Convevance The north 80.74 feet, as measured along the east line, of that portion of the Southwest quarter of the Northwest quarter of the Southwest quarter of Section 29, Township 27 North, Range 4 East, W.M., lying east of the east right-of-way line of PSH No. 1 as said line is established 50.0 feet from highway centerline, containing 1,605 square feet, more or less. 121 5th Avenue North, 5uite 200. Edmonds, Washington 98020 (206) 775-3434 Segner/Lee Legal Desc. Cont. October 3, 1986 File No. 02 85 138 002 Page 2 Proposed Aurora Center (Plum Tree Plaza Beginning at the Southwest corner of the Northwest quarter of the Southwest quarter, of Section 29, Township 27 North, Range 4, East, W.M.; thence North 88059' East along the one sixteenth line for 671.38 feet; thence North 2'19'30" West for 87.5 feet to the true point of beginning; thence continue on same course for 558.5 feet to an intersection with the Easterly margin of State Road No. 1; thence along said Easterly margin South 23'58' West 616.1 feet to a point which is South 88'59' West 272.58 feet distant from the true point of beginning; thence North 88'59' East to the true point of beginning. EXCEPT the north 80.74 feet, as measured along the east line, of that portion of the Southwest quarter of the Northwest quarter of the Southwest quarter of Section 29, Township 27 North, Range 4 East, W.M., lying east of the east, right-of-way line of PSH No. 1 as said line is established 50.0 feet from highway centerline, containing 1,605 square feet, more or less. Proposed Andv's Motel The North half of the West half of the West half of the Southeast quarter of the Northwest quarter of the Southwest quarter of Section 29, Township 27 North, Range 4 East, W.M. EXCEPT State Highway No. 1. AND TOGETHER WITH the north 80.74 feet, as measured along the east line, of that portion of the Southwest quarter of the Northwest quarter of the Southwest quarter of Section 29, Township 27 North, Range 4 East, W.M., lying east of the east right-of-way line of PSH No. 1 as said line is established 50.0 feet from highway centerline, containing 1,605 square feet, more or less. All situate in the City of Edmonds, County of Snohomish, State of Washington. �.�.� 1.. STE.,�- fro pn p°: alai eC J4' c�s10PIAL .`ANo SJ CITY OF EDMONDS PROJECT Nkr;E Aurora Plaza . _(Plum,Tree Plaza) ENVIRONMENTAL ASSESSMENT DATE SUBMITTED September 1986 ForLot Line Adjustment in formation nformation on this form will be used to determine the effect of your action upon the environment of the City of Edmonds. Please answer each question as thoroughly as possible. 1. LAND Area 1605 s.f. Soils Type Glacial Till Limitations None Description of topography (% slope) Property contains a mound of soil to 5'/6' height NOTE: If grading or filling will Grading: Estimated cubic yards --- exceed 500 cubic yards a grading and filling plan must be sub - Filling: Estimated cubic yards --- mitted with the application. Estimated area to be paved (including buildings) None Estimated area in open space (pervious surface) None (Remain Unchanged) 2. WATER Stream, - Estimated flow (cubic feet per second) None Will stream be altered? No If yes, to what degree? N/A Other water bodies? Impact on storm drainage None Method of handling runoff Runoff was considered in Aurora Plaza Project Adjacent to shorelines zone? No Within 200 feet of MHHW? No 3. VEGETATIO': Type and approximate number of trees Property contains native vegetation which will remain unchanged Minimum diameter of trees to remain No change % of trees to be removed none Ground cover Native Brush % to be removed Non Proposed landscaping, if any No change on land at this time. 4. EXISTI14G LAND USE WITHIN 300 FEET RADIUS OF PROPOSED DEVELOPMENT: Single Multi - Vacant Family Family Commercial Other North South * 224th Street S.W. East West Old Hwy. 99` 5. CIRCULATION f Estimated increase in auto trips daily None with action Availability of public transportation Snohomish County 6. AREA OF IMPACT Neighborhood * City-wide Regional 7. EFFECT ON AIR QUALITY None S. CHANGES IN NOISE GENERATION None 9. Note: This action involves only a Lot Line Adjustment of an on -going project which has been given environmental consideration and which has received a determination of non -significance. (See attached) CITY OFEDMONDS 11M IL • 1\ I UUG 1 , . 1. I.IIG I.J y.-• - - HEARING DATE: VICINITY: 22315 Highway 99;" Req ,d Req d 'a Prior to W/Bldg. Bond Recrding Permit Posted Complete 1. Rights -of -Way for Public Streets: None required. x 2. Easements City utilities, private access, - other utilities): None existing. x 3. Street improvements ACP with curb & gutter Pave shoulder & install curb and gutter across frontage to match improvement to the south. x 4. Street turnaround: i None required. x 5. Sidewalks and/or walkways: Install sidewalk to match improvement to the south. x 6. Street lights: None required. x 7. Planting strip: Match improvement to the south. x 8. Water system improvements pipelines, fire hydrants, pump stations, telemetering, D.S.H.S., etc.): None required. x 9. Sanitary sewer system improvements pipe- lines, pump stations, telemetering, health district, etc.):;, None required. t 10. Storm sewer system improvements pipelines, pump station, D.O.E., fisheries, etc.):,- None required. x KIDDER/TXTFORMS f, r Engineering Requirements, Page 2 I Req'd Req'd to Prior to W/Bldg. Bond Recrdinq Permit Posted Com lete; 11. On -site drainage (plan per Ord. 1924): x 1. None required. 12. Underground wiring per Ord. 1387 x ;..; p� None required. 13. Excavation and grading per UBC, Chapter 70 Slope hillside back from sidewalk, per code- x - 14. Signage per City Engineer r x None required. t: 15. Survey monumentation per Ord., Sec. x k 12.10.120): x. 16. As -built drawings per City Engineer : 17. Inspection fee 2.2% of approved cost x estimate): l 18. Other requirements: a) Plat showing lots, easements, legal x p survey info. b) Legal documents for each lot x c) Field staking - lot corners (by X professional surveyor) x d) Maint. agree. (private road & util.} x e) Utility development plan x f) Traffic study g) Others CITY ENGEE INR, (liv OF EDMONDS Hate The Engineering requirements have been completed and the subdivision can be recorded. Dater Authorized for recording by: f,.