23220 EDMONDS WAY-Bond Worksheet.pdfA� Site Improvement Bond Quantity Worksheet S15 Webdate: 0212212013 I.fq LV King County Department of Permitting & Environmental Review 35030 SE Douglas Street, Suite 210 Snoclualmie, Washington 98065-9266 For alternate formats, call 206-296-6600. 206-296-6600 TTY Relay 711 (314). ZA 65P OAL,20/-// O&T Project Name: Brackett Court Apartments Date: 11/18/2014 Location-. 23220 Edmonds Way, Edmonds, VVA Project No.: TBD Activity No.: Exempt Project Clearing greater than or equal to 5,000 board feet of timber? KA _ yes W /A no If yes, X Forest Practice Permit Number.- (N/A (Exempt)� (RCW 76.09) Z_ 1 A c- ou u rze�&-A -z� i -re) Note-. All prices include labor, equipment, materials, overhead and profit. Prices are from IRS Means data adjusted for the Seattle area or from local sources if not included in the IRS Means database. 277�j -5t02) Z_ 915 lk a ak' t_ ip�) 21,31,ok 3z, 54& Wo oN 1 13o�JbA I z-5, 44) 1159 F�' Page 1 of 9 Project Bond Summary 23220 Edmonds Way WOEIVED NOV 19 2014 Unit prices updated: 02/12102 Version; 11/2612008 Report Date: 11/1812014 Site Improvement Bond Quantity Worksheet M Webdate: 02/2212013 Reference # Unit Pn' ce . ..... U...-�. nit Quantity # of pplliic�rl6rls C OS EROSION/SEDIMENT CONTROL Backfilf & compaction -embankment ESC-1 5.62 CY ,Check dams, 4" minus rock ESC-2 SWDM 5.4.6 3 $ 67.61 Each .Crushed surfacing 1 1/4" minus ESC-3 WSOOT 9-03.9(3) $ 85.45 CY Ditching ESC-4 —5 -ES—C — $ 8.08 CY Excavation -bulk - $ 1.50 --1000 Cy 1500 .Fence, silt ESC-6 SWDM 5.4.3.1 $ 1.38 LF 220 304 Fence, Temporary (NGPE) ESC-7 $ 1.38 LF :Hydroseeding ESC-8 SWIDM 5.4.2.4 $ 0.59 SY Jute Mesh ESC-9 SWDM 5-4.2.2 $ 1.45 SY Mulch, by hand, straw, 3" deep ESC-10 SWDM 5.421 $ 2.01 SY 300 2 1206 Mulch, by machine, straw, 2" deep ESC-1 I SWI)M 5.4,2.1 $ 0,53 SY Piping,temporary, CPP, 6" ESC-12 $ 10,70 LF .Piping, temporary, GPP, 8" ESC-13 $ 16,101 LF Piping, temporary, CPP, 12" ESC-14 $ 20,70 1 LF —20 414 Plastic covering, 6mm thick, sandbagged ESC-1 5 SWDM 5.4.2.3 $ 2.301 SY Rip Rap, machine placed; slopes ESC-1 6 WSDOT9-13,1(2) $ 39.08 1 CY Rock Construction Entrance, 50'xl5'xl' ESC-17 SWDM 5.4.4.1 $ 1,464.34 Each 1 1464 Rock Construction Entrance, I 00'xl 5'x 1' ESC-1 8 SWDIVI 5.4.4.1 $ 2,928.68 Each Sediment pond riser assembly ESC-19 SWDIVI 5.4�5.2 $ 1,949.38 Each Sediment trap, 5' high berm ESC-20 SWDM 5.4,5.1 $ 17.91 LF 25 448 .Sed. trap, Shigh, fiprapped spillway berm section ESC�21 SWIDM 5.4,5.1 $ 68.54 LF Seedinq, bV hand Sodding, 1" deep, level ground ESC-22 SWDM 5.4.2.4 $ 0.51 SY 300 153 ESC-23 SWDM 5.4-2.5 $ 6.03 SY Sodding, 1 " deep, sloped ground ESC-24 SWOM 5A.2.5 $ 7-.451 SY TESC Supervisor ESC-25 $ 74.75 HR 30 2243 Water truck, dust control ESC-26 SWOM 5A.7 $ 97.75 HR WRITE -IN -ITEMS (see page 9) Each Page 2 of 9 Project Bond Summary 23220 Edmonds Way ESC SUBTOTAL: 30% CONTINGENCY & MOBIL17-ATION: ESC TOTAL: COLUMN: $ 7,731.19 $ 2,319,36 $ 10,050.55 A Unit prices updated: 02112102 Version: 11/26/2008 Report Date: 11/18/2014 Site Improvement Bond Quantity Worksheet Web date: 1210212008 Existing Right -of -Way Future Ptblic Private Right of Way Improvements & Drainage Facilities Quantity Completed (Bond Reduction)* Quant. Unit Price Unit Quant. Cost Q .. t. Cost Quant. Cost ComDlete� Cost GENERAL ITEMS t�-O--- I Backffll & Compaction- embankment GI - -11 $ 5.62 CY Backfill & Compaction- trench G1 - 2 $ - 8.53 CY 1 80 682.40 370 3,156 1 D CleartRemove Brush, by hand GI-3 $ 0.36 SY Clearing/G rub bing/Tree Removal G1 -4 $ 8�876.16 Acre 0-05 443.81 0-5 4.438.08 Excavation - bulk GI-51 $ 1.5D CY 1100 1.650,00 Excavation - Trench GI - 6 $ 4.06 CY so 324.801 370 1,502.20 Fencing, cedar, 6'high G1 - 7 $ 18.55 LF Fencing, chain link, vinyl coated, 6' hiqh GI - 8 $ - 13.44 LF 310 4,166.40 Fencing, chain link, qate, vinyl c -oated, 2 GI -9 $ 1,271.81 Each Fencing, split rail, Thigh Gl - 1 $ 12.12 LF fill & compact - common barrow G1 - 111 $ 22.57 1 CY fill & compact - gravel base G1 - 12 $ 25.48 CY ,Fill & compact - screened toosoil GI - 13 $ 37.135 CY 15 567.75 80 3,028.00. -Gablon, 12" deep, stone filled mesh G1 - 14 $ 54.31 SY .13abion, 18" deep, stone filled mesh GI - 15F$ 74.85 Sy Gabion, 36" deep, stone filled mesh (31-16 $ 13248 SY Grading, fine, by hand GI - 17 S 2.02 SY 100 202.00 700 1,414.00 Gradinq, fine, with grader GI - 18 $ 0.95 SY 560 532.00 Monuments, 3! lonq GI - 19 $ 135.13 Each Sensitive Areas Sign (31-201 S 2.88 Each — - :Sodding, V deep, sloped ground IGI GI - 211 $ 7.46 SY :Surveying, line & qrade -2 $ 788,26 Dav Surveying, lot location1lines GI - 23 $ 1.556.64 Acre Traffic control crew ( 2 flaggers GI - 24 S 85.18 HR 8 681.44 Trail, 4" chipped wood G1 - 25 $ 7.59 SY Trail. 4" crushed cinder G1 - 26 $ 8.33 SY Trail, 4" top course G1 - 27 $ 8,19 SY Aall, retaining, concrete IGI -281 $ 44.16 SF ,Wall, rookery IGI - 291 $ 9,49,- SF 995 9,442.56 Page 3 of 9 SUBTOTAL 2,902.20 29,329,33 Unit prices updated: 02/12/02 *KCC 27A authorizes only one bond reduction. Version: 11/26/08 Project Bond Summary 23220 Edmonds Way Report Date: 11/18/2014 Site Improvement Bond Quantity Worksheet Web date: 12J02/2008 Existing Right-of-way Future Public Right of Way & Drainane Facilities Private Improvements Bond Reduction* Quant. Unit Price T st Quan Cost 7— —Qunt. —Cost Completel Cost ROADIMPROVEMENT No. AC Grinding, 4'wide machine < 1000sy R1 - 1 $ 28.00 SY AC Grinding, 4'wide machine i000-200C R1 - 2 $ 15.00 SY AC Grinding, 4'wide machine > 2000sy RI - 3 S 7.OG SY AC Removal/Disposal/Repair RI-4 $ 67.50 SY 30 2.025,00 Barricade, type I Rl - 5 $ 30.03 LF Barricade, type III (Permanent) Rl - 6 $ 45.05 LF Curb & Gutter, rolled RI-71 $ 17.00 LF .Curb & Gutter, vertical RI-8 $ — 1250 LF 601 750.00T .Curb and Gutter. demolition and disDosa RI-9 S 18.00 LF 60 1,080.001 Curb, e)druded aspha[I Ri - IG $ 5.50 LFf Curb, extruded concrete RI - 11 $ 7.00 1 LF 60 420.00 .Sawcut, asphalt, 3" dej)th RI - 121 S 1-851 LF 100 185.00 -Sawcut, concrete, per 1" depth RI - 131 S 1.69 LF I Sealant, asphalt Rl - 141 $ 1.25 LF 1 —1001 125.00 Shoulder, AC, (see AC road unit price I R1 - 1,91 $ - SY I Shoulder, gravel, 4" thick RI - 16�. $ 15.00 SY Sidewalk, 4" thick RI - 17l $ 35.00 SY 80 2,800.00 1051 3,675.00 Sidewalk, 4" thick, demolition and disDos RI - 18 $ 29.50 SY I Sidewalk, 5" thick — R1 - 19 $ 38.50 Sy 40 1,540.001 151 577.50 Sidewak 5" thick. demolition and discos R1 - 20 $ 37.50 SY Sign, handicap RI - 21 $ 85.28 Each Striping, per stall RI-22 $ 5.82 Each Striping, thermoplastic. f for crosswalk I RI - 23 $ 2.38 SF Striping, 4" reflectorized line R1 - 24 $ 0.25 LF Page 4 of 9 SUBTOTAL 8,505.00 4,67250 Unit prices updated: 02/12/02 *KCC 27A authorizes only one bond reduction. Version- 11/26108 Project Bond Summary 23220 Edmonds Way Report Date: 11/18/2014 Site Improvement Bond Quantity Worksheet Web date: 12102=08 Existing Right-of-way Future Public Right of Way & Drainage Facilities Private Improvements Bond Reduction* Quant. Unit Price Unit Quant. Cost Quant,__L Cost Quani. Cost Completel Cost ROAD SURFACING (4" Rock= 2.5 base& 1.5-top course) For'93 KCRS (6.5" Rock= 5" base& 1.5" top course) For KCRS'93, (additional 2.5" base) add d 2 "p5e, add "'O"'a' - ' RS - 1 RS - 1 $ 3.60 $ 3 ' 60 1 SY AC Overlay, 1. 5 " AC S RS - 2 $ 11.25 SY AC Overlay, 2" AC .AC Road, 2". 4" rock. First 2500 SY qover RS - 3 RS-4 $ 15.00 $ 21 M V$21.00 Sy SY AC Road, 2", 4" rock, QlY. over 2500SY RS - $ i gm ::� SY AC Road, 3", 4',' rock, First 2500 SY .0 RS - 6 $ 2 .30 $ 23.30 SY AC Road, 3", 4" rock, �Qty, QJY v 500 Sy 2500 SY S RS - 7 0 Sy �AC Road, 5", First 2500 SY .,kC Road, 5", Qty. Over 2500 SY IRS-9 $ 25.001 —33. SY AC Road, 6", First 25DO SY FIRS-1 V11-T 10 1 SY AC Road, 6", QtY. Over 2500 SY il:Rs - 11 'S - $ 30.00 30 '00 SY Sy ,Asphalt Treated Base, 4' thick IRS - I' $ 20.00 SY Gravel Road, 4" rock, First 2500 SY RS - 1" $ 15.00 Sy Gravel Road, 4" rock, QtY. over 2500 SY !RS - 1 $ 8.50 SY Sy PCC Road, 6". no base, over 2500 SY ,027,00 RS - 1 $ SY Y PCC Road, 6", no base, over 2500 SY -�S 2 IS -5 n I 5 qv I ,Thickened Edge RS - 11 $ 8. 60 U-W I L F Page 5 of 9 SUBTOTAL *KCC 27A authorizes only one bond reduction. Unit prices updated: 02112/02 Project Bond Summary 23220 Edmonds Way Version: 11/26108 Report Date: 11/18/2014 UKAINA(3L (CPP = Cora Access Road, RID _�Oliards - fixed Bollards - removable ' (CGs include frame and I;d) C6 Type I CS Type IL CB Type It. 48" diameter for additional dcplh over 4' C-B Type 11. 54" diameter for additional depth over 4' C6 Type 11, 60" diameter for additional depth over 4' CB Type 11. 72" diameter for additional depth over 4' Through -curb Inlet Framework Cleanoul, PVC. 4" Cleanout, PVC, 61, Cleanout. PVC, 8" Culvert. PVC. 4" Cutvert, PVC, 6" ,Culvert, PVC, &I .ulvert, PVC, 12, Culvert, CMP, 8" Culvert. CMP, 12" CUIVert, CMP, 15" P�Ulvert,_CMP, 18" Culvert, CMP. 24' Cuiverl. CMP, 3011 Culverl. OMP, 36' Culvert, CMP, 48" Culvert, CMP, 6011 Culvert, CMP, 72" Page 6 of 9 Site Improvement Bond Quantity Worksheet P�ri-U�nil Plastic Pipe. N12 or Equivalent) D- 21.00 SY D-2 $ 240,74 Each D - 3 452.34 Each D-4 1.257.64 Each D - 5 $ 1,433.59 Each 0-6 $ 2.033.57 Each D-7 S 4 6.52 3 FT D-8 $ 2,1 92.54 Each 1)_9 $ 486M FT I) - 10 $ 2,351.52 Each D-11 $ 536.54 FT D - 12 $ 3,212.64 Each D - 13 S 692.21 FT D - 141 $ 366M Each D- 15 $ 130.55 Each D - 16 S 174.90 Each D - 17 S 224.19 I Each D-19 $ 8.64 LF D - 19 $ 12.60 LF 1�- �20$ 13.33 LF I u _ 2" )-211 $ 2 $ 2 LF D - 22 S 1 S 17.251 LF 1 1 D-23 $ 2 $ 26.45 LF D 24[ - 24 $ 3 $ 32.73 LF D - 251 $ 37.74 1 LF I D - 261 $ 53.33 LF D - 271 $ 71.45 LF D - 281 $ 112.11 LF D-29 S 140.8131 LF D - 30 ED- 35.45 $ 2 ff LF 31J0$302.581 LF SUBTOTAL Web date: 121021200B Existing Future Public Private Bond Reductiow Right-of-way Right of Way Improvements & Drainage Facilities QU Cost Quaw. I cwt— Quant, I —cost Com ForCulveriprires. AvaragL c! 4'cover was assurned Assume pelorated PVC is same Drice as solid Djne� 11,318.76 2M3.57 13,352.33 *KCC 27A authorizes only one bond reduction. Unit prices updated: 02112/02 Project Bond Summary 23220 Edmonds Way Version: 11/26108 Report Date: 11/18/2014 Site Improvement Bond Quantity Worksheet Wab date� 1210212008 DRAINAGE CONTINUED Existing Right-of-way Future Public Right of Way & Drainage Facilities Private Improvements Quant. Bond Roduction' Quant. Culverl. Concrete. 8" No� D - 321 I Unit Price Unit Quant. Cost S F Culvert, Concrete, 12" D - 331 $ 30.05 LF Culverl. Concrete, 151, -Eulvert D - 341 $ 37.34 LF C-nr,�te,. 18" D - 351 $ 44.51 LF Culvert, Concrete, 24" D - 361 $ 61,07 LF Culvert, Concrete, 30" D - 37 $ 104.18 LF 1--ulver(, Concrete, 36" D - 38 E-39 $ 1�Z-§3 LE I Culvert, Concrete, 42" D $ .__ �: I F Culven. Concrete, 48" D - 40 $ 175.94 LF Culverl. CPP. 6" 0-41 S 10.71) LF Cu;vert. CPP. 8" Culvert, CPP, 12" Culvert, CPP, 15" -42 D-43 D -44 $ 16-10 S 2070 $ 23.00 LF LF LF 20 414 260 9 1863 Culver[. CPP, 18" D -45 $ 27.60 LF Culvert, CPP, 24" D - 461 $ 36.80 LF Culvert, CPP, 30" D - 47 $ 48.30 LF Culvert, CPP' 36' D-48 S 55.20 LF Ditching D - 49 $ 8.08 CY :h Flow Dispersal Trench (1,436 base+) D - 50 $ 25.99 LF French Drain (3'dlEepth) 0-51 $ 22.60 LF Geotextile. laid in trench, polvoropvlene D - 52t$ 2,40 SY Infiltration pond tes t' 'g ' 1) - 5-11 0 3 it 7A 7r Z Mid -lank Access Riser, 48" dia, 6'de 'P D- 4 5 -P !t0UZ36."9U Each Pond Over -flow Spiliway D - 55 $ 14.01 SY RestrictoF/Oil Separator, 1211 Restrictor/Oil Separator, 15" D - 56 S 1.045.19 $ 1,095.56 Each Each 1045.19 Restrictor/Oil Separator. 18" D - 58 D - "' $ 1.146' 16 $ 4' Each Riprap, placed D Q - 59 c 39 08 CY Tank End Reducer (36" diameter) D-60 $ 1,000 rn Trash Rack, 12" 1) -6 1 5 21 1 Uri Trash Rack, 15" D - 62 _3 $ 237 27 Each Trash Rack, 18" D - 63 $ 268.89 a Each Trash Rack, 21 _ 6 D - 64 $ 306 $ 306.84 11 Each Page 7 of 9 SUBTOTAL 414 7094-19 *KCC 27A authorizes only one bond reduction, Unit prices updated: 02112102 Project Bond Summary 23220 Edmonds Way Version: 11/26/08 Report Date: 1111812014 Site Improvement Bond Quantity Worksheet Web date� 12102/2008 Existing Right-of-way Future Public Right of Way & Oral Farilities Private Improvements Bond Reduction* Quant. Cost Hce Unit Quant. Price 7� Quant. Cost PARKING LOT SURFACING No. 2" AC, 2" top course rock & 4" borrow PL- 1 $ 21.00 -SY 11970 2"AC, 1.5" top course& 2.5" base cour PL-2 28-00 SY 4' select borrow PL - 3- $ 4.55 SY 1.5' top course rock & 2.5" base course PL - 4 11.41 SY UTILITY POLES & STREET LIGHTING Utility pole relocation costs must be accompanied by Franchise Utility's Cost Statement Utility Pole(s) Relocation UP-1 Lump Sum 15001 Street Light Poles wiLuminaires UP-2 Each WRITE -IN -ITEMS (Such as detentionfwater quality vaults.) No. Storm Detention Chamber Vault Storm Sand Filter Vault WI - 1 WI -2 $ 4,000.00 $ 5,000.00 Each Each 4,000.00 5,000.00 wl -3 CY WI -4 LF WI - 51 FT wl - 6 wl - 7 Wl -8 wl -9 wt - 10 SUBTOTAL SUBTOTAL (SUM ALL PAGES): 30% CONTINGENCY & MOBILIZATION: GRANDTOTAL: COLUMN: Page 8 of 9 1,500.00 13,321.20 3.996.36 17,317.56 8 F. 20,970.00 75.418.35 22,625.51 98,1343,86 D E *KCG 27A authorizes only one bond reduction. Unit prices updated: 02/12/02 Project Bond Summary 23220 Edmonds Way Version: 11126/08 Report Date: 11/1812014 Site Improvement Bond Quantity Worksheet Original bond computations prepared by: Name - PE Registration Number: Neil Latta 37391 Date: Tel. 9: Web date: 12J02/2008 11/7/2014 360-671-7002 Firm Name: Web Engineering Ltd Address: 125 W Kellogg Road. Bellingham, WA 98226 Project No: TBD ROAD IMPROVEMENTS & DRAINAGE FACILITIES FINANCIAL GUARANTEE REQUIREMENTS Stabilization/Erosion Sediment Control (ESC) Existing Right-cf-Way Improvements Future Public Right of Way & Drainage Facilities Private Improvements Calculated Quantity Completed Total Right -of Way and/or Site Restoration Bond*/** (First $7,500 of bond* shall be cash.) Performance Bond* Amount (A+B+C+D) = TOTAL Reduced Performance Bond* Total *** Maintenance/Defect Bond* Total NAME OF PERSON PREPARING BOND' REDUCTION: (A) PERFORMANCE BOND* AMOUNT $ 10,050.5 (B) $ 17,317.6 98,043.9 1 (A+B) $ 27,388.1 (T) $ 125,412.0 Minimum bond' amount is $2000. BOND* AMOUNT REQUIRED AT RECORDING OR TEMPORARY OCCUPANCY — T x 0.30 $ 37,623.6 OR (T-E) $ 125,412.0 Use larger of Tx3O% or (T-E) Date: PUBLIC ROAD & DRAINAGE MAINTENANCEIDEFECT BOND' (B+C) X 0.25 = $ 4,329.4_ NOTE: The word "bond" as used in this document means a financial guarantee acceptable to King County. NOTE; KCC 27A authorizes right of way and site restoration bonds to be combined when both are required. The restoration requirement shall include the total cost for all TESC as a minimum, not a maximum. In addition, corrective work, both on- and off -site needs to be included. Quantities shall reflect worse case scenarios not just minimum requirements. For example, if a salmonid stream may be damaged, some estimated costs for restoration needs to be reflected in this amount. The 30% contingency and mobilization costs are computed in this quantity. NOTE: Per KCC. 27A, total bond amounts remaining after reduction shall not be less than 30% of the original amount (T) or as revised by major design changes. I I REQUIRED BOND* AMOUNTS ARE SUBJECT TO REVIEW AND MODIFICATION BY DDES Page 9 of 9 Check out the DDES Web site at www.kin Unit prices updated: 02/12/02 _gcounty. goylpermits Version: 11/26108 Project Bond Summary 23220 Edmonds Way Report Date: 11 /18/2014