234_King County BQW Spreadsheet_190522_progress.pdfSite Improvement Bond Quantity Worksheet S15 Web date: 04/03/201,1
LIM King County
Department of Permitting & Environmental Review
35030 SE Douglas Street, Suite 210
Snoqualmie, Washington 98065-9266
206-296-6600 TTY Relay 711
Project Name: GRE Edmonds, LILC
Location: 23400 Highway 99, Edmonds, WA 98026
Clearing greater than or equal to 5,000 board feet of timber?
yes
If yes,
Forest Practice Permit Number:
(RCW 76.09)
Page 1 of 9
234_King County BQW Spreadsheet-1 90522—progress
X no
For alternate formats, call 206-296-6600.
Date: 5/21/2019
Project No.: App #bId2O181622
Activity No.: Building Permit
Note: All prices include labor, equipment, materials, overhead and
profit. Prices are from RS Means data adjusted for the Seattle area
or from local sources if not included in the RS Means database.
Unit prices updated: 3/2/2015
Version: 3/2/2015
Report Date: 5/22/2019
Site Improvement Bond Quantity Worksheet S15 Web date: 04/03/201,1
Reference #
Unit
Price
Unit
Quantity
# of
Applications
Cost
EROSION/SEDIMENT CONTROL
Number
Backfill & compaction -embankment
ESC-1
$ 6.00
CY
Check dams, 4" minus rock
ESC-2
SWDM 5.4.6.3
$ 80.00
Each
5
1
400
Crushed surfacing 1 1/4" minus
ESC-3
WSDOT 9-03.9(3)
$ 95.00
CY
Ditching
ESC-4
$ 9.00
CY
Excavation -bulk
ESC-5
$ 2.00
CY
Fence, silt
ESC-6
SWDM 5.4.3.1
$ 1.50
LF
657
1
986
Fence, Temporary (NGPE)
ESC-7
$ 1.50
LF
600
1
900
Hydroseeding
ESC-8
SWDM 5.4.2.4
$ 0.80
SY
Jute Mesh
ESC-9
SWDM 5.4.2.2
$ 3.50
SY
Mulch, by hand, straw, 3" deep
ESC-10
SWDM 5.4.2.1
$ 2.50
SY
Mulch, by machine, straw, 2" deep
ESC-1 I
SWDM 5.4.2.1
$ 2.00
SY
Piping, temporary, CPP, 6"
ESC-12
$ 12.00
LF
Piping, temporary, CPP, 8"
ESC-13
$ 14.00
LF
70
1
980
Piping, temporary, CPP, 12"
ESC-14
$ 18.00
LF
Plastic covering, 6mm thick, sandbagged
ESC-1 5
SWDM 5.4.2.3
$ 4.00
SY
Rip Rap, machine placed; slopes
ESC-16
WSDOT 9-13.1(2)
$ 45.00
CY
Rock Construction Entrance, 50'xl5'xl'
ESC-17
SWDM 5.4.4.1
$ 1,800.00
Each
Rock Construction Entrance, 100'xl5'xl'
ESC-18
SWDM 5.4.4.1
$ 3,200.00
Each
2
1
6400
Sediment pond riser assembly
ESC-19
SWDM 5.4.5.2
$ 2,200.00
Each
1
1
2200
Sediment trap, 5' high berm
ESC-20
SWDM 5.4.5.1
$ 19.00
LF
Sed. trap, 5' high, riprapped spillway berm section
ESC-21
SWDM 5.4.5.1
$ 70.00
LF
1
1
70
Seeding, by hand
ESC-22
SWDM 5.4.2.4
$ 1.00
SY
Sodding, 1" deep, level ground
ESC-23
SWDM 5.4.2.5
$ 8.00
SY
Sodding, 1" deep, sloped ground
ESC-24
SWDM 5.4.2.5
$ 10.00
SY
TESC Supervisor
ESC-25
$ 110.00
HR
Water truck, dust control
ESC-26
SWDM 5.4.7
$ 140.00
HR
WRITE -IN -ITEMS **** (see_pAge 9)
Temporary Settling Tank
Each
1
1
Temporary Interceptor Swale
$ 15.00
LF
535
1
8025
Temporary Stabilized Construction Road
$ 15.00
S
170
1
255
Wheel Wash
$ 2,500.00
Each
1
1
2500
Inlet Protection
$ 250.00
Each
3,
1
7501
ESC SUBTOTAL:
30% CONTINGENCY & MOBILIZATION:
ESC TOTAL:
234_King County BQW Spreadsheet-1 90522—progress
$ 25,760.50
$ 7,728.15
$ 33,488.65
Unit prices updated: 3/2/2015
Version: 3/2/2015
Report Date: 5/22/2019
Site Improvement Bond Quantity Worksheet S15 Web date: 04/03/201,1
COLUMN: A
Page 2 of 9
Unit prices updated: 3/2/2015
Version: 3/2/2015
234_King County BQW Spreadsheet-1 90522—progress Report Date: 5/22/2019
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right -of -Way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant.
Cost
Quant.
Cost
Quant.
Cost
GENERAL ITEMS
No.
Backfill & Compaction- embankment
GI - 1
$ 6.00
CY
Backfill & Compaction- trench
GI - 2
$ 9.00
CY
Clear/Remove Brush, by hand
GI - 3
$ 1.00
SY
Clearing/Grubbing/Tree Removal
GI - 4
$ 10,000.00
Acre
1.27
12,700.00
Excavation - bulk
GI - 5
$ 2.00
CY
22850
45,700.00
Excavation - Trench
GI - 6
$ 5.00
CY
Fencing, cedar, 6' high
GI - 7
$ 20.00
LF
Fencing, chain link, vinyl coated, 6' high
GI - 8
$ 20.00
LF
Fencing, chain link, gate, vinyl coated, 2
GI - 9
$ 1,400.00
Each
Fencing, split rail, 3' high
GI - 10
$ 15.00
LF
Fill & compact - common barrow
GI - 11
$ 25.00
CY
50
1,250.00
Fill & compact - gravel base
GI - 12
$ 27.00
CY
Fill & compact - screened topsoil
GI - 13
$ 39.00
CY
Gabion, 12" deep, stone filled mesh
GI - 14
$ 65.00
SY
Gabion, 18" deep, stone filled mesh
GI - 15
$ 90.00
SY
Gabion, 36" deep, stone filled mesh
GI - 16
$ 150.00
SY
Grading, fine, by hand
GI - 17
$ 2.50
SY
Grading, fine, with grader
GI - 18
$ 2.00
SY
Monuments, 3' long
GI - 19
$ 250.00
Each
Sensitive Areas Sign
GI - 20
$ 7.00
Each
Sodding, 1" deep, sloped ground
GI - 21
$ 8.00
SY
Surveying, line & grade
GI - 22
$ 850.00
Day
Surveying, lot location/lines
GI - 23
$ 1,800.00
Acre
Traffic control crew ( 2 flaggers
GI -24
$ 120.00
HR
Trail, 4" chipped wood
GI - 25
$ 8.00
SY
Trail, 4" crushed cinder
GI - 26
$ 9.00
1 SY
Trail, 4" top course
GI - 27
$ 12.00
SY
Wall, retaining, concrete
GI - 28
$ 55.00
SF
100
5,500.00
Iwall, rockery
GI - 29
$ 15.00
SF
Page 3 of 9
SUBTOTAL
65,150.00
Unit prices updated: 03/02/2015
*KCC 27A authorizes only one bond reduction. Version: 03/02/2015
234_King County BQW Spreadsheet 190522progress Report Date: 5/22/2019
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant. Cost
I Quant, T Cost
Quant, T Cost
ROADIMPROVEMENT
No.
AC Grinding, 4'wide machine < 1000sy
RI - 1
$ 30.00
SY
AC Grinding, 4'wide machine 1000-2001
RI - 2
$ 16.00
SY
AC Grinding, 4'wide machine > 2000sy
RI - 3
$ 10.00
SY
AC Removal/Disposal
RI - 4
$ 35.00
SY
65
2,275.00
Barricade, type III ( Permanent
RI - 6
$ 56.00
LF
Curb & Gutter, rolled
RI - 7
$ 17.00
LF
Curb & Gutter, vertical
RI - 8
$ 12.50
LF
180
2,250.00
Curb and Gutter, demolition and disposa
RI - 9
$ 18.00
LF
180
3,240.00
Curb, extruded asphalt
RI - 10
$ 5.50
LF
Curb, extruded concrete
RI - 11
$ 7.00
LF
Sawcut, asphalt, 3" depth
RI - 12
$ 1.85
LF
245
453.25
Sawcut, concrete, per 1" depth
RI - 13
$ 3.00
LF
Sealant, asphalt
RI - 14
$ 2.00
LF
Shoulder, AC, ( see AC road unit price )
RI - 15
$ -
SY
Shoulder, gravel, 4" thick
RI - 16
$ 15.00
SY
Sidewalk, 4" thick
RI - 17
$ 38.00
SY
680
25,840.00
Sidewalk, 4" thick, demolition and dispos
RI - 18
$ 32.00
SY
330
10,560.00
Sidewalk, 5" thick
RI - 19
$ 41.00
SY
Sidewalk, 5" thick, demolition and dispos
RI - 20
$ 40.00
SY
Sign, handicap
RI - 21
1 $ 85.00
Each
Striping, per stall
RI - 22
$ 7.00
Each
Striping, thermoplastic, ( for crosswalk )
RI - 23
$ 3.00
SF
Striping, 4" reflectorized line
RI - 24
$ 0.50
LF
65
32.501
1
1
1
Page 4 of 9
SUBTOTAL
44,650.75
Unit prices updated: 03/02/2015
*KCC 27A authorizes only one bond reduction. Version: 03/02/2015
234_King County BQW Spreadsheet 190522progress Report Date: 5/22/2019
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant. Cost
Quant, F Cost
Quant, Cost
ROAD SURFACING
No.
K' Rock 2.5 base & 1.5" to) course) 9 1/2" Rock= 8" base & 1.5"' op course)
Additional 2.5" Crushed Surfacing
RS - 1
$ 3.60
SY
HMA 1/2" Overlay, 1.5"
RS - 2
$ 14.00
SY
HMA 1/2" Overlay 2"
RS - 3
$ 18.00
SY
HMA Road, 2", 4" rock, First 2500 SY
RS - 4
$ 28.00
SY
HMA Road, 2", 4" rock, Qty. over 2500 E
RS - 5
$ 21.00
SY
HMA Road, 3", 9 1/2" Rock, First 2500 E
RS - 6
$ 42.00
SY
HMA Road, 3", 9 1/2" Rock, Qty Over 2E
RS - 7
$ 35.00
SY
Not Used
RS - 8
Not Used
RS - 9
HMA Road, 6" Depth, First 2500 SY
RS - 10
$ 33.10
SY
HMA Road, 6" Depth, Qty. Over 2500 S)
RS - 11
$ 30.00
SY
H MA 3/4" or 1 ", 4" Depth
RS - 12
$ 20.00
SY
70
1,400.00
Gravel Road, 4" rock, First 2500 SY
RS - 13
$ 15.00
SY
Gravel Road, 4" rock, Qty. over 2500 SY
RS - 14
$ 10.00
SY
PCC Road (Add Under Write-ins w/Desil
RS - 15
1
1
1
1
IThickened Edge
I RS - 17
1 $ 8.60
LF
I
I
I
I I
Page 5 of 9
SUBTOTAL
1,400.00
Unit prices updated: 03/02/2015
*KCC 27A authorizes only one bond reduction. Version: 03/02/2015
234_King County BQW Spreadsheet 190522progress Report Date: 5/22/2019
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant.. Cost
Quant. Cost
----F Cost
Quant.
DRAINAGE (CPP= Corrugated Plastic Pipe, N12 or Equivalent) For Cull ert prices, Average of 4' cover was assumed. Assu e perforated PVC is same price a solid pipe.
Access Road, R/D
D - 1
$ 21.00
SY
Bollards - fixed
D - 2
$ 240.74
Each
Bollards - removable
D - 3
$ 452.34
Each
* (CBs include frame and lid)
CB Type I
D - 4
$ 1,500.00
Each
1
1,500.00
4
6,000.00
CB Type IL
D - 5
$ 1,750.00
Each
CB Type 11, 48" diameter
D - 6
$ 2,300.00
Each
1
2,300.00
5
11,500.00
for additional depth over 4'
D - 7
$ 480.00
FT
10
4,800.00
CB Type 11, 54" diameter
D - 8
$ 2,500.00
Each
for additional depth over 4'
D - 9
$ 495.00
FT
CB Type 11, 60" diameter
D - 10
$ 2,800.00
Each
for additional depth over 4'
D - 11
$ 600.00
FT
CB Type 11, 72" diameter
D - 12
$ 3,600.00
Each
for additional depth over 4'
D - 13
$ 850.00
FT
Through -curb Inlet Framework (Add)
D - 14
$ 400.00
Each
Cleanout, PVC, 4"
D - 15
$ 150.00
Each
12
1,800.00
Cleanout, PVC, 6"
D - 16
$ 170.00
Each
1
170.00
Cleanout, PVC, 8"
D - 17
$ 200.00
Each
Culvert, PVC, 4"
D - 18
$ 10.00
LF
1745
17,450.00
Culvert, PVC, 6"
D - 19
$ 13.00
LF
20
260.00
Culvert, PVC, 8"
D - 20
$ 15.00
LF
35
525.00
Culvert, PVC, 12"
D - 21
$ 23.00
LF
Culvert, CMP, 8"
D - 22
$ 19.00
LF
Culvert, CMP, 12"
D - 23
$ 29.00
LF
Culvert, CMP, 15"
D - 24
$ 35.00
LF
Culvert, CMP, 18"
D - 25
$ 41.00
LF
Culvert, CMP, 24"
D - 26
$ 56.00
LF
Culvert, CMP, 30"
D - 27
$ 78.00
LF
Culvert, CMP, 36"
D - 28
$ 130.00
LF
Culvert, CMP, 48"
D - 29
$ 190.00
LF
Culvert, CMP, 60"
D - 30
$ 270.00
LF
Culvert, CMP, 72"
D - 31
$ 350.00
LF
Page 6 of 9
SUBTOTAL
3,800.00
42,505.00
Unit prices updated: 03/02/2015
*KCC 27A authorizes only one bond reduction. Version: 03/02/2015
234_King County BQW Spreadsheet 190522progress Report Date: 5/22/2019
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
DRAINAGE CONTINUED
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
No.
Unit Price
Unit
Quant,
Cost
Quant.
Cost
Quant.
Cost
Culvert, Concrete, 8"
D - 32
$ 25.00
LF
Culvert, Concrete, 12"
D - 33
$ 36.00
LF
Culvert, Concrete, 15"
D - 34
$ 42.00
LF
Culvert, Concrete, 18"
D - 35
$ 48.00
LF
Culvert, Concrete, 24"
D - 36
$ 78.00
LF
Culvert, Concrete, 30"
D - 37
$ 125.00
LF
Culvert, Concrete, 36"
D - 38
$ 150.00
LF
Culvert, Concrete, 42"
D - 39
$ 175.00
LF
Culvert, Concrete, 48"
D - 40
$ 205.00
LF
Culvert, CPP, 6"
D - 41
$ 14.00
LF
Culvert, CPP, 8"
D - 42
$ 16.00
LF
Culvert, CPP, 12"
D - 43
$ 24.00
LF
Culvert, CPP, 15"
D - 44
$ 35.00
LF
Culvert, CPP, 18"
D - 45
$ 41.00
LF
Culvert, CPP, 24"
D - 46
$ 56.00
LF
Culvert, CPP, 30"
D - 47
$ 78.00
LF
Culvert, CPP, 36"
D - 48
$ 130.00
LF
Ditching
D - 49
$ 9.50
CY
Flow Dispersal Trench (1,436 base+)
D - 50
$ 28.00
LF
French Drain (T depth)
D - 51
$ 26.00
LF
Geotextile, laid in trench, polypropylene
D - 52
$ 3.00
SY
Mid -tank Access Riser, 48" dia, 6'deep
D - 54
$ 2,000.00
Each
Pond Overflow Spillway
D - 55
$ 16.00
SY
Restrictor/Oil Separator, 12"
D - 56
$ 1,150.00
Each
Restrictor/Oil Separator, 15"
D - 57
$ 1,350.00
Each
Restrictor/Oil Separator, 18"
D - 58
$ 1,700.00
Each
Riprap, placed
D - 59
$ 42.00
CY
Tank End Reducer (36" diameter)
D - 60
$ 1,200.00
Each
Trash Rack, 12"
D - 61
$ 350.00
Each
Trash Rack, 15"
D - 62
$ 410.00
Each
Trash Rack, 18"
D - 63
$ 480.00
Each
ITrash Rack, 21"
D - 64
$ 550.00
Each
Page 7 of 9
SUBTOTAL
Unit prices updated: 03/02/2015
*KCC 27A authorizes only one bond reduction. Version: 03/02/2015
234_King County BQW Spreadsheet 190522progress Report Date: 5/22/2019
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant.. Price
Quant. I Cost
----F Cost
Quant,
PARKING LOT SURFACING Not To Be Used For Roads Or Shoulders
hL0--
2" AC, 2" top course rock & 4" borrow
PL - 1
$ 21.00
SY
NA
NA
2" AC, 1.5" top course & 2.5" base coui
PL - 2
$ 28.00
SY
NA
NA
4" select borrow
PL - 3
$ 5.00
SY
NA
NA
1.5" top course rock & 2.5" base course
PL - 4
$ 14.00
SY
NA
NA
UTILITY POLES & STREET LIGHTING Utility pole relocation costs must be accompanied by Franchise Utility's Cost Estimate
Utility Pole(s) Relocation
UP-1
Lump Sum
i
I
I
I
I
I
I
Street Light Poles w/Lurninaires
UP-2
$ 7,500.00 1 Each
1 31
$ 22,500.00
1
1
1
1
1
WRITE -IN -ITEMS
(Such as detention/water quality vaults.)
hL0--
Stormwater Vault
WI - 1
$ 380,000.00
Each
1
380,000.00
Block Wall
WI - 2
$ 16.00
SY
Yard Drain
WI - 3
$ 400.00
Each
4
1,600.00
Temporary Shoring Wall
WI - 4
LS
4" DI Pipe
WI - 5
$ 30.00
6" DI Pipe
WI - 6
$ 40.00
LF
12" DI Pipe
WI - 7
$ 125.00
LF
395
49,375.00
Trench Drain
WI - 8
$ 40.00
LF
34
1,360.00
wl - 9
Each
wl - 10
Each
wl - 11
Each
WI - 12
Each
WI - 13
Each
WI - 14
Each
SUBTOTAL
SUBTOTAL (SUM ALL PAGES):
30% CONTINGENCY & MOBILIZATION:
GRANDTOTAL:
COLUMN:
*KCC 27A authorizes only one bond reduction.
234_King County BQW Spreadsheet 190522progress
22,500.00
72,350.75 539,990.00
21,705.23 161,997.00
94,055.98 701,987.00
B C D
Unit prices updated: 03/02/2015
Version: 03/02/2015
Report Date: 5/22/2019
Site Improvement Bond Quantity Worksheet Web date: 04/03/2015
Page 8 of 9
Unit prices updated: 03/02/2015
*KCC 27A authorizes only one bond reduction. Version: 03/02/2015
234_King County BQW Spreadsheet 190522progress Report Date: 5/22/2019
Site Improvement Bond Quantity Worksheet
Original bond computations prepared by
Web date: 04/03/2015
Name: Joe Taflin Date: 5/21/2019
PE Registration Number: 41871 Tel. #: 425.458.7900
Firm Name: Navix Engineering
Address: 11235 SE 8th Street, Suite 150; Bellevue, WA 98004 Project No: App #bId20181622
Stabilization/Erosion Sediment Control (ESC)
Existing Right -of -Way Improvements
Future Public Right of Way & Drainage Facilities
Private Improvements
Calculated Quantity Completed
Total Right -of Way and/or Site Restoration Bond*/**
(First $7,500 of bond* shall be cash.)
Performance Bond* Amount (A+B+C+D) = TOTAL
Maintenance/Defect Bond* Total
NAME OF PERSON PREPARING BOND* REDUCTION:
(A)
(B)
(C)
FINANCIAL GUARANTEE REQUIREMENTS
PERFORMANCE BOND* MINIMUM BOND* AMOUNT PUBLIC ROAD & DRAINAGE
AMOUNT REQUIRED FOR RECORDING OR MAINTENANCE/DEFECT BOND*
TEMPORARY OCCUPANCY AT
$ 33,488.7 SUBSTANTIAL COMPLETION
$ 94,056.0
(D) $ 701,987.0
(A+B) $ 127,544.6
(T) $ 829,531.6
Minimum is $2000.
T x 0.30 $ 248,859.5
Minimum is $2000.
Date:
(B+C) x
0.25 = $ 23,514.0
Minimum is $2000.
NOTE: The word "bond" as used in this document means a financial guarantee acceptable to King County.
NOTE: KCC 27A authorizes right of way and site restoration bonds to be combined when both are required.
The restoration requirement shall include the total cost for all TESC as a minimum, not a maximum. In addition, corrective work, both on- and off -site needs to be included.
Quantities shall reflect worse case scenarios not just minimum requirements. For example, if a salmonid stream may be damaged, some estimated costs for restoration
needs to be reflected in this amount. The 30% contingency and mobilization costs are computed in this quantity.
NOTE: Per KCC 27A, total bond amounts remaining after reduction shall not be less than 30% of the original amount (T) or as revised by major design changes.
REQUIRED BOND* AMOUNTS ARE SUBJECT TO REVIEW AND MODIFICATION BY KING COUNTY
Page 9 of 9 Unit prices updated: 03/02/2015
Check out the DDES Web site at www.kinacountymoylperm Version: 03/02/2015
234_King County BQW Spreadsheet-190522_progress Report Date: 5/22/2019