Loading...
235th Pl SW-10506_pln20080010_Steinman_2 lot SP civil.pdfPLN20080010 Steinman SP, Civil Review City of Edmonds 121 5T" AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORKS DEPARTMENT Engineering Division Civil Plan Review Comments Subdivision Application #: PLN20080010 Date: July 25, 2008 Project Name/Address: Steinman SP / 10506 235th PI SW 2-lot Short Plat Contact Person/Address, Fax or E-mail: Ron Steinman / oshunroamer@aol.com Reviewer: Jeanie McConnell Division: Engineering During review of the civil drawings for the proposed subdivision it was found that the following information, corrections, or clarifications will need to be addressed. Please resubmit 3 copies of the revised civil drawings and associated documents with a written response to each item to an Engineering Technician. Please contact me at 425-771-0220 or by e-mail at mcconnell @ ci.edmonds.wa.us if you have specific questions regarding these plan corrections. GENERAL 1. Please provide an itemized cost estimate for both on -site and off -site (right-of-way) improvements, including traffic control. • If you would like to place a bond for the improvements to be done so that you may record the subdivision you may do so. The amount of the bond will be based on 120% of the City approved estimate for all improvements. The City will inform you of the appropriate bond amount after review approval of the cost estimate. You may contact Conni Curtis at our office to obtain a copy of the performance bond form. She can be reached by e-mail at curtis@ci.edmonds.wa.us • Inspection fees for this project will be calculated at 2.2% of the 120% City approved estimate for all improvements. 2. Please submit a traffic control plan for review and approval. 3. 1 am in receipt of the letter dated June 5, 2008 from Rob Long, P.E. of LSA requesting a waiver from the 235th PI SW asphalt widening short plat requirement. City staff has reviewed the request and determined a waiver from the requirements will not be granted. The existing pavement width of 235th PI SW does not meet City standards. The requirement to widen the section of the roadway adjacent to the subject short plat will bring this section of roadway into compliance for a 2-lane roadway. 4. For your records, please find enclosed a copy of the sidewalk construction waiver that was approved by the City on April 14, 2008. 5. The civil construction drawings are currently being reviewed by the City Planning Division and additional comments will follow these plan corrections. 6. A civil plan review fee of $860 shall be paid to the City prior to continued plan review on this project. DATE E-MAILED. 7/25/08 PAGE(s) I of 2 PLN20080010 Steinman SP, Civil Review DEVELOPMENTPLAN 1. Please show the required 235th PI SW road widening on the civil drawings. 2. Add a note that the existing house will be removed or revise the location of the storm drainage easement so it is located outside the footprint of the existing house. 3. Indicate driveway surface material for the existing driveway on Lot 1. At a minimum, a driveway approach shall be provided to Lot I and shall be paved a minimum of 20' from the edge of pavement on 235th PI SW. 4. If the existing house is to be removed, please label the storm stub location for Lot 1. 5. For clarity, please revise the note "Offsite storm system to be completed by public works contract" to state "offsite storm system to be completed under separate City of Edmonds project. 6. Incorporate ESC notes verbatim from ECDC 18.30.050 on the plans. 7. Please revise ESC & BMP Note #9 to only allow protection of catch basins by use of a filter sock only per City standard detail E 1. 1. 8. Please revise Construction Sequence Note #1 to state phone extension 1326 along with the phone number. 9. Please also revise general Notes #4 to state phone extension 1326 along with the phone number. 10. Individual storm detention/infiltration systems are not required on Lots 1 & 2 due to owners agreement with the City to construct the public storm pipe through the subject property. If the public storm system is not constructed, individual storm systems will need to be designed and constructed with each new home. Please add a note to the plans indicating such. 11. Please note on the plans that separate permits are required for the demolition of existing building structures as well as for the construction of any new building structures. 12. Show approved Post Office location for the mailboxes or mailbox cluster. 13. Please revise approval block to state Engineering Division instead of City Engineer. DATE E-MAILED. 7/25/08 PAGE(s) 2 of 2