Loading...
235th Pl SW-10506_pln20080010_Steinman_2 lot SP civil_2.pdfPLN20080010 Steinman SP, Civil Review City of Edmonds 121 5T" AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORKS DEPARTMENT Engineering Division Civil Plan Review Comments Subdivision Application #: PLN20080010 Date: October 8, 2008 Project Name/Address: Steinman SP / 10506 235th PI SW 2-lot Short Plat Contact Person/Address, Fax or E-mail: Ron Steinman / oshunroamer@aol.com Reviewer: Jeanie McConnell Division: Engineering During review of the civil drawings for the proposed subdivision it was found that the following information, corrections, or clarifications will need to be addressed. Please resubmit 3 copies of the revised civil drawings and associated documents with a written response to each item to an Engineering Technician. Please contact me at 425-771-0220 or by e-mail at mcconnell @ ci.edmonds.wa.us if you have specific questions regarding these plan corrections. I st Review - July 25, 2008 2 nd Review — October 8, 2008 The City is currently working towards an easement agreement for the City storm drainage system to be located between Lot 1 and Lot 2, as shown on the civils that were submitted for the I st review. The comments provided below should address all items necessary to allow for approval of the revised civils once submitted. GENERAL 1. 10/8/08 — Thank you for submitting the cost estimate. Please revise estimate to provide a breakdown of on -site and off -site (right-of-way improvements) and to include costs for all applicable elements. Currently, some of the items do not have costs associated with them and are shown as "by others" or "budget". 7/25/08 - Please provide an itemized cost estimate for both on -site and off -site (right-of-way) improvements, including traffic control. • If you would like to place a bond for the improvements to be done so that you may record the subdivision you may do so. The amount of the bond will be based on 120% of the City approved estimate for all improvements. The City will inform you of the appropriate bond amount after review approval of the cost estimate. You may contact Conni Curtis at our office to obtain a copy of the performance bond form. She can be reached by e-mail at curtis@ci.edmonds.wa.us • Inspection fees for this project will be calculated at 2.2% of the 120% City approved estimate for all improvements. 2. ok 3. ok 4. ok 5. ok DATE E-MAILED. 10/8/08 PAGE(s) I of 2 PLN20080010 Steinman SP, Civil Review 6. ok DEVELOPMENTPLAN 1. ok 2. A 3. ok 4. ok 5. ok 6. ok 7. ok 8. A 9. A 10. 10/8/08 — Plans submitted do not show the City storm system and instead show the individual storm detention systems. Please revise to show the City storm system with a storm stub to each lot. 7/25/08 - Individual storm detention/infiltration systems are not required on Lots I & 2 due to owners agreement with the City to construct the public storm pipe through the subject property. If the public storm system is not constructed, individual storm systems will need to be designed and constructed with each new home. Please add a note to the plans indicating such. 11. ok 12. ok 13. ok DATE E-MAILED. 10/8/08 PAGE(s) 2 of 2