Loading...
235th_PL_SW-10506_Steinman_SFR_BLD20080269.pdf City of Edmonds BLD 20080255 TH 121 5 AVENUE NORTH EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORKS DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments Permit Application :Date: # BLD20080269 5/06/08 th Project Name/Address: Steinman – 10506-235 PL SW Contact Person/Address, Fax or E-mail: Ron Steinman – oshunroamer@aol.com Reviewer: JENNIFER COLLINS Division: ENGINEERING During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts referred to in these comments can be accessed at our website: www.ci.edmonds.wa.us under City Government / Development Services Department / Engineering Division then scroll down to Handouts: As preliminary approval has not been granted for short plat and civils have not been submitted and / or approved for development. This application will be reviewed as a single family residence only. Please note additional improvements may be required with short plat. 1)Utility Plan – needs to be consistent with site plan – removing existing house, showing only one lot, etc. Revise sheet title as this is not the preliminary development plan. 2)Two water meters are shown. Will existing meter be removed / abandoned? 3)Clearly show sewer for new house and existing portions to be removed. Label future stubs accordingly. Obtain approval from Olympic View Water & Sewer District to reuse existing lateral for your side sewer. 4)Show all cleanouts with the invert elevations. Cleanouts need to located at all 90 degree bends, property line, at the home, and every 100’ from the previous cleanout. 5)Show a 6” cleanout at the property line with a 12” cast iron lamphole cover. 6)Show Show the water service line from the meter to the house. 7)Only one driveway access shall be provided to the new residence. Please remove existing driveway. 8)Entire property needs to be shown on the erosion and sediment control plan. Erosion control will also need to be in place for the demolition of the existing home and removal of the existing driveway. DATE E-MAILED 5/7/08 PAGE() 1 City of Edmonds BLD 20080255 TH 121 5 AVENUE NORTH EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORKS DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments 9)Provide grading calculations. Show bottom and footing elevations for each step, if any, in the foundation to determine grading quantities. Also show existing and proposed contours. Storm Water Our storm water engineer, Don Fiene, is in contact with LSA, your engineer for this project, to discuss obtaining an easement for city storm system. Storm drainage requirements for this property will be determined once this has been resolved. Please resubmit 3 copies of the revised site drawings and associated documents with a written response to each item to an Engineering Technician. Please contact me at 425-771-0220 ext 1321 or by e-mail at collinsj@ci.edmonds.wa.us if you have specific questions regarding these plan corrections. DATE E-MAILED 5/7/08 PAGE() 2