Loading...
236 Edmonds Modular pre-app questions.pdfJACKSON I MAIN Rim A R C H IT ECT U RE June 17, 2019 City of Edmonds — Development Services Department 121 5t' AVE N Edmonds, WA 98020 RE: Edmond Modular — Pre -Application Questions To whom it may concern, On behalf of Blackfish Capital and the rest of the Project team, we are requesting a Pre-Appication Meeting to review the preliminary design of a new multi -family development at the intersection of Highway 99 and 236 1h St. The following is a list of questions the team would like addressed at our th upcoming pre-app meeting on June 27 • Confirm Highway 99 is primary frontage and 236 th is secondary. th? • What are the glazing requirements on 236 . • Confirm glazing requirements along the primary frontage (Highway 99) o How would these requirements be applied to the South Building, considering its varied proximity to the property line/street frontage? • The team assumes the blank fagade requirements will apply to the exposed portions of the 1h garage elevations along 236 o Are there any other specific land use requirements for the 236 th fagade? th • Please confirm sidewalk requirements along 236 • Please Confirm Street improvement requirements along HWY 99 • the existing 4 curb cuts are proposed to be eliminated (all site access will be off of 236 th) • Will any additional pedestrian amenities/improvements be required as related to the intersection of HWY 99 and 236 th (i.e. crosswalk improvements, etc). • Confirm Average Height calculation shown conforms with city standard. • Are there any additional land use/design standards that may impact this project, as related to the Highway 99 Development Corridor comprehensive plan designation? • Please confirm that parking calculations and layout strategy are complaint with City requirements. • Confirm SEPA is required. • Please note and discuss Fire lane and access planned along Eastern edge with a 24' wide fire lane • Per avg. grade plane will top occupied floor be considered high rise with access from fire lane? • Are there any other emergency vehicle access requirements that may impact this site layout? • What are the park impact fees for this project? • What are the traffic impact fees for this project? • What are the sewer connection fees for this project? JACKSON I MAIN ARCHITECTURE, P.S. 311 FIRST AVENUE SOUTH, SEATTLE, WA 98104 206.324.4800 JACKSONMAIN.COM JACKSON I MAIN Rim A R C H IT ECT U RE • What are the stormwater fees for this project? • What stormwater standards apply for this project? • What are the requirements for the traffic engineer? • What are the current rental rates for the MFTE program? Thank you, we look forward to speaking. If you require additional information before the meeting, please feel free to reach out. Sincerely, John A. hAoretielcl AIA Architect, Jackson I Main Architecture 2 JACKSON I MAIN ARCHITECTURE, P.S. 311 FIRST AVENUE SOUTH, SEATTLE, WA 98104 206.324.4800 JACKSONMAIN.COM