2367_001.pdfSeptember 16, 2019 City of Edmonds Development Services Department 121 5th Ave N Edmonds, WA. 98020 RE: Permit Number: Project Name: TEC Project Number: Address: Special Inspection FINAL SUMMARY REPORT BLD20190762 Dustin Residence Foundation Repair 19001.16 21816 84th Ave W, Edmonds, WA 98026 Dear Department of Permitting Services, This letter serves to certifythat in accordance with Chapter 17 of the International Building Code requirements outlined in the General Structural Notes of S-1.00 of the approved permit drawings, Tower Engineering Company has performed structural observation and special inspection as detailed below. Per the City of Edmonds, the project requires Structural Observation, and special inspection of both the Push Pier and Smart Jack installation. The inspector observed the installation of (9) FS1 288 push pier, verifying pier locations, installation depth, installation pressure, bracket type, pier type, pier diameter and thickness. To confirm pier capacity, loads were observed following installation and the results were within approved allowances. Please see the attached field installation logs and load test data, dated 9/10/2019. All piers were installed per the intent of the design drawings and any installation deviations were reviewed and approved by this office with no outstanding non-compliance items. Additionally, TEC verify the installation of the (5) Smart Jacks and the added 46 beam line. The as -built beam and Smart Jack locations and installation are acceptable and consistent with the design intent. As Engineer of Record, TEC was on site for the pier installation and observed the final condition of the Smart Jacks and added beam line, thus satisfying the need for Structural Observation. Our inspection and testing services do not constitute a warranty or guarantee of any type and were provided and intended to help reduce the risk of construction defects, deficiencies or omission that may arise during and after construction. It is the contractor's responsibility to perform their work in accordance with approved construction documents. All inspections and tests were performed and reported according to the requirements of the City of Edmonds and, to the best of my knowledge, the work was in conformance with the applicable workmanship provisions of the Washington State Building Code and StaW_4L4&. _ Lundqulgr, PEIP11de President Terry, W I Sjfeclal Inspector Cc: Ayden Wagner, Matvey Foundation Repair TOWER ENGINEERING COMPANY 21907 64th Avenue West, Suite 140, Mountlake Terrace, ytl FIELD INSTALLATION LOG TEC 21907 64th Ave. W, Suite 140 Mountlake Terrace, WA 98043 ENO NEERINO I I C� CD M PA, N Y (425) 640-2266 Fax (425) 640-5665 Proj. Name: V 5 f 'I Contractor: Site Address: c2 Vj, Proj. Foreman: Permit No. Contractor Arrival: 0-0 Jurisdiction: Inspector Name: Oct, /a rt/-�- w Install Date: cc) Inspector Arrival: PierWall Pier Segment Installation Thickness, in Length, in Pressure, psi Location Part Description Pier OD, in 4 + 975 50-0 b �r 134 247-S V5 ('14d Y, 11) �Z3 0 �4 cet (9 4-cc t�kev-e, _1�5 C�o ft 40� (2 OC) (5-5) Non -Compliance Items: Inspectors Signature: FIELD INSTALLATION LOG TEC 21907 64th Ave. W, Suite 140 Mountlake Terrace, WA 98043 ENO NEERING if C> M F-,a, N Y (425) 640-2266 Fax (425) 640-5665 Proj. Name: IOU � �f�' Contractor: Site Address: Proj, Foreman: Permit No. P1 - %J Loo c)?Iq 076) Contractor Arrival: Jurisdiction- Mzl' 5 Inspector Name: 1 4rt I I f I rw Y, VE Install Date: 6z I Inspector Arrival - Location Part Description Pier CD, in Pier Wall Thickn ess, in Pier Segment Lenah, in Installation Pressure, psi , 6sz-�q 1 -c y­p� r�. 9-7 tqoro Y4 r jit,' -eve, 15a 0 010-60 Non -Compliance items: Inspectors Signature: Load Test Log TEC 21907 64th Ave. W, Suite 140 Mountlake Terrace, WA 98043 ENGINEERING I C�C>KAP,4�NY (425) 640-2266 Fax (425) 640-5665 Proj. Name: OL25 4 r 1 1) Contractor: /11" e, �� V Site Address: 5��" Arr lj�)M a12 5 � 7 �_OZ Proj. Foreman: Vvrl Test Date (7/( 6( Permit No. : OL Z'-1 a I, Inspector Name: f I T-:e Jurisdiction: L_��M 1717 OIS Pier Test: Test Pressure, psi: 1500 Working Load, Kips: Total Creep, in: Y* A mc) Test Load, kips: J-3 1 min: Y*/1 W 5 min: Y4- A OU 0 15 min: 40 min: 2 min: 6 min: 20 min: 50 min: CL A o Y4- AO r L7 3 min: 10 min: 30 min: 60 min: U Y4 Alcicro 4noo 4 min: 4 lltrov Pier Test: Test Pressure, psi: 50 0 Working Load, Kips: Total Creep, in: 0 -Z Test Load, kips: 1 min: A 5 min: 15 min: 40 min: 2 min: 6 min: 20 min: 50 min: 0 A 0 t) 0 Aarjo cu cu b 3 min: 0 /1(106 10 min: 30 min: 60 min: 4 min: Continuous special inspection is required during the installation per 2015 IBC section 1810.4.12. Load testing shall be performed in accordance with ASTM Method D1143 (Quick Method). 20 percent of piers shall be tested to 150 percent design load. Load testing creep acceptance criteria shall be no greater than 0.04 inches within a 10 minute period. If movement is observed greater than 0.04 inches within the 10 minute period the load test shall be held for an additional 50 minutes, the pier is to be deepened and re -tested, or the pier is to be abandoned and replace with a new pier. If the load test is to be held the pier movements shall be measure at 15, 20, 30, 40, 50, and 60 minutes. The creep versus the logarithm of -time shall be plotted. If the creep rate is lessthen 0.080 inches between 6 and 60 minutes, the load test shall be considered successful. Non -Compliance Items: Note: Load test performed utilizes a hydralic load cylinder with an effective bore diameter of 3.5" which equates to an operating hydraulic area of 9.62 In 2* Pier Test Pressure (psl)=[Design Load] X 1.5 / 9.62in' Inspectors Signature: