Loading...
2637_001.pdfrPACE An Engineoring Sery1ces Company D wX Z:A October 8, 2019 City of Edmonds Attn: Jeanie McConnell 121 5th Avenue North Edmonds, WA 98020 Jenkins Lane Lot I — Single Family Residence #BLD20191013 I st Review — Response to Comments Dear Jeanie: Engineers I Planners I Surveyors We are pleased to resubmit the attached Site Plan set for further review and approval. These plans are submitted in response to the 1st Site Plan Review from both Planning and Engineering. The following is a summary of responses to the review comments contained on the plan set and comment letters. Review comments are shown in plain text and our responses are provided in bold italics. Comments from Jeanie McConnell (�eanie.mcconiieliCcbedi-nondswa.gov): General A Stormwater Covenant is required to be recorded against the property based on the proposed stormwater facilities for the project. Please complete the covenant, including notarization and any required exhibits and submit to the city. Ensure the stormwater covenant meets Snohomish County Record Drawing requirements. The document must be complete but will not be recorded prior to permit issuance. Prior to construction final, location of facilities are to be verified (by field inspection and asbuilt) and then the covenant will be recorded. Attached 2. Submit Side Sewer Permit Application form. Attached Sheet 2 of 3 — UTILITY AND TESC PLAN Clarify Note 1 to state that the storm tightline shall not be connected to the footing drains any closer than 1 0-ft from the foundation. Revised note. RESUB OCT 17 2019 BUILDING DEPARTMENI CfTY OF EDMONDS PACE Engineers, Inc I SDA 1724 W Marine View Drive I Suite 140 Everett, Washington 9820 1-2088 p 425 486 6533 1 f 425 486 6593 www paceengrs corn October 8, 2019 Engineers I Planners I Surveyors City of Edmonds Page 2 of 9 www paceengrs.com 2. Clarify Note 13 so it is clear the 'Ift minimum cover does not apply to water and sewer. Sewer shall have 2ft of cover and water shall have 18" cover, regardless of location being in paved or landscaped area. Revised note. 3. Orange protective barrier fencing shall be placed around the area of the drywell locations to protect the area from compaction. Show on plans. Added to construction sequence and shown on utility plan. Sheet 3 of 3 — PLAN NOTES 1. Revise General Note 1 to reflect the current version of the WSDOT/APWA specs. Revised note. 2. Remove General Note #19. It is not applicable to this project. Removed note. Comments from Stormwater Engineer, Zack Richardson (zacka ry rich a rdson (a-)ed mondsma. gov): 1. It appears the proposal for this lot has increased the impervious area and decreased the drywall volume since the previous plat approval; the minimum value now used (by simplified sizing) meets code but represents a revision from the previously approved drainage plan which requires additional attention [Comment truncated for brevity] (a) Simplified sizing to meet MR #5 does not ensure that a regular overflow will not occur here; for this reason these systems require a piped overflow. If system remains as currently designed, update plans to provide a piped overflow connection to the city system. (b) Alternatively, the applicant can demonstrate that the system achieves 100% infiltration, typically requiring a WWHM model with the field measured infiltration rate. Design calculations have been provided as an attachment to this letter, to satisfy alternative (b) above. The calculations demonstrate 100% inffitration of roof runoff. CPAC�) October 8, 2019 Engineers I Planners I Surveyors City of Edmonds Page 3 of 9 www.paceengrs com 2. Show protective construction fencing around the drywell areas. (a) If fencing cannot be feasibly located during construction, add notes to over excavate and obtain geotech approval of the subgrade prior to backfilling drywells. C.ailed OUt in construction sequence and adripri fn Wilitv plan. 3. Provide detail or specification enough for contractor to install soils meeting the requirements of BIVIP T5.13 (City detail SD-642). Detail SD-642 has been added to sheet 4 of 4. 4. Update drywell details to be SD-638 or update plan details to provide more of the required and shown elements from the City version: (a) Update "marked center" to provide an observation pipe to the bottom of the facility with detail as/where needed for construction. (b) Extend distribution pipe through entire width of drywell and bring to surface with clean -out with detail as/where needed for construction. (c) Callout/show a push -on tee or downturned elbow in the yard drain upstream of the drywells with detail as/where needed for construction. (d) Identify 12" minimum cover depth, provide a bottom of rock elevation, and ensure the two are consistent with proposed finish grade. (e) Identify the top and bottom of rock elevation for each drywell. The requested revisions have been made. 5. Show dimensions between the drywell and property lines (min F). Dimensions have been added. 6. Provide a minimum footing drain elevation to ensure perforated portions of the footing drains remain a minimum of 6" above top of rock for the infiltration facility, or revise footing drain connection to be un effected by infiltration storage. Minimum footing drain elevation is specified on Sheet 2 of 4. The attached drainage calculations demonstrate that the stage depth in the infiltration galleries is not likely to reach the top of the provided galleries. 7. There do not appear to be any collection point for pervious areas and the grading plan may direct more runoff toward the adjacent road and wall to the west; update plans and/or provide response to address concern as appropriate (infiltrates before it can reach edge, revise grading to retain runoff, or add collection point and adjust drywell). Roof drain cleanouts have been revised to area drains, and slope arrows show the yard draining toward those yard drains. Given that outwash soils underly the site, and the topsoil specification provided on Sheet 4 of 4, most runoff is likely to infiltrate before reaching the yard drains. CPJiCE� W ON IN October 8, 2019 Engineers I Planners I Surveyors City of Edmonds Page 4 of 9 www.pac.cengrs.com This concludes our response to the previous review letter. Please feel free to call with any questions (425) 486-6533, or if I can provide anything further. Sincerely, PACE Engineers, Inc. /ZW - //�� � �Iel� � Kenneth J. McIntyre, PE Project Manager CPA�C