Loading...
2745_001.pdfB BEYLER C ON S U L T ING October 23, 2019 JoAnne Zulauf, Engineering Technician City of Edmonds 121 5th Ave N, Edmonds, WA 98020 Phone: 425-771-0220 RE APPLICATION # BLD20181466 PROJECT: CHUNG - SINGLE FAMILY RESIDENCE PROJECT ADDRESS: 725 EDMONDS WAY LOT 2 DearJoAnne, '-;Canrleol RESUB OCT 2 S 2019 3 DEPARTMENT "U'R' C 6F EDMONDS Please find attached revised site plans, which reflect the changes as requested in the plan review dated August 20, 2019. Our response to each comment is shown below in bold. NEW COMMENT 1. The purveyor for sewer is listed as OVWSD on sheet C1.0 should be COE. This has been updated. 2. The 4" side sewer clean out at the house should be as close to a 2 ft distance to the house as possible. While 2ft may not be possible, please relocate the clean out closer to the house avoiding structures and sidewalk. The clean out has been moved closer to the house. GENERAL 4. Submit side sewer permit application. Owner to submit application. 11. 8.20.19 A Stromwater Covenant is required. The Covenant is included with this submittal. TESC 2. Construction entrance is to protect the right of way from debris. It should be located at the entrance of the short plat on Lot 3. The area where the construction entrance is shown now is proposed to have pervious pavement. Outline the area and make note that heavy equipment should avoid the area as much as feasible. Show construction entrance on the plans and incorporate and reference New City standard details. The construction sequence of the homes has been determined. We propose to keep the construction entrance, but added notes to protect the subgrade and geotechnicall supervision. LAKEWOOD OFFICE 5920 100111 St SW, Ste #25 Lakewood, WA 98499 phone: 253-301-4157 fax: 253-336-3950 Plan. Design. Manage CIVII & 5 1 RUCI URAL ENGINEERING I LAND SURVEYING I PLANNING PROJECT MANAGEMENT I FEASIBILITY I PERMIT EXPEDITING Sincerely, W���7 Mark Keller, P.E. & Page 2 of 2 BEYLER 00 N'Z U L T I N 0