2747_001.pdfB BEYLER CONSULTING October 23, 2019 JoAnne Zulauf, Engineering Technician City of Edmonds 121 5 th Ave N, Edmonds, WA 98020 Phone: 425-771-0220 RE- APPLICATION # BLD20181098 PROJECT: CHUNG — SINGLE FAMILY RESIDENCE PROJECT ADDRESS: 721 EDMONDS WAY LOT I DearJoAnne, -iconrlen RESUB OCT 2 9- 2019 " BUILDiNG DEPARTMENT CITY OF EnMONEXS Please find attached revised site plans, which reflect the changes as requested in the plan review dated August 20, 2019. Our response to each comment is shown below in bold. NEW COMMENTS 1. The change to the location of the water line was not updated on sheet AO. We have coordinated with the architect and it is out understanding that the architect has updated the waterline on Sheet AO. 2. The purveyor for sewer is listed as OVWSD on sheet C1.0 should be COE. Updated GENERAL 4.Submit Side Sewer Permit Application form Owner to submit applications. 10. 8.20.19 Rockery is shown on plan sheet AO. Needs to be shown on all plans and must include top and toe elevations for each end of rockery and at every 2 ft of change. The architectural plans included a "non -prohibited rockery" of 2' of less. We have added that to the civil plans and referred to the architectural plans for the details. 11. 8.20.19 Still outstanding. A Stormwater Covenant is required to be recorded... Stormwater Covenant is included with this submittal. LAKEWOOD OFFICE 5920 100th St SW, Ste #25 Lakewood, WA 98499 phone: 253-301-4157 fax: 253-336-3950 Plan. Design. Manage CIVIL & STRUC(URAL ENGINEERING I I -AND SURVEYING I PLANNING PROJECT MANAGEMENT I FEASIBILITY I PERMIT EXPEDITING TESC 4. 8.20.19 Entrance must be perpendicular to Edmonds Way for a minimum of 20 ft. In reviewing the Geotech report, there are provisions for installing the construction entrance, please show per report. 3.25.19 Future location of pervious pavement should be protected to the extent possible. Please add fence to part of it at least. Orange protective barrier fencing shall be placed at the drip line of trees to remain and around areas proposed for low impact development techniques, such as rain gardens, infiltration systems, etc., to protect the area from compaction. The construction entrance has been revised and a not added for the protection and inspection of the subgrade. STORM 2. 8.20.19 Stormwater engineer will address if overflow discharge is not acceptable. If it is acceptable then this comment is satisfied. 3.25.19 Show where the footing drains will discharge. There was no comment from the stormwater engineer, so we consider this satisfied. Thank you for your time and assistance in the review of this project. Should you need any additional information, please do not hesitate to contact me at 253-984-2900 or via email at mkeller@beylerconsulting.com. Sincerely, W��� Mark Keller, P.E. 9: Page 2 of 2 BEYLER CON'Z�i LT�2'4 0