2858_001.pdfRAM Engineering November 7, 2019 City of Edmonds Development Services Department 1215 th Avenue North Edmonds, WA 98020 RE: Select Lot 8 of Westhaven Plat Plan Check BLD20191176 1't Engineering Site Plan Review Comment Response RAM Job No. 17-038 Staff: This letter outlines the revisions and corrections made per Staff review. Below is a list of the comment response documents addressing the comments and requests: Engineering Comments: JoAnne Zulauf letter dated October 10, 2019 GENERAL 1) Please submit a Side Sewer Pennit Application form. Response: Application Attached TESC 1) Please add note that plat tesc will be maintained during sfr construction or provide a tesc plan for the sfr. Response: Added note to plan. SEWER 1) Provide invert elevation at the sewer stub. Response: Added invert to plan. STORM 1) Show where the retaining wall drainage will discharge to. Response: Added retaining wall drywell to plan. 2) There is no connection from the perf stub out to the plat drainage stub out. Response: connection is to storm stub provided as part of plat construction. if there are any questions regarding the items above, please contact me at your earliest convenience; I can be reached at (425)678-6960 or RobL@RAMengineeringinc.com. Thank you, 1�3- RESUB Rob Long, PE NOV 12 2019 Principal REUILDING DEPARTMEN1 CITYOF EDMONDS RAM Engineering 16531 13'h Ave W, Suite A108 Lynnwood WA 98037 (425) 678-6960 RAMengineeringinc.com RAM Engineering Memorandum To: City of Edmonds Engineering Division c/o Zach Richardson, PE Stormwater Engineer 121 5th Avenue North Edmonds, WA 98020 From: Rob Long, PE RAM Engineering 16531 13th Ave W, Suite A108 Lynnwood WA 98037 Subject: Select Homes: Westhaven Plat, Plan Check PLN20180034 Project Allowable Lot Impervious Allocation Revision RAM Job No. 17-038 Date: Novernber-7-, 2019 This letter provides a revision to the allowable lot hard (impervious) surface allocation for the Westhaven plat. The original plat design included a total new and replaced hard surface of the project at 51,200 sf, of which 42,000 sf of the area was allocated to impervious on the lots. The applicant would like to revise the hard surface allocation for each individual lot to support the building permit application for each lot. The following table provides the requested reallocation and demonstrates that then revised numbers will not exceed the original approved hard surface allocation of 42,000 sf for the lots. The new revised lot allocation will be 500 sf less than the original 42,000 sf design. Westhaven Individual Lot Hard Surface Allocation: Lot Impervious Lot Impervious 1 4,200 6 4,750 2 4,100 7 3,850 3 4,200 8 3,500 4 4,000 9 4,800 5 3,900 10 4,200 Total Lot Impervious Allocation = 41,500 sf If you have any questions or need additional information, please contact me at flobL@RAMetigiiieeritiginc.com or call me at (425) 678-6960. Thank you. 111-7119 REsus NOV I Z 2019 BLJ'LD' DEPARTMeW OfR409F EDMONDP RAM Engineering 16531 13L' Ave W, Suite A108 Lynnwood WA 98037 (425) 678-6960 RAMengineeringinc,com