3.14.11 traffic impact analysis.pdfFranSPOGROUP MEMOMANDUM Date: March 14, 2011 TG: 10169.00 To: Mat Bergman, BCRA From: Dan McKinney Jr. Scott Lee, PE cc: Subject: 1 st Security Bank — Traffic Analysis This memorandum provides an analysis prepared for the proposed re -development of the 1 st Security Bank in Edmonds, WA. Based on coordination with City staff, this memo addresses the following elements: Project Description Trip Generation Sight distance analysis Impact Fee Project Description The proposed project would include the redevelopment of the 1 st Security Bank located on the northwest corner of Edmonds Way / Paradise Lane intersection in Edmonds, WA. The existing bank is an approximately 1,500 sf existing drive -through bank. The proposed re -development would include an approximately 2,500 sf walk-up bank. Currently four driveways are used to access the property, two on Edmonds Way and two on Paradise Lane. The proposed development would close one access on Edmonds Way and one access on Paradise Lane. A site plan of the development is shown in Attachment 1. The development is anticipated to be constructed and occupied by 2012. Trip Generation This section summarizes the trip generation assumptions and methodology used for the proposed Walk-in Bank (ITE LLI# 911). Trip generation estimates for this project are based on rates summarized in the Institute of Transportation Engineers' (ITE) Trip Generation Manual (8 th Edition, 2008). The net new trip generation takes into c - onsideration the existing Drive -Through Bank (LU 912). The anticipated trip generation during the weekday PM peak hour for the proposed development is shown in Table 1. It should be noted that ITE does not identify a pass -by rate for Walk-in Bank, therefore no pass -by reduction was assumed. Table 1. Weekday PM Peak Hour Trip Generation Project Trips Land Use Size Rate' Pass-B Y2 Total In Out Proposed Use Walk-in Bank (LU 911) 2,474 sf 12.13 30 13 17 Existing Use Bank With Drive -Through (LU 912) 1,437 sf 25.82 -17 20 10 10 Total New Trips 10 3 7 1 . Trips rates from ITE Trip Generation Manual, 8th Edition (2008). 2. Pass -by rates based on Trip Generation Handbook (2001). Transpo Group 11730 118th Avenue N.E., Suite 600 Kirkland, WA 98034 425-821-3665 Fax: 425-825-8434 As shown in Table 1, the proposed project results in 10 new trips during the weekday PIVI peak hour. Since the project adds less than 25 peak hour trips to the site, no further analysis is necessary based on City of Edmonds traffic impact analysis requirements. Sight Distance Analysis A sight distance analysis was conducted at the proposed site access driveways to determine if adequate sight distance will be available to meet stopping and entering sight distance. The City of Edmonds has adopted sight distance standards outlined within AASHTO. Stopping sight distance was measured using an eye height of 3.5 feet and an object height of 2.0 feet. Entering sight distance was measured using an eye height of 3.5 feet for both vehicles. The posted speed along Edmonds Way is 35 mph, thus a design speed of 45 mph was used to calculate stopping and entering sight distance requirements. The posted speed limit along Paradise Lane is 25 mph, thus a design speed of 35 mph was used to calculate stopping and entering sight distance requirements. Table 5 summarizes the results of the sight distance analysis. Table 2. Sight Distance Analysis Stopping Sight Distance Measured' Standard Standard Met? Edmonds Way Driveway East of Site Access West of Site Access Paradise Lane Driveway East of Site Access West of Site Access >400 360 feet Yes >400 360 feet Yes Clear to intersection 250 feet Yes C16ar to intersection 250 feet Yes Entering Sight Distance Measured' Standard Standard Met? Edmonds Way Driveway East of Site Access (Right Turn) West of Site Access (Left Turn) Paradise Lane Driveway East of Site Access (Left Turn) >5002 430 feet Yes —4002 500 feet No Clear to intersection 335 feet Yes West of Site Access (Right Turn) Clear to interiection 390 feet Yes 1 . Rounded to nearest five feet; approximated based on field measurement. 2. Assuming tree/shrubs removed from sight lines. As shown in Table 2, entering sight distance is not met at for left turns out of the site access driveway on Edmonds Way. Currently a tree blocks the view at this location. If the tree was removed it is anticipated that the sight distance would increase to approximately 400 feet, which is less than the 500 foot requirement in AASHTO. Shrubs block the view for right turning vehicles out of the Edmonds Way access. By trimming or removing the shrubs, sight distance is anticipated to be met. FranSPOGROUP Entefing sight distance looking to the west With entering sight distance not being met for left -turns out of the Edmonds Way driveway, it is recommended that this driveway be restricted to right-in/right-out only access. In addition, shrubs should be trimmed or removed east of the Edmonds Way driveway to meet site lines for vehicles making a right -turn. Impact Fee An impact fee for the proposed development has been estimated based on City of Edmonds Impact Fee Rates. For a change in use of an existing building, the impact fee is the applicable impact fee for the ITE land use of the new use, less an amount equal to the applicable impact fee for the ITE land use of the prior use, established at the time the prior use was permitted. Since the original bank was developed prior to 2004, 2004 rates were used to determine the impacts imposed by the existing use. Table 3 summarizes the impact fees for the proposed development. Table 3. Impact Fee Summary % New Trip Length Development Impact Fee Per ITE Land Use Trip Rate Trips Factor Size (sf) Unit Impact Fee Proposed Use LU 912 Drive-in Bank 25.82 55% 0.47 Existing Use LU 912 Drive-in Bank 54.77 51% 0.47 2,474 $1,049.41 $17,328.53 1,437 $763.66 $14,406.80 Total Impact Fee $2,921.73 1. Closest land use designation within City of Edmonds Impact Fee Rate Table As shown in Table 3, the impact fee estimate for the proposed development is $2,921.73. "I./FranSPOGROUP PROJECTTEAM OWNER S CURIN �9 920 220711 S7 SW, 32M NI �R CE, Wk 9804J DO .�: URR NEIB T '�2 2�1-11 -.75 1ST SECURITY BANK, EDMONDS BRANCH F _771 -1. E: ARCHrrECT I —uE. 'UTE MD 9U`uE IT: .1 RERD- T �253) 627-4D67 F. 2�3) 121-43" E: _q _b—mg, 171 - BOURA I -El III "" CONBTRUDDIN 234 EllONDS WA A020 Co"" PAUL C—R 7� 5 �42 ) 774-41M -4187 74 PROJECT DATA �R ONO DISTNG BUILDING, BUILD NEN 2,474 SF :E E-Dl BANI w =Am vm a.= awe. cou w amv. PRB CEL NO, 21 111DDlD7-. IDDI-DO, 170 111301111 I F ION NDB LIE 'p P� NED BUSIN" UUT AN. 0 .1. Ou-. CONSTRUDD N TYPE V-6 NO IN— 'NU'MN"OF 5ORIEB I BTORY �lc I ITY MAP BUILDING PERMIT DATA 4 BF RUNI BING RRTNRE COUNT. 4474 5F / 2DU DF/OCC � 12 OCC—B PLUMBIN REQUIRED PER — 2- h NPLE OCC - 1 MTER CLOSET '." . I —D, FIA-E III - 1 — CILUSUT - - - - - - 11A u w: I N' T L D" IA� TAU TR C111 — OMURAN7 LOAD (PER BI !o i's' 2,474 SF/ 1DO - � GIC SITE PLAN FLOOR PLAN oc A SG&E I' - 20'-0' amn Z < COVER SHEEr li BCRA G1.01