Loading...
3.15.19 - Eng. Correction Notice - 742 Daley St..pdfOV EDAf 0 un CITY OF EDMONDS CORRECTION NOTICE ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.go DATE: March 15, 2019 PERMIT NUMBER: BLD20170549 OWNER: Kent Dietz SITE CONTACT: ADDRESS: 7237 Soundview Lane TYPE OF INSPECTION: Single Family Final Inspection F-1 WORK DESCRIBED BELOW HAS BEEN INSPECTED AND APPROVED F-1 APPROVED PLANS AND PERMIT JOB CARD MUST BE AVAILABLE TO INSPECTOR ON SITE F-1 CORRECTIONS LISTED BELOW MUST BE MADE BEFORE WORK CAN BE APPROVED AND/OR THE NEXT PHASE OF WORK IS STARTED. RECALL FOR INSPECTION F-1 REINSPECTION FEE MUST BE PAID PRIOR TO NEXT INSPECTION REQUEST. F-1 STOP WORK UNTIL AUTHORIZED TO CONTINUE BY CITY INSPECTOR Water meter and box need to be corrected such that the top of water meter sits 4"-6" below meter box lid. 2. Need to extend tracer wire into water meter box. Outfall for the tightline/footing needs to be at the surface with a quarry spall splash pad. 4. Clean the 12" cast iron lid of asphalt at the 6" sewer cleanout. 5. The 6" sewer cleanout needs a gripper type plug per city standard detail SS-200. 6. The sewer lateral will need to be TV'd to confirm there has been no settling/vertical displacement. 7. Need to complete mudding in sewer manhole. 8. Possibly additional channeling may be required within the sewer manhole. The city Sewer Division will stop by and confirm the completed channeling within the manhole is acceptable. 9. Please provide an engineer report with approval of the installed ecology blocks on the west and south side of the home as well as the keystone blocks on the east side of the driveway. Please address drainage requirements for both retaining walls, are they required or not. 10. Driveway slopes are not to exceed 14% slope. Beyond 14% slope will require approval from city engineer with max slope of 20%. Asphalt driveway needs to be corrected. 11. Driveway slope can begin at edge of asphalt street, outside the traveled lane. 12. The connection of the driveway at the asphalt street will need to be a clean straight saw cut, allowing for a clean joint. 13. Site needs to allow for 2 onsite parking spaces at 8.5'x I 6'each parking space. 14. Driveway shall be corrected as to not create a surcharge on east retaining wall. As discussed on site a vegetation strip equal in width to height of wall will need to be install to eliminate the surcharge OR install an engineered retaining wall. 15. Obtain an encroachment permit for existing retaining wall (if existing is to remain), paver steps (if existing is to remain), sewer lateral & split rail fence (applying for encroachment is not automatic approval for encroaching items). 16. Install a split rail fence per approved plans indicating critical area buffer. 17. Provide an as -built for the site. For inspection scheduling call 425-771-0220 x 1326. Page 2 of 2