3.6.18 - Evaluation Letter Footing Drains.pdfLovell-Sauerland and Associates, Inc.
19217 36th Avenue West, Suite 106 Phone: 425-775-1591
Lynnwood, Washington 98036 LSAEngineering.com
Engineers Surveyors Planners Development Consultants
March 6, 2018
City of Edmonds Engineering Division LSA No. 5537
1215 h Avenue N
Edmonds, WA 98020
Re: Brackett's Court, 21276 - 80'h Avenue W. (Building Permit #20160598) fo, ie__ 0 .6 2 018
Engineering Site Plan Construction Evaluation Letter DEVELOPMENT SERVICES
COUNTER
Per Mr. Jake Lyon's request, LSA is pleased to provide the following professional engineering
evaluation of the proposed stormwater drainage system for the Brackett's Court 14-lot Plat at 21276 -
80'h Avenue W.
The engineering drainage and site development plan included the installation of footing drain, which will
discharge into City's storm drainage system at the southwest comer of 801h Avenue W/212 1h Street SW
intersection. During the course of construction activity, crawl space/footing drain for individual building
(except Buildings # 5 and #8) were tightlined together with downspout drain, and discharging into
designated infiltration trenches, which were sized for collected runoff from building roof and pavement.
Per the "Footing Drain" (attached) prepared by Liu & Associates, Inc., dated September 25, 2017, the
amount of water in footing drains will be limited, and that it will be acceptable to discharge footing drain
water into infiltration trenches.
Refer to the attached drainage as -built plan and drainage analysis, crawl space elevations are set above
overflow elevations, stonnwater in the drainage systems will not backup to flood building's crawl
spaces.
If you have fiii-ther questions or need additional information, please give me a call.
Sincerely,
John W. Yuen, P.E.
Project Engineer
W.
ks/
35420
Gis,
NAL (0
LIU & ASSOCIATES, INC.
Geotechnical Engineering Engineering Geology Earth Science
September 25, 2017
Mr. Randy Brockway
Pride Ventures
320 Dayton Street, Suite 108
Edmonds, WA 98020
Dear Mr. Brockway:
Subject: Footing Drain
Brackett's Comer
80th Avenue W and 212th Street SW
Edmonds, Washington
L&A Job No. 15-058
You propose to dispose water in townhome building footing drains into infiltration
trenches. It is our opinion that the amount of water in footing drains will be limited and
that it will be acceptable to discharge footing drain water into infiltration trenches.
Yours very truly,
LIU & ASSOCIATES, INC.
J. S. (Julian) Liu, Ph.D., P.E.
Principal
19213 Kenlake Place NE - Kenmore, Washington 98028
Phone (425) 483-9134 - Fax (425) 486-2746
CONCRETE SIDEWALK
VEFMAL CUFM
12" CAST IRON WATER MAIN
EX. Cl 17,4','lx4'
C
C7U MH
I TSE U7 ME
El
MONUMEN
1+ 00 212th STREET S.W. 2+0(
(T,B
M. 'A"
III
LX SSCO
INV SE)=443 80-6"D.::
va-As", tl—\
6' SEW I P GAS MAIN NV�NE)�443.41-9-D.
a _ _
—
IM SAMIArtY
17
k. �9L
10 20' 0 0 42%
OF OF Or OF OF OF OF
OF W OF OF OF OF Of
-----------
.......... ...........
W-)
,4. 4'PW
3v
W-6 ?v
.01
-o
N114-
W-4m
BUILDING 14
cor-I
INV(N)-4.61-�PVC (0 F.)
INV(S)-4�-�PVC
1114-
1-1p.
.1
;F-,xww larl
INV(Q-313-4'PVC
��10)
V(N)-�43-PVC (0 F.)
-o
N .48'
E_I...,
-
BUILDING 13
0
BUILDING 12
BUILDING 11
. .50
g3)-444.I32-4'- (".
W-3.54'
C�-138-4-PYC
1
:0
NWN)-441-e-
tr-t.,
CPO
<
a_
V--a?
:NV(E):� -8'PVC
NV(S) --6-PVC
... . ....
..........
------ -------------
. .............
sscoo
201+00
jjj!�
0
Or OF
+
CO)
cr-413
(PER PLAN)
5.
R
4. 4�
7 95
BUILDING 8
R-1 15
INV(SE)-"4. -7-6-P- (W)
V )_ �44.45-4�-PVC (OF)
INV(Q-35-4 PVC
INV(S)--l.-4'Plc
3
INV(Q-4�2 -4-PVC
IS
L
BUILDING 10
BUILDING 9
SSCO
PvC
:NV(( )=-.-
PARKING
vb
Ed
. . ........
.
r
... . . .........
Ed
>
BU ILDING 7
2Y
.m". CLUE
RI -7.40
smo
W-Q 73'
Do
4Y
NV -4'PVO
V�11-4
E)�-.- 'PVC
NV(N)— 85-4'PVC
N, =-1.
-�N)-446 -4-PVC (D F)
447.19
co
CD
5R-4'PVC
BUILDING 6
Z
BUILDING 5
RIM-7-
(o F.)
12
Of
%-am
2V
<
I. -A.
El-
rk.)
44
4103-40M
....................
A--
0.
+
Go
- ............
- - -----
.... . ..
----------
IFF-4-2
(SUNW-)
"-..z2k
Y
RI -11.
cl�
<
S-0,45,
BUILDING 4
NV(W)=�,fig-'PVC (0 F.)
N -Pw
111-41111."
M"114-VIVI
4�3 1-'ftll
F
N&A"
INV(E)-443�-4'PVC
..L-epw
-w
BUI L ING 3
c� X
RI D4
NE)-4 D P
NZ) (0E)
N V(
.v(E)-- -4'PVC
BUILDIN
LLJ+
BUILDING 1
............
.
r.w
EX. GARAGE
(APPROXIMATE)
Drainage Analysis
(Downspout, Crawl Space, and Connection Point as -built information were received via
emails dated December 20 from the Chris Lyon, and February 8 from Jake Lyon)
Footing drain invert elevations are assumed to be at the same elevation as crawl space
drain.
Lot I
Ground Floor Elevation
Downspout Elevation
Crawl Space Elevation
Footing Drain Invert Elevation
Connection Point Elevation
Top of Rock Elevation at Trench #1
Invert
Bottom of Rock Elevation at Trench #1
Top of Rock Elevation at Trench #2
Invert
Bottom of Rock Elevation at Trench #2
Top of Rock Elevation at Trench #3
Invert
Bottom of Rock Elevation at Trench #3
CB #2 (Per plan)
Rim = 447.4+/-
Inv In 443.70 (S&W)
Inv Out = 443.70—(E) To Trench #1
Inv Out = 445.20—(N) O.F.
448.30 (Surveyed)
446.10
445.30
445.30 v'
444.30 To CB #2
445.20 (Per Plan)
443.70 (Per Plan)
439.20 (Per Plan)
444.50 (Per Plan)
443.00 (Per Plan)
438.50 (Per Plan)
444.60 (Per Plan)
443.10 (Per Plan)
438.60 (Per Plan)
CB #2 (Surveyed)
Rim =
446.94
Inv In
444.07-4"
PVC (S)
Inv Out =
443.96-4"
PVC (E)
Inv Out =
445.08-4"
PVC (N)
In order to achieve the designed 100% infiltration, a Tee section (with bottom capped)
shall be attached to the outlet of the overflow pipe (invert @ 445.08), the top of the Tee
section shall be extended to overflow water surface elevation @ 445.20.
Section of 4" PVC has been added to connect CB #3 and Infiltration Trench #3, both
Infiltration Trench #2 and Infiltration Trench #3 are hydraulically connected. Overflow
would occur out of CB #4, and ultimately discharge into City's drainage system — an
existing CB located at southwest corner of 80"' Avenue W/212 th Street SW Intersection.
CB #3 (Per plan)
Rim = 447.76
Inv In = 443.00(S)
Inv Out 443.00 (E) To Trench #2
CB #4 (Per plan)
Rim = 447.14
Inv In 443.10(S)
Inv Out = 443.10 (E) To Trench #3
Inv Out = 444.60 (W) O.F.
CB #3 (Surveyed)
Rim =
446.59
Inv In
443.24-4" PVC (S)
Inv Out =
443.14-4" PVC (E)
Inv Out =
443.14-4" PVC (W)
CB #4 (Surveyed)
Rim = 447.19
Inv In 443.61-4" PVC (S)
Inv Out = 443.26-4" PVC (E)
Inv Out = 444.69-6" PVC (W)
Downspout, crawl space and footing drains are tightlined together, and connected to CB
#2 @ 444.07, collected stormwater will enter the infiltration trench (#1) @ 443.96. When
water level reaches above 445.20 (adjusted) @ CB #2, stormwater will enter the
overflow pipe, which is connected to CB #1. Stormwater will enter the infiltration trench
(#2) @ 443.14. The Contractor had hydraulically connected the two infiltration trenches
(#2 & #3) @ CB #3, the overflow would occur out of CB #4 @ 444.69, and ultimately
discharge into City's drainage system — an existing CB located at southwest corner of
80th Avenue W/212 th Street SW Intersection
Crawl space elevation (445.30) is 0. 10' above the overflow elevation 445.20 (adjusted)
@ CB #2. Stormwater in the system will not back up to flood the crawl space.
Lot 2
Ground Floor Elevation
Downspout Elevation
Crawl Space Elevation
Footing Drain Invert Elevation
Connection Point Elevation
Top of Rock Elevation at Trench #2
Invert
Bottom of Rock Elevation at Trench #2
Top of Rock Elevation at Trench #3
Invert
Bottom of Rock Elevation at Trench #3
CB #3 (Per plan)
Rim = 447.76
Inv In =
443.00(S)
Inv Out
443.00 (E) To Trench #2
CB #4 (Per
plan)
Rim =
447.14
Inv In
443.10(S)
Inv Out =
443.10 (E) To Trench #3
Inv Out =
444.60 (W) O.F.
448.0 (Per Plan)
446.10
445.30
445.30-'
444.50 To CB #3
444.50 (Per Plan),/
443.00 (Per Plan)
438.50 (Per Plan)
444.60 (Per Plan)
443.10 (Per Plan)
438.60 (Per Plan)
CB #3 (Surveyed)
Rim = 446.59
Inv In 443.24-4" PVC (S)
Inv Out = 443.14-4" PVC (E)
Inv Out = 443.14-4" PVC (W)
CB #4 (Surveyed)
Rim =
447.19
Inv In
443.61-4" PVC (S)
Inv Out =
443.26-4" PVC (E)
Inv Out =
444.69-6" PVC (W)
Downspout, crawl space and footing drains are tightlined together, and connected to CB
#3 @ 443.24, collected stormwater will enter the infiltration trench (#2) @ 443.14. The
Contractor had hydraulically connected the two infiltration trenches (#2 & #3) @ CB #3,
the overflow would occur out of CB #4 @ 444.69, and ultimately discharge into City's
drainage system - an existing CB located at southwest corner of 80 'h Avenue W/212 th
Street SW Intersection.
Crawl space elevation (445.30) is 0.61' above the overflow elevation (444-69) @ CB #4.
Stormwater in the system will not back up to flood the crawl space.
Lot 3
Ground Floor Elevation
Downspout Elevation
Crawl Space Elevation
Footing Drain Invert Elevation
Connection Point Elevation
Top of Rock Elevation at Trench #3
Invert
Bottom of Rock Elevation at Trench #3
CB #4 (Per plan)
Rim = 447.14
Inv In 443.10(S)
Inv Out = 443.10 (E) To Trench #3
Inv Out = 444.60 (W) O.F.
447.5 (Per Plan)
446.10
445.30
445.30
444.00 To CB #4
444.60 (Per Plan)
443.10 (Per Plan)
438.60 (Per Plan)
CB #4 (Surveyed)
Rim = 447.19
Inv In 443.61-4" PVC (S)
Inv Out = 443.26-4" PVC (E)
Inv Out = 444.69-6" PVC (W)
Downspout, crawl space and footing drains are tightlined together, and connected to CB
#4 @ 443.61, collected stormwater will enter the infiltration trench (#3) @ 443.26. The
overflow would occur out of CB #4 @ 444.69, and ultimately discharge into City's th
drainage system — an existing CB located at southwest corner of 80't' Avenue W/212
Street SW Intersection.
Crawl space elevation (445.30) is 0.61' above the overflow elevation (444.69).
Stormwater in the system will not back up to flood the crawl space.
Lot 4
Ground Floor Elevation
Downspout Elevation
Crawl Space Elevation
Footing Drain Invert Elevation
Connection Point Elevation
Top of Rock Elevation at Trench #4
Invert
Bottom of Rock Elevation at Trench #4
CB #5 (Per plan)
Rim = 447.44
Inv In = 443.40(S)
Inv Out = 443.40 (W) To Trench #4
Inv Out = 444.90 (E) O.F.
447.8 (Per Plan)
446.10
445.30
445.30 \1`
444.00 To CB #5
444.90 (Per Plan)
443.40 (Per Plan)
438.90 (Per Plan)
CB #5 (Surveyed)
Rim = 447.19
Inv In 444.15-4" PVC (S)
Inv Out = 443.56-4" PVC (W)
Inv Out = 444.69-6" PVC (E)
In order to achieve the designed 100% infiltration, a Tee section (with bottom capped)
shall be attached to the outlet of the overflow pipe (invert @ 444.69), the top of the Tee
section shall be extended to overflow water surface elevation @ 444.90.
Downspout, crawl space and footing drains are tightlined together, and connected to C13
#5 @ 444.15, collected stormwater will enter the infiltration trench (#4) @ 443.56. The
overflow would occur out of CB #5 @ 444.90, and ultimately discharge into City's 1h
drainage system — an existing CB located at southwest corner of 80"' Avenue W/212
Street SW Intersection.
Crawl space elevation (445.30) is 0.40' above the overflow elevation 444.90 (adjusted)
@ CB #5. Stormwater in the system will not back up to flood the crawl space.
Lot 5
Ground Floor Elevation
Downspout Elevation
Crawl Space Elevation
Footing Drain Invert Elevation
Connection Point Elevation (Downspout)
Connection Point Elevation (Crawl Space & Footing Drains)
Top of Rock Elevation at Trench #5
Invert
Bottom of Rock Elevation at Trench #5
CB #6 (Per plan)
Rim =
447.2+/-
Inv In
444.75 (W)
Inv Out =
444.75 (E) To Trench #5
Inv Out =
446.25 (N) O.F.
447.9 (Per Plan)
446.30
445.50/
445.50
445.00 To CB #6
445.00 To Overflow
446.25 (Per Plan)
444.75 (Per Plan)
439.00 (Per Plan)
CB #6 (Surveyed)
Rim = 447.18
Inv In 444.88-4" PVC (W)
Inv Out = 444.58-4" PVC (E)
Inv Out = 446.24-4" PVC (N)
Crawl space and footing drains are separated from downspout drain. Both crawl space
and footing drains are tightlined together, and connected to the overflow system in
between lots #5 and #8 @ 444.72. Crawl space and footing drains elevation (445.50) is
0.50' above the connection point elevation (445.00). Stormwater in the system will not
back up to flood the crawl space.
Lot 6
Ground Floor Elevation
Downspout Elevation
Crawl Space Elevation
Footing Drain Invert Elevation
Connection Point Elevation
Top of Rock Elevation at Trench #7
Invert
Bottom of Rock Elevation at Trench #7
CB #8 (Per plan)
Rim = 448.05
Inv In =
443.90 (E)
Inv In =
443.90 (W)
Inv Out
443.90 (N) To Trench #7
447.7 (Per Plan)
446.10
445.30
445.30
445.00 To CB #8
445.40'�Per Plan)
443.90-"(Per Plan)
441.40 (Per Plan)
CB #8 (Surveyed)
Rim =
447.40
Inv In =
444.85-4" PVC (E)
Inv In =
444.85-4" PVC (W)
Inv Out
443.85-4" PVC (N)
Downspout, crawl space and footing drains are tightlined together, and connected to CB
#8 @ 444.85, collected stormwater will enter the infiltration trench (#7) @ 443.85. The
overflow would occur out of CB #9 @ 445.00 (adjusted), and ultimately discharge into
City's drainage system — an existing CB located at southwest corner of 80th Avenue
W/212 th Street SW Intersection.
Crawl Space and Footing Drain elevation (445.30) is 0.30' above the overflow elevation
445.00 (adjusted) @ CB #9. Stormwater in the system will not back up to flood the crawl
space.
1a.5-4
Lot 7
Ground Floor Elevation
Downspout Elevation
Crawl Space Elevation
Footing Drain Invert Elevation
Connection Point Elevation
Top of Rock Elevation at Trench #7
Invert
Bottom of Rock Elevation at Trench #7
CB #8 (Per plan)
Rim = 448.05
Inv In = 443.90 (E)
Inv In = 443.90 (W)
Inv Out 443.90 (N) To Trench #7
447.7 (Per Plan)
446.00
445.30
445.30
445.00 To CB #7
445.40 (Per Plan)
443 ' 90'(Per Plan)
441.40 (Per Plan)
CB #8 (Surveyed)
Rim = 447.40
Inv In = 444.85-4" PVC (E)
Inv In = 444.85-4" PVC (W)
Inv Out 443.85-4" PVC (N)
Downspout, crawl space and footing drains are tightlined together, and connected to CB
#8 @ 444.85, collected stormwater will enter the infiltration trench (#7) @ 443.85. The
overflow would occur out of CB #9 @ 445.00 (adjusted), and ultimately discharge into
City's drainage system — an existing CB located at southwest corner of 80th Avenue
W/212 th Street SW Intersection.
Crawl Space and Footing Drain elevation (445.30) is 0.85' above the overflow elevation
445.00 (adjusted) @ CB #9. Stormwater in the system will not back up to flood the crawl
space.
+�/ r.�/ I/ ()
L.-,J
ANKC-01
Ground Floor Elevation 448.0 (Per Plan)
Downspout Elevation 446.30
Crawl Space Elevation 445.50
Footing Drain Invert Elevation 445.50
Connection Point Elevation (Downspout) 444.50 To CB #10
Connection Point Elevation (Crawl Space & Footing Drains) 444.50 To Overflow
Top of Rock Elevation at Trench #8
Invert
Bottom of Rock Elevation at Trench #8
CB #10 (Per plan)
Rim = 447.2+/-
Inv In 444.75 (W)
Inv Out = 444.75 (E) To Trench #8
Inv Out = 446.25 (S) O.F.
446.25 (Per Plan)
444.75 (Per Plan)
439.00 (Per Plan)
CB #10 (Surveyed)
Rim = 447.54
Inv In 444.95-4" PVC (W)
Inv Out = 444.53-4" PVC (E)
Inv Out = 446.24-4" PVC (S)
Crawl space and footing drains are separated from downspout drain. Both crawl space
and footing drains are tightlined together, and connected to the overflow system in
between lots #8 and #9 @ 444.41. Crawl space and footing drains elevation (445.50) is
1.00' above the connection point elevation (444.50). Stormwater in the system will not
back up to flood the crawl space.
Lot 9
Ground Floor Elevation
Downspout Elevation
Crawl Space Elevation
Footing Drain Invert Elevation
Connection Point Elevation
Top of Rock Elevation at Trench #7
Invert
Bottom of Rock Elevation at Trench #7
448.5 (Per Plan)
446.80
445.91
445.91
444.82 To CB #9
445.40 (Per Plan)
443.90 (Per Plan)
441.40 (Per Plan)
CB #9 (Per plan) CB #9 (Surveyed)
Rim = 447.85 Rim = 447.95
Inv In 443.90 (E) Inv In 444.35-4" PVC (E)
Inv Out = 443.90 (S) To Trench #7 Inv Out = 444.05-4" PVC (S)
Inv Out = 445.40 (W) O.F. Inv Out = 444.45-4" PVC (W)
In order to achieve maximum infiltration , a Tee section (with bottom capped) shall be
attached to the outlet of the overflow pipe (invert @ 444.45), the top of the Tee section
shall be extended to elevation @ 445.00.
Downspout, crawl space and footing drains are tightlined together, and connected to CB
#9 @ 444.35, collected stormwater will enter the infiltration trench (#7) @ 444.05. The
overflow would occur out of CB #9 @ 445.00 (adjusted), and ultimately discharge into
City's drainage system — an existing CB located at southwest corner of 80th Avenue
W/212 th Street SW Intersection. Crawl space elevation (445.91) is 0.91'above the
overflow elevation 445.00 (adjusted). Stormwater in the system will not back up to flood
the crawl space.
Lot 10
Ground Floor Elevation
447.7 (Per Plan)
Downspout Elevation
446.50
Crawl Space Elevation
445.20
Footing Drain Invert Elevation
445.20
Connection Point Elevation
444.30 To CB #13
Top of Rock Elevation at Trench #11
444.80 (Per Plan)
Invert
443.30 (Per Plan)
Bottom of Rock Elevation at Trench #11
439.80 (Per Plan)
CB #13 (Per plan)
Rim =
447.6+/-
Inv In
443.30(S)
Inv Out =
443.30 (E) To Trench #11
Inv Out =
444.80 (S) O.F.
CB #13 (Surveyed)
Rim = 447.15
Inv In 443.30-4" PVC (S)
Inv Out = 443.23-4" PVC (E)
Inv Out = 444.67-6" PVC(SE)
In order to achieve the designed 100% infiltration, a Tee section (with bottom capped)
shall be attached to the outlet of the overflow pipe (invert @ 444.67), the top of the Tee
section shall be extended to overflow water surface elevation @ 444.80.
Downspout, crawl space and footing drains are tightlined together, and connected to CB
#13 @ 443.30, collected stormwater will enter the infiltration trench (#11) @ 443.23.
The overflow would occur out of CB #13 @ 444.80 (adjusted), and ultimately discharge
into CiVs drainage system - an existing CEI located at southwest corner of 80th Avenue
W/212t Street SW Intersection.
Crawl space elevation (445.20) is 0.40' above the overflow elevation 444.80 (adjusted).
Stormwater in the system will not back up to flood the crawl space.
Lot 11
Ground Floor Elevation
Downspout Elevation
Crawl Space Elevation
Footing Drain Invert Elevation
Connection Point Elevation
Top of Rock Elevation at Trench #12
Invert
Bottom of Rock Elevation at Trench #12
CB #14 (Per plan)
Rim = 447.5+/-
Inv In 444.10(S)
Inv Out = 444.10 (E) To Trench #12
Inv Out = 445.60 (N) O.F.
448.3 (Per Plan)
445.20
445.00
445.00
444.50 To CB #14
445.60 (Per Plan)
444.10 (Per Plan)
439.60 (Per Plan)
J
CB #14 (Surveyed)
Rim = 447.33
Inv In 444.44-4" PVC (S)
Inv Out = 444.31-4" PVC (E)
Inv Out = 444.43-4" PVC (N)
In order to achieve maximum infiltration, a Tee section (with bottom capped) shall be
attached to the outlet of the overflow pipe (invert @ 444.43), the top of the Tee section
shall be extended to elevation @ 444.75.
Downspout, crawl space and footing drains are tightlined together, and connected to CB
#14 @ 444.44, collected stormwater will enter the infiltration trench (#12) @ 444.31.
The overflow would occur out of CB #14 @ 444.75 (adjusted), and ultimately discharge
into CiVs drainage system - an existing CEI located at southwest corner of 80th Avenue
W/212t Street SW Intersection.
Crawl space elevation (445.00) is 0.25' above the overflow elevation 444.75 (adjusted).
Stormwater in the system will not back up to flood the crawl space.
Lot 12
Ground Floor Elevation
Downspout Elevation
Crawl Space Elevation
Footing Drain Invert Elevation
Connection Point Elevation
Top of Rock Elevation at Trench #13
Invert
Bottom of Rock Elevation at Trench #13
CB #15 (Per plan)
Rim =
447.5+/-
Inv In
444.35(S)
Inv Out =
444.35 (E) To Trench #13
Inv Out =
445.85 (N) O.F.
448.7 (Per Plan)
446.20
445.40
445.40
444.20 To CB #15
445.85'(Per Plan)
444 * 35-(Per Plan)
439.60 (Per Plan)
CB #15 (Surveyed)
Rim = 447.35
Inv In 444.45-4" PVC (S)
Inv Out = 444.36-4" PVC (E)
Inv Out = 444.61-4" PVC (N)
In order to achieve maximum infiltration, a Tee section (with bottom capped) shall be
attached to the outlet of the overflow pipe (invert @ 444.61), the top of the Tee section
shall be extended to elevation @ 445.15.
Downspout, crawl space and footing drains are tightlined together, and connected to CB
#15 @ 444.45, collected stormwater will enter the infiltration trench (#13) @ 444.36.
The overflow would OCCUr out of CB #15 @ 445.15 (adjusted), and ultimately discharge
into CiVs drainage system - an existing CB located at southwest corner of 80th Avenue
W/212t Street SW Intersection.
Crawl space elevation (445.40) is 0.25' above the overflow elevation 445.15 (adjusted).
Stormwater in the system will not back up to flood the crawl space.
Lot 13
Ground Floor Elevation
Downspout Elevation
Crawl Space Elevation
Footing Drain Invert Elevation
Connection Point Elevation
Top of Rock Elevation at Trench #14
Invert
Bottom of Rock Elevation at Trench #14
448.0 (Per Plan)
446.20
445.40
445.40
445.00 To CB #16
445.85 (Per Plan)
444.35 (Per Plan)
439.60 (Per Plan)
CB #16 (Per plan)
CB #16 (Surveyed)
Rim = 447.9+/-
Rim = 447.77
Inv In 444.35(S)
Inv In 444.27-4" PVC (S)
Inv Out = 444.35 (E) To Trench #14
Inv Out = 444.30-4" PVC (E)
Inv Out = 445.85 (N) O.F.
Inv Out = 444.79-4" PVC (N)
In order to achieve maximum infiltration, a Tee section (with bottom capped) shall be
attached to the outlet of the overflow pipe (invert @ 444.79), the top of the Tee section
shall be extended to elevation @ 445.15.
Downspout, crawl space and footing drains are tightlined together, and connected to CB
#16 @ 444.27, collected stormwater will enter the infiltration trench (#14) @ 444.30.
The overflow would occur out of CB #16 @ 445.15 (adjusted), and ultimately discharge
into CiVs drainage system — an existing CEI located at southwest corner of 80th Avenue
W/212t Street SW Intersection.
Crawl space elevation (445.40) is 0.25' above the overflow elevation 445.15 (adjusted).
Stormwater in the system will not back up to flood the crawl space.
Lot 14
Ground Floor Elevation
Downspout Elevation
Crawl Space Elevation
Footing Drain Invert Elevation
Connection Point Elevation
Top of Rock Elevation at Trench #15
Invert
Bottom of Rock Elevation at Trench #15
CB #17 (Per plan)
Rim = 447.8+/-
Inv In 444.35(S)
Inv Out = 444.35 (E) To Trench #15
Inv Out = 445.85 (N) O.F.
447.7 (Per Plan)
446.50
445.20
445.20
445.20 To CB #17
445.85 (Per Plan)
444.35 (Per Plan)
439.60 (Per Plan)
CB #17 (Surveyed)
Rim = 447.80
Inv In 444.47-4" PVC (S)
Inv Out = 444.48-4" PVC (E)
Inv Out = 444.92-4" PVC (N)
Downspout, crawl space and footing drains are tightlined together, and connected to CB
#17 @ 444.47, collected stormwater will enter the infiltration trench (#15) @ 444.48.
The overflow would occur out of CB #17 @ 444.92, and ultimately discharge into City's
drainage system — an existing CB located at southwest corner of 80th Avenue W/212 th
Street SW Intersection.
Crawl space elevation (445.20) is 0.28' above the overflow elevation 444.92.
Stormwater in the system will not back up to flood the crawl space.