Loading...
316 5TH AVE S.PDFIiiiiiiiiiiiii 14692 316 5TH AVE S Water Service rawing The City of Edmonds EASEMENT NO . ............................................ NEW CONSTRUCTION REPAIRS F� LID NO . .................. . ASMT. NO . .................. IT NO.'�!PPkf. OWNER..................................................................... .......................... CONTRACTOR .............................................. ..................................... PERM J. JOB ADDRESS .... 31.4:7 ... S7% ... A!of�..S ............. ........................ ...... .... ........... 311'a r�a=E: W WMWM OF AMMOY. IM khMON dWS ON 90 attached map was wnipiled for m by to Cly d Edmor&6 1b - -- and axwAW*. The Cky of Edmawk don rA wwNW 60 owmq 49 anybno sd bm on ow map. Arq w a am an kideplaw A --PT" should cmdud mv---v Now don an the ai* mk*g W, rod bM lk In bcdo of my *" 46 Om Such snw Aft mq or may nd e4d &W may a Noy Int UM d 10 location sho NwVw go 04 of Edwnb w 6 VIng � at oftm &W be Uhl* fw on khrula:wu an Oft m* aw 1w my wd mpaw0w poAdsd bwW WN a MW PwVV-00ul-11175 (REV.1. 1178) LEGAL DESCRIPTION: LOT -NO . ...................................... BLOCK NO . ..................... .............. ....................................................................................................... .......................................................... NAMEOF ADDITION ..: .................................................................................................................... N r-4'# No. App-oved: 2-17 - '7t DATE ........................... 7 ................ By ............................... Dennis M. Bruce, RE. M.S.C.E., M.B.A. Geotechnical/ Civil Engineer April 20, 2004 City of Edmonds c/o CDR Architects 529 Maple St. Edmonds, WA 98020 Subject: Additional Geotechnical Criteria — Proposed Nordic Center 3145 th Ave. S, Edmonds, Washington This engineering report presents additional geotechnical criteria with regard to the new Nordic Center proposed for 314 5 th Ave. S, Edmonds, Washington. REFERENCES: • Project Plans by CDR Architects • Structural calculations and shoring design by CT Engineers • Geotechnical Report dated April 27, 2003 by D. Bruce, P.E. SUB -GRADE CONDITIONS - DRAINAGE: This engineer conducted a geotechnical investigation of the site using backhoe dug test pits on April 1, 2003 (see Geotechnical Report and photographs). The sub - grade soils consisted of dense to very dense sands with gravels. No evidence of any water was encountered in the excavations (Test Pit No. 1 was dug to 11 feet below existing (current parking lot) grade. Test Pit No. 2 was dug to 7 feet below parking lot grade. This engineer has worked with project structural engineers (CT Engineers), project architect (Dennis Christianson), and drainage engineers (Keen Engineering). There is no groundwater problem impacting this project. Recent review of architect's final Site Plan and Excavation Sections indicate that the bottom of excavation will be at elevation 190.33. This elevation is hi-ghe than the excavated test pits. SOILS - FOUNDATIONS - SITE DEVELOPMENT - INSPECTION - DRAINAGE - DESIGN& PERMIT - LEGAL P.O. Box 55502 - Shoreline, Washington 98155 - (206) 546-9217 - FAX 546-8442 City of Edmonds c/o CDR Architects Re: Nordic Ventures, LLC April 20, 2004 Page 2 This engineer has reviewed the structural shoring plan and approves the soldier pile design as indicated on the Plans, subject to geotechnical inspections by this engineer. Footing Drains: Based on the extremely permeable nature of the native sands (conservative estimate of 10 inches per hour flow rate), the use of footing drains is superfluous. In other words, the native sands will do a far better job of draining any moisture away from the lower garage level than any man-made drainage system could do. Thus, there is no geotechnical requirement for footing drains or any type of sump pump. There is also no geotechnical need for any sediment sump. SUMMARY: 0 Dense native sands reveal no evidence of any groundwater or seepage problem. Footing drains, sediment sump, or any type of sump pump are not geotechnically required. 0 On -site inspections by this engineer to verify. If there are any questions, do not hesitate to call. WA 17405 A, ISTS MAL 12172V .50921 DMB:abj cc: Nordic Ventures, LLC Dennis M. Bruce, P.E. Geotechnical / Civil Engineer �Y' Dennis M. Bruce, P.E. m.S.C.E., M.B.A. Geotechnical/ Civil Engineer April 26, 2003 RECEIVED DEC 2 2 2003 Nordic Ventures, L. L.C. PERMIT COUNTER 107�7 2260'S.W. Edmonds, WA 98020 Subject: Geotechnicall Evaluation I Shoring & Foundation Recommendations Proposed New Nordic Center 314 eh Ave. S., Edmonds, Washington This engineering report presents the results of a geotechnical evaluation of the Nordic Ventures, L.L.0 property at 314 5�h Ave. S., Edmonds, Washington. This evaluation was required due to owner / developer concerns regarding the proposed new commercial building, with regard to foundation criteria. REFERENCES: • Location Map • Property survey map Project plans by Dennis Christianson, architect Preliminary shoring concept plans by CT Engineers Site photographs BACKGROUND: The overall Nordic Ventures, L.L.C. property at 314 e Ave. S. is rectangular in shape. See survey map. The property is approximately 50 feet wide along e Ave. S. and extends approximately 122 feet westerly towards the public alley. The property is very gently sloped draining westerly (downhill). Currently, the property serves as a paved parking area. An existing commercial building (House of Marble) occupies the southern adjacent lot, a residence exists on the northern adjacent property with a 6 foot wide concrete walkway lying within the Nordic Ventures, L.L.C. property. See survey map. Visual evaluation of the property reveals no evidence of any geotechnical distress: no pavement cracking, no sink holes, no settlements, nor any evidence of erosional degradation. ET E- FILE SOILS - FOUNDATIONS - SITE DEVELOPMENT - INSPECTION - DRAINAGE - DESIGN& PERA41T - LEGAL P.O. Box 55502 - Shoreline, Washington 98155 - (206) 546-9217 - FAX 546-8442 Nordic Ventures, L. L. C. April 26, 2003 Page 2 EVALUATION: In order to augment existing site geotechnical information, soil test pits were dug under this engineer's observation on April 1, 2003. See photographs. 2 test pits were dug in the locations indicated on the site plan. Test Pit #1 (located along the south property line and 8 feet west of the east property line). 0" to 4" Asphalt pavement. 4" to 4' Moderately dense, well graded sand. 4' to 8' Very dense sand with compacted "chunks". 8' to 11' (bottom of test hole) Cemented sand and gravels. Very hard digging. No water was encountered in test pit #1. Test trench walls remain vertical and stable. No caving or sloughing occurred. Test Pit #2 (located 6 feet north of the south property line and 36 feet east of the west property line). 0" to 4" (approximately 2 inches of asphalt and approximately 2 inches of gravel sub -base). 4" to 7' Very dense cemented sands with gravels (harder digging than test pit #1). No water was encountered in test pit #2. Test pit walls remain vertical and stable with no caving or sloughing. CONCLUSIONS I RECOMMENDATIONS: Based on the findings of this engineer's investigation as well as experience in the area with similar projects, the Nordic Ventures, L.L.C. property at 314 5th Ave. S., Edmonds, WA is geotechnically approved for the proposed new commercial structure, subject to the following: 0 Excavation shoring required in accordance with recommendations herein. Standard reinforced continuous and spread footings. Allowable bearing pressure: 2,000 p.s.f. Equivalent fluid pressure of 20 p.c.f. is recommended for shoring design criteria, provided shoring is inspected and verified by this engineer. Nordic Ventures, L. L. C. April 26, 2003 Page 3 For retaining wall design, use friction factor of 0.55 and passive pressure of 350 p.c.f. Temporary Shoring: For the property line cuts (up to 8 feet in depth) temporary shoring consisting of staggered Ecology Blocks may be used (see attached Eco- Block Shoring Design. Geotechnical inspections by this engineer prior to any foundation concrete placement. The proposed structure can be supported on conventional continuous and spread footings bearing on undisturbed native soils or on structural fill placed above native soils. See the later sub -section entitled General Earthwork and Structural Fill for structural fill placement and compaction recommendations. Continuous and individual spread footings should have.minimum widths of eighteen (18) and twenty-four (24) inches, respectively, and should be bottomed at least eighteen (18) inches below the lower adjacent finish ground surface. Depending on the final site grades, some over -excavation may be required below footings to expose competent native soils. Unless lean concrete is used to fill the over excavated hole, the width of the over -excavation at the bottom must be at least as wide as the sum of two times the depth of the over -excavation and the footing width. For example, an over -excavation extending two feet below the bottom of a three-foot wide footing must be at least seven feet wide at the base of the excavation. . Footings constructed according to the above recommendations may be designed for an allowable soil bearing pressure of three thousand (3,000) pounds per square foot (p.s.f.). A one-third increase in this design bearing pressure may be used when considering short-term wind or seismic loads. For the above design criteria, it is anticipated that total post -construction settlement of footings founded on competent, native soils (or on structural fill up to five (5) feet in thickness) will be about one-half inch, with differential settlements on the order of one -quarter inch. Lateral loads due to wind or seismic forces may be resisted by friction between the foundations and the bearing soils, or by passive earth pressure acting on the vertical, embedded portions of the foundations. For the latter condition, the foundations must either be poured directly against 'undisturbed soil or the backfill placed around the outside of the foundation must be level structural fill. We recommend the following design values be used for the foundation's resistance to lateral loading: Parameter Desi-qn Value Coefficient of Friction 0.55 Nordic Ventures, L.L.C. April 26, 2003 Page 4 Passive Earth Pressure 350 p.c.f. Where: (1) p.c.f. is pounds per cubic foot. (2) Passive earth pressure is computed using the equivalent fluid density. We recommend that a safety factor of at least 1.5 be used for design of the foundation's resistance to lateral loading. SLABS -ON -GRADE: Slab -on -grade floors may be supported on undisturbed, competent native soils or on structural fill. The slabs may be supported on the existing soils provided these soils can be re -compacted prior to placement of the free -draining sand or gravel underneath the slab. This sand and gravel layer should be a minimum of four (4) inches thick. We also recommend using a vapor barrier such as 6-mil. plastic membrane beneath the slab with minimum overlaps of 12 inches for sealing purposes. PERMANENT FOUNDATION AND RETAINING WALLS: Retaining walls backfilled on one side only should be designed to resist lateral earth pressures imposed by the soils retained by these structures. The following recommended design parameters are for walls less than twelve (12) feet in height, which restrain level backfill: Parameter Design Value Active Earth Pressure* 20 p.c.f. Passive Earth Pressure 350 p.c.f. Coefficient of Friction 0.55 Soil Unit Weight 125 p.c.f. Where: (1) p.c.f. is pounds per cubic foot (2) Active and passive earth pressures are computed using equivalent fluid densities. For restrained walls which cannot defect at least 0.002 times the wall height, a uniform lateral pressure of one hundred (100 p.s.f. should be added to the active equivalent fluid pressure). Nordic Ventures, L. L. C. April 26, 2003 Page 5 The values given above are to be used for design of permanent foundation and retaining walls only. An appropriate safety factor should be applied when designing the walls. We recommend using a safety factor of at least 1.5 for overturning and sliding. The above design values do not include the effects of any hydrostatic pressures behind the walls and assume that no surcharge slopes or loads will be placed above the walls. If these conditions exist, then those pressures should be added to the above lateral pressures. Also, if sloping backfill is desired behind the walls, then we will need to be given the wall dimensions and slope of the backfill in order to provide the appropriate design earth pressures. Heavy construction equipment should not be operated behind retaining and foundation walls within a distance equal to the height of the wall, unless the walls are designed for the additional lateral pressures resulting from the equipment. Placement and compaction of retaining wall backfill should be accomplished with hand -operated equipment. Retaining Wall Backfill Backfill placed within eighteen (18) inches of any retaining or foundation walls should be free -draining structural fill containing no organics. This backfill should contain no more than five (5) percent silt or clay particles and have no particles greater than four (4) inches in diameter. The percentage of particles passing the No. 4 sieve should be between twenty-five (25) and seventy (70) percent. Due to their high silt content, if the native soils are used as backfill, a drainage composite, such as Mirafi and Enkadrain, should be placed against the retaining walls. The drainage composites should be hydraulically connected to the foundation drain system. The purpose of these backfill requirements is to assure that the design criteria for the retaining wall is not exceeded because of a build-up of hydrostatic pressure behind the wall. The subsection entitled General Earthwork and Structural Fill contains recommendations regarding placement and compaction of structural fill behind retaining and foundation walls. EXCAVATION AND SLOPES: In no case should excavation slopes be greater than the limits specified in local, state and national government safety regulations. Temporary cuts up to a height of four (4) feet deep in unsaturated soils may be vertical. For temporary cuts having a height greater than four (4) feet, the cut should have an inclination no steeper than 1:1 (Horizontal:Vertical) from the top of the slope to the bottom of the excavation. Under specific recommendations by the geotechnical engineer, excavation cuts may be modified for site conditions. All permanent cuts into native soils should be inclined no steeper than 2:1 (H:V). Fill slopes should not exceed 2H: 1. Nordic Ventures, L.L.C. April 26, 2003 Page 6 It is important to note that sands do cave suddenly, and without warning. The contractors should be made aware of this potential hazard. Water should not be allowed to flow uncontrolled over the top of any temporary or permanent slope. All permanently exposed slopes should be seeded with an appropriate species of vegetation to reduce erosion and improve stability of the surficial layer of soil. DRAINAGE CONSIDERATIONS: Footing drains are recommended at the base of all footings and retaining walls. These drains should be surrounded by at least six (6) inches of one -inch -minus washed rock wrapped in non -woven geotextile filter fabric (Mirafi 140N, Supac 4NP, or similar material). At the highest point, the perforated pipe invert should be at least as low as the bottom of the footing and it should be sloped for drainage. All roof and surface water drains must be kept separate from the foundation drain system. No groundwater was observed in either of the 2 test pits during the field work. Seepage into the planned excavation is possible, and likely if excavation occurs during winter months, and if encountered should be drained away from the site by use of drainage ditches, perforated pipe, French drains, or by pumping from sumps interconnected by shallow connector trenches at the bottom of the excavation. The excavation of the site should be graded so that surface water is directed off the site and away from the tops of slopes. Water should not be allowed to stand in any area where foundations, slabs, or pavements are to be constructed. Any exposed slopes to be covered with plastic to minimize erosion. Final site grading in areas adjacent to buildings should be sloped at least two (2) percent away from the building, except where the area adjacent to the building is paved. GENERAL EARTHWORK AND STRUCTURAL FILL: As discussed, the existing residence is to be demolished and removed. It is understood that the proposed new residence will occupy essentially the same footprint (with the addition of the entrance, driveway and new garage). The proposed building and pavement areas should be stripped and cleared of all surface vegetation, all organic matter, and other deleterious material. The stripped or removed materials should not be mixed with any materials to be used as structural fill. Nordic Ventures, L. L. C. April 26, 2003 Page 7 Structural fill is defined as any fill placed under the building, behind permanent retaining or foundation walls, or in other areas where the underlying soils needs to support loads. This engineer should observe site conditions during and after excavation prior to placement of any structural fill. All structural fill should be placed in horizontal lifts with a moisture. content at or near the optimum moisture content. The optimum moisture content is that moisture content which results in the greatest compacted dry density. The moisture content of fill soils is very important and must be closely controlled during the filling and compaction process. The allowable thickness of the fill lift will depend on the material type, compaction equipment, and the number of passes made to compact the lift. In no case should the lifts exceed twelve (12) inches in loose thickness. The following table presents recommended relative compaction for structural fill: Location of Fill Placement Beneath footings, slabs or walkways Behind retaining walls Beneath pavements Minimum Relative Compaction 95% 90% 95% for upper 12 inches of Sub -grade, 90% below that level Where: Minimum relative compaction is the ratio, expressed in percentages, of the compacted dry density to the maximum dry density, as determined in accordance with ASTM Test Designation D-1557-78 (Modified Proctor). Use of On -Site Soils If grading activities take place during wet weather, or when the sandy, on -site soils are wet, site preparation costs may be higher because of delays due to rains and the potential need to import granular fill. The on -site soils are generally sandy, and thus not substantially sensitive to moisture. Grading operations may be difficult when the moisture content of these soils greatly exceeds the optimum moisture content. Moisture sensitive soils will also be susceptible to excessive softening and Upumping" from construction equipment traffic when the moisture content is greater than the optimum moisture content. Nordic Ventures, L. L. C. April 26, 2003 Page 8 Ideally, structural fill, which is to be placed in wet weather, should consist of a granular soil having no more than five (5) percent silt or clay particles. The percentage of particles passing the No. 200 sieve should be measured from that portion of the soil passing the three -quarter -inch sieve. The use of on -site soils for fill material may be acceptable subject to inspections by this engineer. DRAINAGE CONTROLS: No drainage problems were evident at the overall property at 314 5�'Ave. S. The property is flat / very gently sloped. Currently, the parking lot drains westerly into the City of Edmonds public alleyway drainage system. It is understood that the new Nordic Center building will comply with City of Edmonds storm water requirements. CONCRETE: All foundation concrete (footings, stem walls, slabs, any retaining walls, etc.) shall have a minimum cement content of 5-1/2 sacks per cubic yard of concrete mix. TEMPORARY SHORING: . The geotechnical investigation verified extremely dense stable sands as sub - grade soils. This engineer understands that excavation soil cuts up to 10 feet deep will be required for the lower parking level (see updated architect plans to verify parking area elevations). This engineer understands that the soil cuts will taper and reduce in depth towards to the western portion of the project. See plans. This engineer anticipates standard cantilevered soldier piles with lagging for the eastem 1/3 of the project. Use geotechnical criteria within this report for shoring design. This engineer anticipates that the soil cuts (less than 7 feet) for the western 2/3 of the project can be achieved using ecology -block shoring. This engineer anticipates 3 high eco-blocks installed as shoring around the western 2/3 ofthe project. See typical eco-block shoring sketch. Nordic Ventures, L. L. C. April 26, 2003 Page 9 Onsite inspections by this engineer required during all shoring and excavation aspects. INSPECTIONS: The recommendations of this report are only valid when key geotechnical aspects are inspected by this engineer during construction: *Soil cuts • Shoring (soldier pile with lagging and eco-block) • Foundation sub -grade verification • Retaining wall, or rockery placement • Any fill placement • Subsurface drainage installation • Final erosion control and grading SUMMARY: The proposed Nordic commercial building at 314 5th Ave. S., Edmonds, WA is geotechnically viable when constructed in accordance with the recommendations herein, compliance with City of Edmonds approved plans and requirements, and key geotechnical inspections during construction. GEOTECHNICAL REVIEW OF FINAL PLANS: At the time of this investigation report, final project plans were not available for review. As stated in this report, the proposed Nordic Ventures, L. L. C. commercial building may be constructed in accordance with preliminary plans at 314 5 th Ave. S. This engineer continues to work with project owner, architect, and structural engineers regarding final shoring and foundation plans. Prior to final permit issuance, this engineer should review final project to verify compliance with the recommendations of this report. Upon satisfactory review, a "Statement Of Minimal Risk" will be issued. Nordic Ventures, L.L.C. April 26, 2003 Page 10 CLOSURE: The findings and recommendations of this report were prepared in accordance with generally accepted professional engineering principles and practice. No other warranty, either express or implied, is made. The conclusions are based on the results of the field exploration and interpolation of subsurface conditions between explored locations. If conditions are encountered during construction that appear to be different than those described in this report, this engineer should be notified to observe the situation and review and verify or modify the recommendations. If there are any questions, do not hesitate to call. 4"'� /U - ;-� Dennis M. Bruce, P.E. Geotechnical / Civil Engineer APPLICATION 'he City of Edmonds lor SIDE SEWER PERYaT EASEMENT No . .......................................... 00`--l'-,EET FIL&CONSTRUCTION REPAIRS ............................................................................................ -P"4aF-'"'4CabNTRACTOR .......................................................................... ..... F; F--- L- t t:::. F7LOC>P-� (:: EF--<7->E-L, .4-7E,��> OV*rNER .. ................. PERMIT No . .. ................... ADDRESS ... ........ ............................. LEGAL DESCRJPTION: LOT No.... ........................................... BLOCK No . ............................................ NAME OF ADDITION ........... 0 0 .. ........ .. .............. The City of Edmonds APPLICATION for SIDE SEWER PERNaT NEW CONSTRUCTION 0 REPAIRS OWNER---------- ....... ........................... ADDRESS ................................ ....... --- &.: ....................................... E 0 0 6, � q Ile, �, - 1� / -e CONTRACTOR ... �3A� ..... w1-.u4.;u ....... ..................................................... PERMIT No. ..z) 7.4 LEGAL DESCRIPTION: LOT No . .............................................. BLOCK No . ............................................ NAMEOF ADDITION ......................................................................................................................................... So - Approved: DATE................................................ By ...................................................................... , 890 - 194 cc� --,- — - i — FILE CITY OF EDMONDS �?/6 -'5-VC14L)'t�7-'S 250 - 5TH AVE. N. - EDMONDS, WA 98020 - (206) 771-0220 - FAX (206) 771-0221 COMMUNITY SERVICES DEPARTMENT Public Works 9 Planning * Parks and Recreation e Engineering Jeff Aiken House of Marble 316 5th Avenue S Edmonds, WA 98020 RE: REQUEST FOR CHANGE OF ADDRESS: 314 & 316 5TH AVENUE SOUTH LAURA M. HALL MAYOR Your request for address changes at 314 5th Avenue South and 316 5th Avenue South has been reviewed by the Building Official and the Fire Marshall. It has been determined that 314 be changed to 316 5th Avenue South in order that your place of business have as little disruption as possible, but that 316 be changed to 320 5th Avenue South rather than your request for 330 5th Avenue South. The address of 320 fits -more logically into the official addressing grid than your request of 330 and would only be reconsidered if it caused undue hardship. This addressing change becomes effective immediately: 314 to 316 5th Avenue South 316 to 320 5th Avenue South The City will notify all applicable City departments of the change. It will be your responsibility to notify all others, including the Post Office. Thank you, Sharon Nolan Permit Coordinator cc: Police Department Fire Department Public Works Utility Billing Address Files Street Files 9 Incorporoted August 11, 1890 HoM HOUSE of MARBLE, Ltd. July 27, 1993 City of Edmonds Building Department 250 - 5th Avenue North Edmonds, WA 98020 Attention: Sharon Nolan Dear Sharon: We are requesting an address change for the following locations - 314 and 316 - 5th Avenue South, Edmonds, Washington 98020. We request that 314 - 5th Avenue South be assigned the address 316 - 5th Avenue South and that 316 be assigned the address of 330 - 5th Avenue South. This request has the approval of both property owners, Steve Halas and Charles DeBoer. We hope this request can be handled promptly, as Mr. DeBoer is now in the process of renting out the building at 316 - 5th Avenue South. If you need additional information, please do not hesitate to contact us. Sincerely, /J /f eAiken 316 - 5th AVE. SOUTH o EDMONDS, WA 98020 * (206) 778-1990 I CITY OF EDMONDS 250 - 5TH AVE, N. - EDMONDS, WA 98020 * (206) 771-3202 COMMUNITY SERVICES: Public Works * Planning 9 Parks and Recreation * Engineering 890 . 1 99 CERTIFIED MAIL April 4, 1991 Steve J. Halas 314 - 5th Ave. S. Edmonds, WA 98020 RE: Problems with venting of your plumbing fixtures Dear Resident: LARRY S. NAUGHTEN MAYOR PETER E. HAHN DIRECTOR The City's sewer cleaning records show that the home at this address is experiencing problems with the venting of some of your plumbing fixtures when the City crew is conducting cleaning operations of the City sewer line in front of this address. The City's cleaning operation is essential for both you and your neighbors. It cleans debris in lines to prevent plugs, prevents corrosion and potential future collapse, and achieves a better flow characteristic in the public sewer lines. We need to do this often -- perhaps even 3 times a year -- in some critical areas. The City's cleaning operation typically involves the utilization of a high pressure water jet. The problem which occurs at the home is the result of a high pressure surge through your internal plumbing system. A properly constructed plumbing system is designed to easily vent this additional pressure without any visible impact at your residence. An undersized venting pipe (or not having enough vents) cannot handle the pressure surge, and the only release that's available is then through your toilet (or another fixture). The Uniform Plumbing Code typically requires a 211 vent, and further requires a separate vent for each plumbing fixture which is connected to the sewer (a toilet, a sink, a shower). Your home clearly does not have an adequate venting system (you either have a 1-1/411 vent, or not enough of them), and you therefore may continue to experience the pressure surges. The City does not have a choice as far as discharging its responsibility in cleaning the public sewer line. It is therefore up to you to take corrective measures as to how to properly vent your own plumbing system. The City has come up with two options that will remedy your problem: Option 1: Upgrade stack vents for toilets and other fixtures which are experiencing problems to required sizes. 0 Incorporoted Atj.qusi I �!, 1890 0 Sister Cities International — Helkinan, Japan Page 2 Option 2: Install a clean -out outside of house per attached specifications. Enclose box so it can vent properly when excess pressure is put on house lines. This option would be the cheapest and simplest way of correcting this problem. At the same time, it would allow access to sanitary sewer lines if stoppage should occur. This vent clean -out would allow a place for backup in lines to go before entering your house and causing costly damage. The City would appreciate your expeditious cooperation in this matter. The City must continue proper maintenance of its sewer lines, but we obviously do not wish to see continued problems occurring on your property because of poorly designed vents. It is your responsibility to correct these deficiencies. We cannot keep notifying you each time we come out to clean the line. It's up to you to have a plumbing system that conforms to code. Option 2 is a relatively simple one to construct. Should you have any questions on these options, please call Everett Akau, Scott Highland or myself at 771-3202, extension 317 or 318. Sincerely, 9", � �, �V Ron Holland Water/Sewer Supervisor Enclosure SEWERVEN/TXTSEWER ( I ) x L4 " 'Pv c r " �k (Q� A s VC4,-t. ) (:Z)>c Ll" Pvc- q �5* N—I I x s F 15ot (1) x Ll" Pib j C,4�,p P-/C- I I e.A-1 ^ . \ -N. - I>i � �1— , , PVC 3/z. sIq I ;K rN x re r H Lz, Oom J7 c ?Vc- P\lv .j , le_ A P 01. v V'Xess� Air C-S , ri STREET ADDRESS PI.F.- BARBARA FAHEY CITY OF EDMONDS MAYOR PUBLIC WORKS DEPARTMENT - 7110 — 210TH ST. S.W. - EDMONDS, WA 98026 (425) 771-0235 - FAX (425) 744-6057 - E-MAIL: kIein@ci.edrronds.wa.us C. is () \3 WEB SITE: www.d.edmonds.wa.us February 24, 1999 Steve Halas 316 5" Ave So Edmonds, WA 98020 Subject: Water Leak Credit Dear: Mr. Halas I have reviewed your account and will allow a credit for the billing period between November 24, 1998 and March 31, 1999 in accordance with our City policy. The policy states that the customer will be billed at the retail rate based upon the average water consumption for the same period during the previous year. In addition, the excess water lost from the leak will be billed to customer at the City's wholesale rate with a 15% surcharge added for administrative cost. Only one leak credit will be granted in any three- year period. Should you have any additional questions after you receive your new billing, please contact Denise Burke, Utility Billing Clerk, at 771-0241. Sincerely, Jim Waite Water/Sewer Supervisor JW/lk cc: Denise Burke Utility Billing Clerk wordata\water\credit99\# 114225 * Incorporated August 11, 1890 0 Sister Cities International — Hekinan, Japan Odd Jobs by Mills 8112 206th. SW. Edmonds,Wa. 98026 425-778-0974 ODDJOM*88PE Invoice submitted to: Mr. Steve Halas 316 5th Ave. S. Edmonds WA 98020 February 22, 1999 Invoice #10707 02/15/99 Water S6rvicafReplacement 02/22/99 Finit-M-up Job 1,500.00 75.00 4 "M For services c t d $1,575.00 Service3tax $135.45 Total due $1,710.45 SPRING WILL BE HERE SOON .4o�:C! T Y o I E, 0 IN 0 N 0 S STREET FIL9 IDE SEWER PERMIT For Inspection C all 771-3202 PERMIT uo. J&273 Add ress 'of Construction: EDMONDS TREATMENT PLANT Property Legal Description (Include all easements): Owner and/or Builder: k`zl k) -.5 'Contractor & License No: Single Family Residence Multi -Family (No. of Units Commercial (No. of fixture Units Invasionlinto City Right -of -Way: No Yes (If Yes, Right -of -Way Construction Permit required. Call One -Call -Center (1-800-424-5555) before any excavation.) Cross other Private Property: No Yes (If Yes, easement required, attach legal;description and county easement number.) eLEASR AD T�E ITEMS LISTED ON THE�BACK i h I have read and shall com-4-7y. with t it ms listed on the back. 1�16elylr Permit Fee: So Issued By: Trunk Charge: Date Issued: 0 Assessm'ent`F6e: Receipt No.: :5' -V Partial Inspection: Comments Date J 13 U/ Initial Final Inspection Approved: 242 Date IniWal- 00 I., Rejected: Reason4 Date STEM M Ln PERMIT MUSTBE POSTED ON JOB SITE White Copy File Green Copy Inspector Buff Copy Applicant 91 Side Sewer Drawing The City of Edmonds.-- EASEMENT NO . ..... ........................ ---------- NEW CONSTRUCTION REPAIRS CK LID NO..-* ­--_--------- ASMT. NO - ------------ OWNER ---------------------------------- CONTRACTOR _-Russ ..... -_--------------------------- PERMIT NO. 4�30JOB ADDRESS ----- 514 ....... 57 ------ AWS, ------_------_---------- LEGAL DESCRIPTION: LOT NO - --------------- ................... BLOCK NO - -------- ------------------------- ­----------- --------------------------------------------------------- ................................... ---- NAMEOF ADDITION ---------------------------------------------------------------------- ------------ Aso SLMD 4"QA-V%fW tcl n LumSe-R Z n 1.^ WCAC 314 5" So. (-r.v. smop) EWISTIMG 4!'C--l.. CON". Ttb extsr I m G 4!'Pipe C006Mq -ro C.6. SEWER t#Vb%j% Approved: LLE-Y PWW-0001-1 1/75 (REVA 1/78) DATE ... ............ By.,d,4. 41--257 APPLICATION for The City of Edmonds SME SEWER PERMT NEW CONSTRUCTION Ej REPAIRS E] EASEMENT No . .................... ..................... 104-00500 OWNER.......... ....... FjqQr ... C.o.ve.r ....................................... CONTRACTOR ............................................................. ------------------------------------ PERMIT No . ........... .......... ADDRESS .............. a14 ... n ... 5.th..A.venue..S ........ 4 V 1�1 ......................... LEGAL DESCRIPTION: LOT No . .............................................. BLOCK No . ............................................ NAME OF ADDITION .......................................... DYE TESTED ON SEWER JULY, 1972 Approved: DATE................................................ By ........................................... ..........................