Loading...
3575_001.pdfli 1E rp Aw 4D P-1 5mt plw 107cr 8 V7 p P— it- - ZO D"I-T t,: '*,ITO I I %, P*": 7A.— Z� _ ', , ... GMT" EMPATIOWINEWS' MOMMUDEW14140 J VMTYIVWV-Dc FOOTING 'JUJ_= PAM TO DFTA:L r6 AMOPr4ATEOmotokRGEYVWw 041, "MM"DRUME nwcomsLARWINEW --14— IF G'SLADCMGMX t FWDUa 4 . ..ft ... W4r wo -A- AL 4A 4 L11 - 4-V A Coons 0#'m AWPC%. LCC- 6F- We — 7-bp SC. At Vk AM-, NELSON GmTEcm-4icAL AssoCIATES, INC 17311 - 135"' Ave. NF 4A-500 FIELD REPORT Project: Cascadian Apartments Underpinning FileNo:9879B17 Client: Location: Weather: WoodftMfle, WA 98072 Purpose of (425)486-1669 FAX481-2510 Visit: Jeff and Lisa Sterling 9405 Edmonds Way Partly Cloudy, 75'F Construction Monitoring Date: 7/20/2018 Report No: 20 Page I of 2 By: LSB We visited the site today at the request of Jeff Sterling to observe construction activities at the site. Upon arrival to the site, we met with Jeff Sterling. We were informed that the entire interior slab -on -grade had been removed from the common areas, underlying soils were removed and six inches of 5/8-inch minus crushed rock was placed in thin lifts. The crushed roack was compacted with a jumping jack compactor. We evaluated the proposed slab subgrade with a 0.5 inch diameter steel probe under moderate pressure. Probying yielded penetrations of approximately I- to 2-inches indicating well compacted conditions. In our opinion, the slab subgrade within the common room are appears to have been suitably prepared and is ready for placement of the concrete slab. Our findings and conclusions are based on specific observations made while on site. Attachment: Site Plan Distribution: Signed: