Loading...
3664_001.pdfALL STAR POOL & SPA, INC. Custom Shotcrete Swimming Pool & Spas - Licensed & Bonded - Lic. # ALLSTPS003JM P.O. Box 2039 - Everett, WA 98213 PH 425-252-5673 * FAX 425-252-8935 stuart@allstarpoolandspa.com ww.allstarpoolandspa.com Date: 8/29/2018 Plan Review City of Edmonds Building Division RE: Plan Check BLD2019-1039 Project Address: 18604 Sound View Place Scope: Residential Spa This is in response to correction notices from Greg Andrews and Jennifer Lambert from the City of Edmonds Building Division and Engineering Division. Engineering Division: Jennifer Lambert Response to correction notice: I 1) Note to provide a 'Trapped' sewer stand pipe in mechanical equipment room for spa drainage 2) Permit application by Architect 3) AVB shown on site per Architect 4) Note added by Architect for amended soil Building Division: Eric Amdi-evm Response to correction notice: 1) Notes added to plans pertaining to controls @ shut -offs and energy notes 2) Notes added to plans @ cover and vapor retardant requirement 3) Cover meets barrier requirement, see attached. 4) Notes added to indicate temperature requirements 5) Permit will be supplied by Architect or General Contractor. If you have any further questions please contact me. Stuart Clift All Star Pool and Spa -IF U -F M -A R C 'k R C -F F C� -r S I 8/31/18 RE: 18604 Sound View Place, # BLD20181039 Hi Jennifer, Per your review comments Of 8/10/18: 1. See responses from All Star Pools 2. Spa will drained to a "trapped" stand pipe and 3" bell drain in the mechanical room of the house. It will be part of the plumbing system. No modifications to the side sewer will be made. 3. See note added to site plan. 4. See note added to site plan. Please feel free to call or email if there are any further questions. Sincerely, Greg Andrews Tutmarc Associates 8574,55fiAteN.E. Seat0e,WA98105 t2O6.525.5502 ce112064599375 Aftnam&sn.00m architects and builders 01� LT)4,1( CITY OF EDMONDS PLAN REVIEW COMMENTS ENGINEERING DIVISION (425) 771-0220 City Website: www.edniondswa.go DATE: August 10, 2018 TO: Greg Andrews greg@tutmarc.com FROM: Jennifer Lambert, Engineering Technician Jennifer.lambert@edmondswa.gov RE: Application #: BLD20181039 Project: Thronson—Hottub Project Address: 18604 Soundview PI During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please submit revised plans/documents including a written response to each item below. Resubmittals can be made at the Development Services Department on the 2 nd floor of City Hall. Permit Center hours are M, T, Th & F from 8am-4:30pm and on Wednesdays from 8:30am-noon. City of Edmonds handouts, New updated standard details with new reference numbers, application and other forms, and development code may be referenced on the City website: www.edmondswa.gov under Services/Perrmts and Development. 1) Show a cleanout in the vicinity of the hot tub for the draining of the hot tub. a. Hot tubs cannot have a direct connection to sanitary sewer. Drainage of hot tubs must be pumped to sewer system via cleanout. b. The cleariout shall be located 20-30' from the hot tub. c. Please revise the plans accordingly. 2) Submit Side Sewer Permit Application form if you need to install a cleanout. 3) Please show an AVB installed at the nearest fill location (hose bib). 4) Please add a note to the plans that all disturbed soils will be compost amended per BMP T5.13.