Loading...
3799_001.pdf9/14/2018 Dear Mr. l3jorback, We are submitting updated plans that show a newly designed bathroom that is now ADA compliant. The plans also detail a 2 hour shaft wall / 2 hour firewall separation between new classroom and tenant space (indicated on A-1). To address "previous item #9" (on letter dated August 1 st 2018 from City) we have extended the bathroom walls to ensure the bathroom is ADA compliant which eliminates the need for 20% of project cost upgrades (indicated on A-3). Thank you, 1 4 D Autumn & Wesley Snow REsuis SEP 17 2018 BUILDING DEPARTMEN'T CrrY OF EDMONDS 10, A: DATE: August 1, 2018 Citv of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 TO: Autumn Snow Email: tlieti-ikestoo((i),coriicast.iiet FROM: Leif Bjorback, Building Official RE: Plan Check: BLD2018-0578, 2 d review Project: Trike Stop Partial Change of Occupancy Project Address: 23107 100' Ave W During review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please provide written responses in letter format as to where the changes can be found on the plans, and submit revised plans/documents to a permit coordinator in the Development Services Department. Note that new comments or additions to previous comments are noted in italics. Previous item #9: The project alterations trigger the requirement for accessibility upgrades to the existing structure. Show on the plans how the requirements of JEBC 10 12.8.1 and 705.2 are being met. Please be aware that the valuation for the project as determined by the building official likely will be higher than what is shown on the permit application. This item has not been addressed. On the plans, either a) clearly indicate that the interior accessible route of travel complies with current code, or b) provide upgrades per the previously referenced section. Ifyou choose to use exception #1 of that section, provide a letter (reference the code exception), stating the overallproject cost, 20% of theproject cost, and list the accessibility upgrades that will be done as part of this permit as well as showing that the total cost of the upgrades is at least 20%. Show thesefeatures on the plans. For example, the valuation of the project as listed on the permit application is $6771, 20% of which is $1400. The code requires that in addition to your basic construction budget, a minimum of $1354 must be spent on accessible upgrades unless the spacefully complies with accessibility requirements ofIEBC 410.7. Possiblefeatures that could be consideredfor upgrades might include accessible toilets and sinks, restroom grab bars, door sizes and approach space, door hardware, etc. 2. Upon thorough review of the proposedproject, this new item must be addressed. According to IBC 903.2.6 (Washington State amendment, effective beginning in 2016) afire sprinkler system is required for 1-4 daycares with an occupant load ofgreater than 100, regardless of exiting provisions. Since the entire building comprises a singlefire area, due to non -separated occupancies, the occupant load of the entire building counts toward the applicable occupant load number. Note on the plans that a separate permit will be requiredforfire sprinklers. IEBC407.1 Thank you, Page 1 of 2 Autumn, I have been chewing over your ADA Compliant list and find that it does not cleanly address the code requirement. There are several issues I am concerned with. 1. First of all, my comment requested a letter format (however, I am flexible on the format) that compares the cost of the upgrades to the overall project cost, and results in a percentage being shown (20% is the minimum.) Please provide the numbers for comparison. 2. Not all of the items on t he ADA Compliant list can be considered as true "upgrades" to accessibility, as many of them are basic code requirements already, such as flooring, entry door/36", etc. And some of the items are listed on the plans as already existing, such as the existing restroom door. These types of items are not eligible to be counted against the 20%. 3. 1 suspect that the original valuation of $6771 listed on your permit application needs to be adjusted upward in order to fairly include some of your adjusted basic costs such as the more robust construction of the clemising wall, and other elements that have been added since the first permit review. Once that number is adjusted, it can be used as the baseline for figuring the 20%. Also, how does the original valuation of $6771 compare to the total cost of $21,931.22 of ii upgrades" shown on the top of the ADA Compliant list you sent? Please call or come in if you would like to discuss. Thank you. Leif