Loading...
3838_001.pdfC �M� 1ENGINCBERING July 18, 2018 civil & structural engineering & planning Chuck Miller, Plans Examiner City of Edmonds Development Services, Development Services Department 1215 1 Avenue N Edmonds, WA 98020 RE: Application #: Project Name: Project Address: Dear Mr. Miller, BLD20171841 Graphite Art Studios 202 Main Street Itemized below is our response to the review comments in the June 18, 2018 letter for the above referenced project. Our response appears in bold. 10. Sheet 11 — Allowable Capacities per Geotech — Skin Friction — Clarify the noted value in tons per square foot (tsf). it does not appear to correspond with that indicated on sheet W (a copy of the 'Lateral Earth Pressures Temporary Soldier Pile Wall' detail referenced in the 'Soldier Pile Shoring and Lagging Design Parameters' section (page 17) of the provided 'Geotechnical Engineering Report' — Project No. 1798.01 — prepared by ZipperGeo). The response to the earlier plan review comment states: "This was an error. The soil friction value has been updated, and the calculated capacity is still greater than the design load. Please see the attached revised calculations with the updated sheet 11.". The only calculations provided in response to the earlier plan review comments are those regarding the site retaining walls. The resubmitted cover sheet and page 19 of the 'Geotechnical Engineering Report' — Project No. 1798.01 — prepared by ZipperGeo do not appear to be different than that submitted earlier, beyond the date and being designated as a 'draft'. Please refer to page 11 of the attached Structural Calculations for the shoring wall dated 08/08/2018 which address the comment above. Additionally, revisions were made to the north and west soldier pile walls to allow for deeper excavation due to potential soil contamination. The plan and wall profiles have been updated based on the original calculations to allow for a potential excavation of 12ft below the existing grade. 11. General plan review comment — Sheet 2 - Clarify the difference in the naming convention used to identify the various elements of the retaining walls and of that used on sheet 'C3.2' — Grading and Drainage Details — Detail 4 and Detail 5. While technically correct, the uses of lower- and upper-case letters should be consistent throughout the submitted proposals. SEP 2 0 2018 BURL-DINU DEPARTMEN1 TY OF EDMONDS 250 4th Avenue South, Suite 200 Edmonds, WA 98020 ph. 425.778.8500 1 f. 425.778.5536 www.cgengineering.com Graphite Art Studio 16259.22 Comment Response —Building Comments #2 August 8, 2018 Page 2 of 3 Most of the retaining walls support building columns. The details have been removed from the civil drawing and moved to the structural plans under permit BLD20180970. Please refer to the structural plans for retaining wall details and calculations. 12. Sheet 2 — Site Retaining Walls a. Retaining Wall — Typ. Condition (refer to det. 4/C3.2) — Clarify the difference in the noted width of the 'heel' (identified as V) of the 5 foot high wall and of that specified on sheet 'C3.2' — Grading and Drainage Details — Detail 4 — Retaining Wall Section at NW Corner — Retaining Wall Sched u le. — Wa I I Type 2. b. Retaining Wall — Reversed Retaining Dir. (refer to clet. 5/C3.2) — Clarify the difference in the noted width of the 'toe' (identified as V) of the 3 foot high wall and of that specified on sheet 'C3.2' — Grading and Drainage Details — Detail 5 — Retaining Wall Section at NE Corner — Retaining Wall Schedule —Wall Type 1. See comment 11. 13. Sheet Sheet/page 4 — 4' site wall — case 1 calculation - Clarify the difference in the noted width of the 'heel' of the 4 foot high wall and of that specified on sheet 'C3.2' — Grading and Drainage Details — Detail 4 — Retaining Wall Section at NW Corner — Retaining Wall Schedule — Wall Type 1 — and in the provided structural calculations on 'Sheet 2' —Site Retaining Walls - Retaining Wall — Typ. Condition (refer to clet. 4/C3.2). See comment 11. 14. Sheet/page 5 — 4' site wall — case 2 calculation - Clarify the difference in the noted width of the 'heel' of the 4 foot high wall and of that specified on sheet 'C3.2' — Grading and Drainage Details — Detail 4 — Retaining Wall Section at NW Corner — Retaining Wall Schedule — Wall Type 1 — and in the provided structural calculations on 'Sheet 2' — Site Retaining Walls - Retaining Wall — Typ. Condition (refer to clet. 4/C3.2). See comment 11. 15. Sheet/page 6 — 5' site wall — case I calculation - Clarify the difference in the noted width of the 'heel' of the 5 foot high wall and of that specified on sheet 'C3.2' — Grading and Drainage Details — Detail 4 — Retaining Wall Section at NW Corner — Retaining Wall Schedule — Wall Type 2 — and in the provided structural calculations on 'Sheet 2' — Site Retaining Walls - Retaining Wall — Typ. Condition (refer to clet. 4/C3.2). See comment 11. 16. Sheet/page 7 — 5' site wall — case 2 calculation - Clarify the difference in the noted width of the 'heel' of the 5 foot high wall and of that specified on sheet 'C3.2' — Grading and Drainage Details — Detail 4 — Retaining Wall Section at NW Corner — Retaining Wall Schedule — Wall Type 2 — and in the provided structural calculations on 'Sheet 2' — Site Retaining Walls - Retaining Wall — Typ. Condition (refer to clet. 4/C3.2). See comment 11. 17. Sheet/page 8 — 3' reversed grade — case 1 calculation - Clarify the difference in the noted width of the 'heel' of the 3 foot high wall and of that specified on sheet 'C3.2' — Grading and Drainage Details 250 4th Avenue South, Suite 200 4MOII Edmonds, WA 98020 0- ph. 42S.778.8500 I f. 425.778.5536 (ENGINEERING www.cgengineering.com Graphite Art Studio 16259.22 Comment Response —Building Comments #2 August 8, 2018 Page 3 of 3 — Detail 5 — Retaining Wall Section at NE Corner — Retaining Wall Schedule — Wall Type I — and in the provided structural calculations on 'Sheet 2' — Site Retaining Walls - Retaining Wall — Reversed Retaining Dir. (refer to clet. 5/C3.2). See comment 11. 18. Sheet/page 9 — 3' reversed grade — case 2 calculation - Clarify the difference in the noted width of the 'heel' of the 3 foot high wall and of that specified on sheet 'C3.2' — Grading and Drainage Details — Detail 5 — Retaining Wall Section at NE Corner — Retaining Wall Schedule — Wall Type 1 — and in the provided structural calculations on 'Sheet 2' — Site Retaining Walls - Retaining Wall — Reversed Retaining Dir. (refer to clet. 5/C3.2). See comment 11. 19. Sheet/page 11 — 4' reversed grade — case 1 calculation - Clarify the difference in the noted width of the 'heel' of the 4 foot high wall and of that specified on sheet 'C3.2' — Grading and Drainage Details — Detail 5 — Retaining Wall Section at NE Corner — Retaining Wall Schedule — Wall Type 2 — and in the provided structural calculations on 'Sheet 2' —Site Retaining Walls - Retaining Wall — Reversed Retaining Dir. (refer to clet. 5/C3.2). See comment 11. If you have any questions or comments regarding the responses to this review, please do not hesitate to call. Sincerely, CG Engineering Dennis Titus, PE, SE Project Manager 250 4th Avenue South, Suite 200 Edmonds, WA 98020 ph. 425.778.8500 1 f. 425.778.5536 CENGINE-rERING www.cgengineering.com