Loading...
4.18.18 - Geo Report on Rockery.pdfNELSON EOT C ICAL AssoCIATES, INC. GEOTECHNICAL ENGINEERS & GEOLOGISTS Main Office 17311 — 135" Ave NE, A-500 Woodinville, WA 98072 (425) 486-1669 • FAX (425) 481-2510 MEMORANDUM DATE: April 18, 2018 TO: Mr. Derek Abbott CC: Mr. Ron Johnson FROM:, Khaled M. Shawish, PE Lee S. Bellah, LG RE.: Reinforced Rockery Design Change Abbott Residence Rockeries 16404 — 751 Place West Edmonds, Washington NGA File No. 9175B 16 Engineering -Geology Branch 5526 Industry Lane, #2 East Wenatchee, WA 98802 (509) 665-7696 • FAX (509) 665-7692 This memo presents our updated geotechnical recommendations and opinions regarding reinforced rockery construction for the residence project located at 16404 — 75" Place West in Edmonds, Washington. INTRODUCTION We have previously prepared a geotechnical engineering evaluation for the project titled "Preliminary Geotechnical Engineering Evaluation — Abbott Residence — 16404 - 75" Place West — Edmonds, Washington," dated March 27, 2015. We also performed part-time construction monitoring for the residence construction. Recent Observations and Recommendations We met on -site on April 16, 2018 for a preconstruction meeting to discuss project plans prior to building the rockeries throughout the site. The earthwork contractor brought to our attention that the wall drains for the two lower western rockeries will not be able to tie into the existing storm system as the elevation of the rockery drains will be several feet higher than the existing storm system. The two rockeries are each approximately 4-feet high and are separated by an approximately 7-foot bench. We discussed options with the contractors and concluded that omitting the drain should not adversely impact the wall as there are free -draining layers of crushed rock and quarry spalls behind and beneath both walls, which will allow water to migrate through and mitigate ponding of water. Reinforced Rockery Design Change Abbott Residence Rockeries Edmonds, Washington NGA Project No. 9175B 16 April 18, 2018 Page 2 It is our opinion that omitting the wall drains for the two tiered rockeries on the western edge of the site should not affect stability or performance of the rockery walls, provided that the specifications detailed in our previous report and rockery design memos are strictly followed. We should be retained to review final rockery locations and plans, provide construction monitoring services during rockery construction, and to evaluate subgrade conditions, cut conditions, fill compaction, geogrid installation, and drainage installation. We trust this memorandum should satisfy your needs at this time. Please contact us if you have any questions or require additional services. r 6=6 NELSON GEOTECHNICAL ASSOCIATES, INC.